Skip to content
Request a callbackCallback
Red-brick Victorian mansion houses on a Kensington street in London, blue sky, white sash windows and a stone balcony

Convert a House into Flats

Large period houses split into premium apartments that pass planning, building control and a lender's survey.

Our track record

100% of projects delivered ahead
of programme and on budget

Rob Barton, Development Director: record from earlier roles

  • 10,000+homes through planning
  • 4,000+homes delivered
  • 4 weeksfor Craftex to test a vacant St John's Wood building as flat schemes, drawn and costed
  • 0snags at Craftex handover, the completion file ready for your buyers

How many flats can your house hold?

Craftex helps owners convert a house into flats in London: the planning case, layouts that meet the space standards, Building Regulations and the build, under one contract. Before you spend on drawings, we check how many flats the house can hold and where your council stands on the split.

Large Victorian and Edwardian houses in Kensington, Hampstead, St John's Wood and Belsize Park make the finest conversions. We turn them into apartments with generous rooms, high ceilings and the period detail buyers pay a premium for. On Allitsen Road in St John's Wood, a vacant corner building became four costed layouts, from four flats to seven, in four weeks.

Craftex ground floor plan for Allitsen Road: two flats in colour around a shared stair and lift

Planning, space standards and the split

Craftex design options summary for Allitsen Road: four schemes stacked floor by floor, from four to seven flats with their sizes

Two answers set the value of the scheme: how many flats the house can hold to the space standards, and whether your borough allows the split at all. Many London boroughs protect smaller family houses, so we read the policy and recent decisions on your street before anyone draws. See how we work as a construction partner for developers and investors.

Read more

Using one house as two or more separate homes is a material change of use, and no permitted development right covers it, so converting a house into two flats or more always needs a full planning application. A listed house also needs listed building consent.

Each new flat is measured against the nationally described space standard. In London a one-bedroom, two-person flat needs 50 m² and a two-bedroom, four-person flat 70 m², with a 2.5 m ceiling over at least 75% of the floor. The stair, a lobby and fire separation take space too, so the count is set room by room, not by dividing the floor area.

Under the Building Regulations the conversion is a material change of use as well: fire-resisting separation between flats, a protected escape route, sound insulation proven by testing, ventilation, energy upgrades, drainage and separate services. A flat conversion of a period house is a house conversion in the planning sense; the rules above apply whichever word you search for.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does a house to flats conversion include?

From the layout check to the last certificate, one contract and one team, so the scheme you approve is the scheme you sell. Thinking of rooms let individually rather than flats? That is a different licence and a different planning route: see HMO conversion.

Architect's drawing of a townhouse alteration, with front elevations and floor plans before and after

Layout and feasibility check

How many flats, which mix and what each is worth, tested against the space standards before you commit.

Printed architectural floor plans of an apartment block spread across a table

Planning application

Drawings, design and heritage statements, and the borough's family-housing policy answered in the application.

Stripped-out floor with new metal stud partitions, exposed ceiling insulation and plasterboard sheets ready to fix

Fire and sound separation

Fire-resisting floors between flats, a protected stair and acoustic upgrades that pass the completion tests.

Services cupboard with meters, distribution boards and cable runs, fitted during the works

Separate services and meters

Supplies, meters, soil stacks and heating sized for each home, so every flat can be sold on its own.

Period staircase with a white balustrade, carpet runner and dark handrail, seen from above

New stairs, entrances and lightwells

A common stair, front doors and, where the house allows it, lightwells that bring daylight to the lower floor.

Double-height living room with curved velvet sofas around a round ottoman and full-height windows

Finishes ready to sell or let

Kitchens, bathrooms and joinery to the standard your buyers expect at the address.

How it works

How does converting a house into flats run?

01

Free layout check

Send us the address, rough floor areas and a few photos. We say how many flats the house could take and what your borough's policy says.

02

Survey and options

We measure the house, draw layout options to the space standards and price each one, so you choose the scheme on numbers.

03

Planning application

We prepare and submit the full application: drawings, design statement, heritage notes where needed, bins and cycles.

04

Technical design and agreed figure

Structure, fire strategy, acoustics, services and the Building Regulations application, then the figure we sign, shared with your lender.

05

Build and handover

Our own crews on site; sound tests, the completion certificate and every service certificate come with the keys.

Cover of the free Craftex Guide to Planning and Prior Approval

The Craftex Guide to Planning and Prior Approval

Converting a house into flats is a full planning application. The guide sets out the routes side by side, the statutory time limits, a checklist of documents for your application and the refusal reasons we see most.

Our promises

Six promises, written into your contract

These are terms, not taglines: they go into every contract for a house we split into flats.

  1. One owner of every answer

    Planning, drawings, structure, services and finishes on one contract, so nothing is lost between consultants.

    Allitsen Road: four flat schemes, drawn and costed by one team

  2. The signed figure holds

    Any change is costed, put in writing and approved by you before it is built.

    Google review, shop into two rental flats in Chelsea: the quote held

  3. Ready for your sale or letting date

    One programme, with design and procurement run in parallel.

    Office into 8 apartments: the client exited 2 months ahead of competing timelines

  4. Built with our own labour

    Most of the crew are our own people, so the programme does not wait for an outside trade.

    Google review, warehouse near Tower Bridge into 4 flats: on plan and on time

  5. Cover your lender accepts

    £10M public and employers' liability and professional indemnity on request, with ISO 9001, 14001 and 45001 certification.

    Collateral warranties from our consultants and designers

  6. Every certificate in the folder

    Handed over with the file your solicitor, lender and buyers ask for.

    A 12-month defects period that can be extended, and up to 10 years of warranty

Example house to flats conversion quotation from another contractor with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Got a price from another builder for splitting your house? Pass it to us for a reply the same working day and, after a survey, we put a lower figure and a firm programme against it for the same scope.

Compare your quotes

Where do house conversions fail building control?

Most failed conversions fail late, at the final inspection or the sound test, when the money is already spent. Here is where, and how we avoid it. A conversion is signed off by building control as a material change of use. The inspector looks hardest at fire, sound and escape, which is why we fix all three in the design, not on site.

AreaThe usual riskWith Craftex
Sound testingOld timber floors that fail the pre-completion sound test, then come up againFloor and ceiling build-ups designed to pass before the first board is laid
Fire separationGaps in the fire-resisting floors and doors found at the final visitFire strategy agreed with building control at design stage, checked as each floor closes
The escape routeA stair that is not protected, or a top flat with no safe way outA protected common stair drawn into the layout from the first option
The flat countFive flats on the sketch that only pass the space standards as fourEvery room checked against the standards before you pay for planning drawings
Services and metersShared supplies and drainage that block a separate sale of each flatSeparate meters, stacks and supplies planned flat by flat
Paperwork at handoverMissing certificates and a sale that waits on themThe completion certificate and every test result in the folder on the day

What decides the budget for a flat conversion?

Six things move the budget for a house split into flats. Each is settled in writing ahead of the contract, so the agreed figure is the one you pay.

DecisionWhat moves the budgetWhat we fix before you sign
Number of flatsMore kitchens, bathrooms, front doors and metersThe flat count and mix tested against the space standards
Structure and stairsNew steels, openings and a protected common stairA structural survey and the stair layout drawn
Fire and sound separationUpgraded floors, ceilings and fire doors between flatsFloor build-ups and the fire strategy agreed with building control
Services and metersSeparate supplies, meters, soil stacks and heatingA services plan for every flat
Planning conditionsConditions, Community Infrastructure Levy, party wall awardsEvery obligation listed and costed in the appraisal
FinishesKitchens, bathrooms, joinery and flooringA specification matched to the sale or rental values

Planning fees, CIL and utility connections sit outside the build figure. Conversion work that changes the number of homes can qualify for the reduced 5% VAT rate; we confirm the rate in writing before the contract.

Free cost calculator

What will your house to flats conversion cost?

Put in the house's gross internal floor area and choose a tier: a first range shows at once, worked from our 2026 London rates.

Your estimateEnter your spaceex VAT and fees Get a fixed figure

Indicative, ex VAT and fees, for the build alone. New floor area from an extension adds about £1,980 per m² built. A survey comes before your fixed figure.

Flat conversions across London boroughs

Pair of yellow-brick Georgian townhouses with white sash windows and black front doors

Inner London. Camden, Islington, Hackney, Lambeth and Kensington and Chelsea hold some of London's finest period houses and some of its strictest family-housing policies. We read the borough's rules and recent decisions on your street before a layout is drawn.

Large period brick house with gabled wings, bay windows and tall chimneys in a mature garden

Outer London. In Hampstead, Highgate, Richmond, Wimbledon, Ealing and Barnet the large detached and semi-detached villas often have the floor area for three or four generous flats, a garden flat among them.

Read more

Many boroughs protect smaller family houses: Lambeth protects homes under 130 m² as originally built, and Brent looks for 130 m², or a house that can reasonably be extended to it, plus a three-bedroom flat. Some councils want a family flat with garden access on the ground floor. Flat conversions in London also meet the London Plan space standards. We work across Kensington, Hampstead, St John's Wood, Islington, Highgate, Richmond and Wimbledon.

Our team

  • in

Converting a house into flats: your questions

Is planning permission needed to split a house into flats?

Yes, always. There is no permitted development right to split a house, so converting a house into 2 flats or more is a full planning application. Read the planning rules for converting a house and the 2026 fee schedule.

Can I convert my house into two flats and live in one?

Yes. Many owners keep the garden flat or the upper maisonette and sell or let the other. The planning application and Building Regulations are the same as for a full sale.

How long does a house to flats conversion take?

A council has a statutory 8 weeks to decide a minor application, which covers fewer than ten flats, and many London decisions run longer on an agreed extension. Your build programme is written into the contract. See how long planning permission takes.

Is an HMO a better route than flats?

It depends on the house and the borough. An HMO lets rooms under a licence; flats are sold or let as separate homes. Compare the two on HMO conversion.

Which London boroughs resist conversions?

Boroughs with strong family-housing policies, Lambeth and Brent among them, set a minimum original size of about 130 m² before a house can be split, and some ask for a family-sized flat. We check your borough's thresholds in the free layout check.

How many flats can my house be split into?

As many as meet the minimum sizes with daylight, storage and a safe way out, and as many as your borough's policy accepts. The free layout check gives you the number. See minimum sizes for new flats.

What Building Regulations apply to a flat conversion?

Fire separation, a protected escape, sound insulation proven by testing, structure, ventilation, energy upgrades, drainage and separate services. Old timber floors are where fire and sound upgrades cost most.

What makes one conversion cost more than another?

The number of flats, the structure and stair, fire and sound upgrades to old floors, separate services and the finish. The calculator above gives a first range; the figure we sign follows a survey.

Do the flats need separate meters and entrances?

In practice, yes: buyers and lenders expect each flat to have its own meters and supplies. Each flat needs its own front door off a protected common stair or its own street entrance.

How fast do you reply?

The same working day. Share the address and roughly how big the house is, and one of our directors replies with a first view of the flat count.

What our clients say

See all reviews on Google
  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Send us your house for a free layout check

Tell us where the house is and its rough floor area. We will come back to you the same working day.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us