Skip to content
Request a callbackCallback
Golden-hour aerial view over the Thames, Tower Bridge and the riverside buildings of central London

Development Site Sourcing

Off-market sites from our live projects, with the numbers and planning chance proved before you buy.

Our track record

100% of our projects finished ahead
of programme and on budget

Rob Barton, Development Director: record from earlier roles

  • £225M+of land acquired
  • 10,000+homes through planning
  • 4,000+homes delivered
  • £6.0MGDV of the scheme Craftex recommended for a derelict club bought at auction (Allitsen Road)

We work for the buyer, not the seller

We source off-market development sites and buildings across London and the UK for developers, investors and family offices. Every deal is tested before you offer: planning chance, build cost from our own team and a residual appraisal, as on the Allitsen Road study (£6.0M GDV).

Aerial view of the derelict corner club at 74 Allitsen Road, St John's Wood, bought at auction by our client
Red-brick period building with tall arched sash windows, the kind of site we test before you buy

Good sites rarely wait for a portal, and the pack you are sent is written for the seller. We sit on your side as the buyer's representative. Our live projects bring us off-market sites, and we have deals on the table today. We source across London and the UK and test each one before you commit.

A director replies with what matches, the same working day. See how we work as a construction partner for developers and investors.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

How do we find development sites before they reach the market?

From the first lead to the keys, the people who check the deal are the people who can deliver it.

Tower cranes over a new building rising between offices in the City of London

Off-market deal flow

Property deal sourcing for developers and investors: land, derelict and brownfield buildings and airspace that reach us through our own projects and contacts, matched to your budget, area and strategy.

Our appraisal of 74 Allitsen Road: four schemes costed, Option 3 at £2.51M build cost against £5.87M GDV

Appraisal and viability

GDV, build cost, fees, finance and profit worked through, so you know what the site is worth to you.

Two engineers in hi-vis pointing at a site plan spread on a table

The planning chance

Without consent, an honest read of the odds. With consent, a check of the conditions and the obligations behind it.

Our risk register for 74 Allitsen Road: 14 risks named before exchange, from affordable housing to party walls

Every risk named

Title, access, contamination, rights of light, affordable housing and CIL listed before exchange, each with a cost.

Handshake over signed documents at a meeting table

Terms negotiated for you

Price, conditions, timing and exclusivity argued on your behalf, with the numbers as our case.

New-build block under construction beside a brick building, with scaffolding and a crane

Planning, design and build

After completion the same team can take the scheme through consent, design and construction.

How it works

How do we find and test your next site?

01

Your brief

Budget, target areas, strategy and timescale. We ask for proof of funds or funding in place before we send deals.

02

Deals matched

We put forward what fits from our own pipeline and the open market, and say why each one made the list.

03

Numbers and planning

Full appraisal, viability and planning view on the deal you pick, with the risks set out in writing.

04

Terms agreed

We negotiate price and conditions on your behalf, then your solicitor takes it to contract.

05

From purchase to keys

If you want, our team runs planning, design and the build, so the appraisal is the plan. We can introduce the lenders we work with on our own projects: property development finance.

Step one is your brief, and it commits you to nothing. Terms come in writing before any work starts.

Cover of the free Craftex Development Feasibility Checklist

The Craftex Development Feasibility Checklist

The checks to run on a site before you make an offer: planning and title, value and cost, the obligations that move the numbers, and a go or no-go scorecard.

Our promises

Six promises, written into your contract

  1. On your side of the table

    When you instruct us to source, our client is you, not the seller.

    More than £225M of land bought for development by our Development Director in his previous roles.

  2. The numbers proved first

    No deal reaches you on a headline figure; it comes with an appraisal built from real build costs.

    Four schemes costed trade by trade in four weeks.

  3. The planning odds, told straight

    If consent is a long shot, you hear it before you pay for it.

    A Development Director who took 10,000+ homes through planning before he joined us.

  4. Risks priced before exchange

    The costs that appear after completion are found while you can still walk away.

    A vacancy credit able to cut over £1M, guarded by a day-one instruction.

  5. A no when the deal is wrong

    If it does not stack up, we say so, even when a yes would pay us.

    The client steered away from £240k of excavation.

  6. One team after you buy

    Planning, design and construction by the people who tested the deal.

    Every Craftex project finished ahead of programme and on budget.

Example of an agent's deal pack appraisal for a vacant commercial building, with the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Been sent a deal by an agent? Send us the pack. A director reads the appraisal and the planning position and gives you a free first view of whether it stacks up.

Compare your quotes

Where do site purchases usually go wrong?

AreaThe usual riskWith Craftex
Whose sideThe agent who sends the deal is paid by the seller, usually on the price achieved.We are instructed by you, so our job is a deal that pays you.
The numbersA sales pack with top-end values, the most units and a generic build rate per square foot.Values from recent local evidence and a build cost from the team that would carry out the work.
Planning"Subject to planning" sold as if the consent were already granted.The policy, the history and the street's precedents read first, and the odds stated plainly.
SpeedThe best sites sell before a portal listing, and reports arrive after the deadline.Off-market leads from our live projects, and a first view on any deal while it is still open.
Hidden costsAffordable housing, CIL and sprinkler thresholds discovered after exchange.Planning money and building-safety lines modelled in the appraisal before you bid.
After completionYou own the site, then start hunting for a planner, an architect and a builder.Our team stays on for planning, design and the build, so nothing is handed over cold.

How does property deal sourcing with us work?

Property deal sourcing, done our way, means we find a site for you and prove its numbers before you offer. Terms are agreed deal by deal and client by client. These are the three shapes they usually take.

BasisHow it worksSuits
FeeTypically an upfront fee plus a success fee when you complete.Buyers who want a representative and will run the scheme themselves
PercentageA share linked to the deal, agreed before we start.Repeat buyers with a steady brief
Joining the dealWe come in as a joint venture partner, together with our planning, design and build services.Investors who want a partner to deliver the scheme with them

We publish no fee levels. Tell us about your deal and we agree terms in writing before any work starts. Our range runs from £3M to £150M of finished value.

Investment property in London: buy a site, add value

Converted warehouse floor with exposed brick piers, full-height glazing and a light oak floor

Much of the investment property for sale in London is let as it stands, and its price already reflects the rent it earns today. We look for the other kind. We source buildings where planning, a conversion, an extension or extra floors can add value, often off-market property in London that never reaches a portal. Then we prove that uplift before you buy, and our own team can deliver it. Read how to add value to investment property in London through development, or browse the development opportunities we find and test.

Our team

  • in

Buying development land and sites, your questions

Do you have development land for sale right now?

Yes. Because we are active on live projects, off-market deals come to us, and some are on the table today. We do not advertise them. Tell us your budget, areas and strategy, show proof of funds, and we share what fits. See the kinds of development opportunities we find and test.

How do you find off-market development sites?

Through the work itself. We develop and build inside the industry, and that is where unadvertised sites find us. When an open-market or auction lot suits your brief, we test it the same way.

What is property deal sourcing, and how are sourcers paid?

It is finding a property deal for a buyer, checking it and bringing it to them for a fee. Many sourcers sell buy-to-let deals for a fixed fee; some are paid by the seller instead. Ask who pays the sourcer, because that shows whose side they are on. Our article on property deal sourcing for developers covers the models and the rules.

Can you find a building to add value to, not just land?

Yes. Commercial buildings, freehold blocks of flats and mixed-use property are often worth more after a new consent, a conversion, an extension or extra floors. We prove that uplift before you buy, then our team can deliver it, from commercial to residential conversion to the build.

Do you look at derelict buildings and brownfield sites for sale?

Often, because that is where value hides and where surprises cost most. Our Allitsen Road study shows how we test one: a vacant former club, four schemes designed and costed, and the vacancy history protected before anyone touched the building.

Why do you ask for proof of funds?

Because good deals move fast and sellers favour buyers who can complete. Proof of funds, or funding agreed, lets us put you forward with confidence and keeps our time for buyers ready to act.

What size of deal do you work on, and where?

Our minimum is £3M of gross development value, and we take schemes up to £150M: flats, build to rent, conversions and mixed use. We source across London and the UK; tell us your target areas and we will say honestly what we can find there.

I own land and want to sell it. Is this the right page?

No, this service is for buyers. If you are a landowner, see how we help you sell land to a developer: sale, option, promotion or partnership, chosen for your goals.

Do you list development sites for sale?

No. We run no public listings of plots or development sites for sale. The sites we source go only to buyers with a matching brief. Portals and auction houses list open-market lots, and we will test one of those for you too. If you are weighing up a plot that already has consent, start with buying land with planning permission.

Who do you act for: the buyer or the seller?

The buyer. On a sourcing instruction you are our client, and our task is a purchase that makes you money. We negotiate against the seller's agent, not alongside it.

Do you source land with planning permission for sale, or land without it?

Both. Without consent we give you an honest view of the planning chance and what it is worth. With consent we check the conditions, the obligations and whether the approved scheme can be built for the sales values. More in our guide to the real numbers behind a development site for sale.

Do you source airspace and rooftop development sites?

Yes. A roof with room for new storeys is a development site in its own right. We check the structure, the planning context and the freeholder's position, then whether the extra floors pay. See our airspace and upward extension development service.

How do you charge for sourcing a site?

Terms are agreed per deal. We can work on a fee, part paid upfront and part on success, on a percentage, or by joining the deal as a partner. Get in touch and we agree terms for yours.

What happens if the deal does not stack up?

We tell you, with the numbers that show why, and you walk away before spending on lawyers or surveys. Sometimes a smaller scheme or a lower price fixes it, and we will say which.

Can you take the scheme on after I buy?

Yes, and it is the route we recommend. The same team runs planning, design and construction, so the appraisal you bought on becomes the plan we deliver. If you want a partner rather than a contractor, ask about a joint venture.

What our clients say

See all reviews on Google
  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Tell us what you're looking for, or ask what we have right now

Send your budget, your target areas, your strategy and whether proof of funds is ready. A director reads your brief and comes back with the deals that fit.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us