Solar Panels and Battery Storage for Homes
For prime London homes, listed and conservation areas included.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 1contract and one director for the roof, the wiring, the battery and the heat pump
- 0visits our Kensington penthouse client had to make during a 12-week rebuild
- 0snags at handover, with every certificate in your file
- 10 yearsbuilding in London since 2016, behind every guarantee we hand over
One contract for the roof, the panels and the battery
Craftex designs and installs solar panels and battery storage for prime London homes, from Hampstead and Highgate to Kensington and Chelsea: solar panels London homes can carry on slate, parapet and conservation roofs. We take the consents, the roof, the electrics and the installation under one contract, so the house looks the same from the street and costs less to run.
Most London houses were never designed for panels, batteries or heat pumps. Slate roofs, parapets, conservation rules, an old fuse board and no obvious place for a battery all get in the way. You deal with one director, work to one date and receive one file of certificates. If the house is being renovated, the system goes in while the walls are open.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Everything a home energy system needs, under one contract
Panels, battery, charger and heat pump planned together, so they share one supply and one survey. See how we work as a design and build partner for homeowners.
Solar panels
On the roof, set into it or on a flat roof behind the parapet, laid out from your usage and the shade your roof gets.
Home battery storage
Sized to your evenings, charged by the sun or cheap overnight power, and mounted where it is safe to live with.
EV chargers
A smart charger on the drive or in the garage, fed by the panels and managed so the main fuse never trips.
Air source heat pumps
Sized from a room-by-room heat-loss survey, with the radiators and hot water cylinder to match, and a quiet spot outside.
Electrics and roof made ready
Consumer unit, earthing, cable routes and any slipped slates dealt with first, so the system starts on sound ground.
Listed and conservation homes
Arrays kept out of street view, fixings that can be reversed, and the consent application drawn up by our planners.
How it works
How a home energy project runs with us
01
Send us the basics
Your address, a photo of the roof and last year's electricity use. That is enough for a first layout and the planning route.
02
Survey and design
We check the roof structure, the shading, the fuse board and a safe home for the battery. Then you get a layout and a fixed figure.
03
Consents and grid
Planning or listed building consent, a freeholder's licence for a flat, the network operator's approval and the heat pump grant paperwork, all handled for you.
04
Install, house protected
Scaffold up, rooms covered, cables run through voids rather than chased into plaster. The roof is made good before the scaffold comes down.
05
Switch-on and paperwork
Commissioned, tested and shown to you on the app, then one file with every certificate and warranty.
The Craftex Guide to Clean Energy Integration
How panels, batteries, chargers and heat pumps share one supply in a London house, where the equipment should live, and which certificates to keep for your insurer, energy supplier and future buyer. Free, and a short read.
Our promises
Six promises, written into your contract
-
One firm, one director
Design, roofing, wiring and installation sit with one firm, and one director answers for the whole system.
Medusa, Knightsbridge: design, strip-out and fit-out of four floors by one team.
-
The signed figure holds
Your price is fixed for the written scope; any change is priced and approved in writing before work goes ahead.
Every Craftex project to date has finished on budget.
-
Your home keeps running
Rooms protected, power switched over in agreed windows, and working hours set with you and your neighbours.
Kensington Olympia: rebuilt inside a fully occupied building, and the client never had to visit.
-
Switched on by your date
Equipment, scaffold and the grid application are booked early, and the completion date is written into the contract.
Beaumont House, West Kensington: 750 sq m refurbished in 3 weeks, where other quotes said 12.
-
Cover your insurer expects
£10M public liability and £10M employers' liability, professional indemnity on request, ISO 9001, 14001 and 45001, and CHAS.
The accreditations shown at the foot of this page.
-
Zero snags, every certificate
Commissioned, tested and explained before we leave, with the papers your insurer, energy supplier and future buyer will ask for.
Kensington Olympia: zero snags or defects at handover.
Already have a quote? Send it to us. We'll beat it.
Holding a solar, battery or heat pump quote? Send it to us with a photo of the roof. A director marks what it leaves out and replies the same working day; our figure for the same system follows a survey.
Compare your quotes
Where home solar projects usually go wrong, and what we do instead
| Area | The usual risk | With Craftex |
|---|---|---|
| Responsibility | A solar firm, an electrician, a roofer and a heat pump company, each blaming the others when output disappoints. | Roofing, electrics, storage and heating sit under one contract, and one director answers for every part. |
| The final bill | The quote covers panels only, then scaffold, a new fuse board and roof repairs arrive as extras. | Scaffold, electrical upgrades and roof repairs are surveyed and priced before you sign anything. |
| Disruption | Muddy boots on the stairs, cables chased through finished plaster and an outdoor unit under the neighbour's bedroom window. | Floors and finishes protected, cable routes planned in advance, and the outdoor unit sited where nobody will hear it. |
| The date | Panels on the roof in spring, then weeks of waiting for the network operator before anything switches on. | The grid application goes in at design stage, so the system can run the day the work finishes. |
| Compliance | Panels on a listed roof without consent, or a battery fitted beside the only way out of the house. | Consents, the freeholder's licence and the battery location are settled before anyone climbs a ladder. |
| Handover | An app login and a phone number that stops answering when the installer closes down. | Certificates, warranties and export paperwork handed over in one file by a company trading since 2016. |
What sets the cost of solar panels and a battery?
Six things move the figure for a London home more than the panels themselves. We survey each one and settle it in writing before you sign, so the price you approve is the price you pay.
| What | What moves the budget | What we fix before you sign |
|---|---|---|
| Roof type and orientation | Slate, tile or flat roof behind a parapet, the shade it gets and the way it faces | A panel layout from the survey and a shade check |
| Listed or conservation consent | Whether permitted development applies, or consent and a hidden layout are needed | The planning route, drawn up by our planners |
| Battery size | How much of the day's output you use in the evening, and your tariff | A battery sized to your bills |
| Fuse board and electrics | An older consumer unit, earthing and long cable runs in a tall house | An electrical survey and the upgrade, priced |
| Scaffold and access | Tall terraces, rear access only, parapets and neighbours | An access plan agreed with you and your neighbours |
| Heat pump or EV in the same visit | One survey, one scaffold and one supply upgrade for all of it | A whole-home plan with one date |
Installing solar panels, batteries and heat pumps in a home carries 0% VAT until 31 March 2027, then 5%.
Free cost calculator
What will solar cost for your home?
Enter the roof area you could cover with panels and pick a system for an instant range at our 2026 rates. Your fixed figure follows the free home energy survey.
Home battery storage for a large London home
A large house uses most of its power in the evening, when the panels are winding down. A battery sized to your bills stores the midday output for those hours, charges on cheap overnight rates in winter and, with a backup-ready inverter, keeps chosen circuits running in a power cut.
Read more
Home battery storage is sized in kilowatt-hours from twelve months of usage, not from the size of the roof. Solar battery storage pays most where evening demand is high: an EV on the drive, heating by heat pump, or a tariff with cheap night hours. The battery lives in a garage, plant room or utility room, away from escape routes, with fire detection nearby. Our guide to what a home battery costs sets out published prices.
Prime London projects we have delivered
Prime-home projects; energy systems are fitted as part of work like this. Related work: Medusa, Knightsbridge and Beaumont House, West Kensington.
-
Knightsbridge: a prime home Herbert Crescent: a £1.5M, 450 m² prime home refurbished in 32 weeks with bespoke joinery. View case study
-
Kensington: a penthouse Kensington Olympia: a 400 sq m penthouse redesigned and rebuilt in 12 weeks in an occupied building. View case study
-
Canary Wharf: a penthouse Pan Peninsula: a 290 sq m penthouse redesigned and rebuilt in 10 weeks, on time and on budget. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Solar panels and home batteries in London, your questions
Do I need planning permission for solar panels on a London home?
On most houses, no: roof panels are permitted development if they sit within 20 cm of the roof slope and stay below the ridge. In a conservation area they cannot go on a wall facing the road, and some boroughs remove these rights altogether. Our guide to solar panel planning permission sets out the rules.
What size of home battery storage does a large house need?
It depends on how much power the house uses after dark, not on the size of the roof. We size the battery from twelve months of bills, the panels and any electric car or heat pump, so it fills on a sunny day and empties by morning.
Will the roof need work before the panels go on?
Sometimes. Slipped slates, tired flashings or a valley gutter near the end of its life are cheaper to fix with the scaffold already up. We check the roof at the survey and price any repairs before you sign.
How long does a solar and battery installation take?
The building work is short; the paperwork sets the pace. With scaffold up, panels and a battery normally take a few days on site. Larger systems and most batteries need the network operator's approval before connection, which can take several weeks. A heat pump adds a few days for the unit, pipework and cylinder. Your switch-on date goes into the contract after the survey.
Is it safe to have a home battery inside the house?
Yes, when it is sited properly. The British Standards Institution's PAS 63100:2024 guidance keeps home batteries away from escape routes and habitable rooms, with fire detection nearby. In a London house that usually means a garage, plant room, utility room or an outside wall. We choose the spot at survey and show you before anything is fixed.
Can you fit solar and a heat pump during my renovation?
That is the best moment to do it. With floors up and plaster off, cables, the cylinder and underfloor heating go in without damaging finished rooms. Scaffold already up for roof work can serve the panels as well. We build the system into our luxury home renovation work, on the same programme and contract.
What is in the free solar and battery plan, and which homes do you take on?
Send us a recent electricity bill, your address and a photo of the roof. We return a panel layout, a battery size and the planning route, at no charge. A survey follows before any fixed figure. We focus on prime and period London houses: whole-home systems under one contract, or a system of any size fitted during a Craftex renovation. Running a business premises? See our commercial solar installation service.
Can you fit panels on a listed or conservation-area house?
Yes. A listed house always needs listed building consent, and councils favour rear slopes, flat roofs and parapets that hide the array. We keep panels out of street view, use fixings that can be reversed, and our planning consultancy prepares the application with the design.
Can the battery keep the house running in a power cut?
Yes, if the system is designed for it. A backup-ready inverter and a separate backup circuit keep chosen rooms, the fridge and the boiler controls running when the grid goes down. Standard systems switch off in a power cut for safety, so we agree the backup circuits at the survey.
Is a home battery worth it?
Usually, if you have panels, an electric car, a heat pump or a time-of-use tariff. Panels produce most at midday, when many houses stand empty; a battery keeps that power for the evening. Without panels, it charges on cheap overnight rates and runs the house at peak times. The gain depends on your tariff and habits, so we size the battery from your bills.
Will a heat pump heat a period London house?
Often yes, but the house decides, not the brochure. A room-by-room heat-loss survey shows which radiators need enlarging and where insulation or draught-proofing pays first. Since May 2025, permitted development allows larger units and two per house, subject to a noise standard. The Boiler Upgrade Scheme takes £7,500 off an eligible air source heat pump. Our article on eco-friendly luxury home design covers fabric first.
Do solar panels add value to a London home?
The evidence points to a modest premium. An analysis of nearly 1.5 million Zoopla listings linked solar panels to prices 6.1–7.1% higher; a 2021 industry study of five million sales found 0.9–2%. The surer gain is a better EPC, which buyers and lenders now read closely. Keep the certificates: a buyer's surveyor will ask for them.
How fast do you reply?
A director replies the same working day. Send your postcode, roof photos and last year's usage, and you get the planning route and a date for the free home energy survey.
Read before you start
Guides on battery costs and planning rules: check what your London home can fit before you get quotes.
-
Guide Planning Permission for Solar Panels on Listed and Conservation Area Homes Read the guide
-
Guide Solar Battery Cost in 2026: Alone, With Panels and in a London Home Read the guide
-
Guide Eco-Friendly Design Ideas for Luxury Homes Architecture Read the guide
What our clients say
See all reviews on Google-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Thinking about solar for your home? Book the survey.
Send the address, a photo of the roof and a recent bill. We will come back to you the same working day.



























