Skip to content
Request a callbackCallback
The double-height living room of the Kensington Olympia penthouse: curved velvet sofas, a brass telescope, sheer curtains on floor-to-ceiling windows and a blue Valpaint wall
Case study: penthouse refurbishment

Kensington Olympia Penthouse, London

Penthouse refurbishment in Kensington: 400 sq m designed and rebuilt in 12 weeks

Design and build

12 weeks from first works
to a finished penthouse

The project

  • 400 sq mpenthouse on the top floors
  • £550Krefurbishment value
  • 1,000+ m²of walls and ceilings repainted

A luxury home, in a building full of residents

Our client wanted her penthouse at Kensington Olympia, in Kensington, turned into a calm, luxurious home inside a high-end residential building.

Her brief: a timeless, opulent black and white scheme. It had to work for everyday life and for big dinners, with guests looking out over the London skyline.

Every other flat in the building was lived in. Craftex was the main contractor and ran the whole job, from the first design to handover: a penthouse refurbishment of 400 sq m in 12 weeks.

A round dining table with pale upholstered chairs in a grey and white corner of the penthouse, beside a dark panelled door

Penthouse refurbishment in Kensington: the brief

Penthouse
400 sq m
Location
Kensington Olympia
Design and build
12 weeks
The building
Fully occupied

Refurbishing a flat in a lived-in block?

Send us your floor plans and a few photos. We plan the work around your neighbours and the managing agent, then send a fixed-price proposal.

Penthouse interior design: colour where it counts

A wall finished in blue and turquoise Valpaint behind a slim console table and a framed abstract print

Blue Italian Valpaint in the living rooms

We gave the living rooms some fun with walls in a deep blue Italian Valpaint.

This finish only looks right if it is put on by hand, the right way. So our decorators trained in it before they started. The finish has real depth and movement.

An open-plan white kitchen with a grey island, two tan leather bar stools and a pale oak floor

White walls let the colour breathe

In all, we repainted more than 1,000 m² of walls and ceilings.

The ceilings are high and the windows go from floor to ceiling, so the blue never feels heavy. Everything else, the kitchen included, stayed white. The home feels bright, light and welcoming.

A television set flush into white marble panelling next to a blue Valpaint wall, above a built-in fireplace

Smart lighting and TVs set into the wall

We fitted new smart home lighting throughout, for easy everyday use.

We also cut neat recesses into the stone and timber panels. The new TVs sit flat inside them, flush with the wall.

Bespoke wardrobes in London: fitted, then finished

In the bedroom we fitted high-end bespoke wardrobes that make elegant, practical use of the space, and supplied and installed glass shoe shelving from floor to ceiling.

A bespoke oak wardrobe being installed: open shelves, black drawers and chrome shoe rails, with fittings still on the floor
During the worksThe wardrobe being fitted
The finished bespoke wardrobe: oak shelves, black drawer fronts and angled chrome shoe rails
At handoverThe same wardrobe, finished

Dressing room design, built around how she lives

A dressing room lined with dark wood cabinets and lit shelves, with a crystal light in a glowing ceiling cove

A dark wood dressing room next to the bedroom

We designed and built a dressing room beside the master bedroom, lined with custom dark wood cabinets and soft hidden lights.

We also made a new doorway, so she walks straight in from her bedroom. In the bedroom itself, one wall is clad in bevelled-edge mirrors to make the room feel bigger.

A walk-through wardrobe with oak shelving on one side and glass-fronted shelving on the other

Glass shoe shelves from floor to ceiling

The walk-through wardrobe has warm oak shelving on one side and tall glass-fronted shelves on the other.

For your home: plan wardrobes and lighting together, early. Cables and LED strips are easy to hide before the joinery goes in, and hard to add after.

A long dining table lined with upholstered chairs under a glass-disc chandelier, framed by blue Valpaint walls

Dinner for ten, open to the living space

The penthouse has a large dining area that seats up to ten people.

The layout is open-plan, so guests at the table stay part of the room. Nobody is shut away in a separate dining room while the party goes on next door.

Want a dressing room or wardrobes like these?

Tell us about the room and how you use it. We design the joinery, light it and build it, as part of one fixed-price job.

Flat renovation in London, in a block full of neighbours

The penthouse entrance hall: a pale marble floor with a dark border, a large painting and a pink feather floor lamp, looking through to the living room

Deliveries, noise and waste under control

The building stayed fully lived in while we worked. Our biggest job was keeping the neighbours happy.

We booked every delivery, kept noisy work to agreed hours and took the waste away cleanly. The building managers were happy with how it was run, start to finish.

A floating staircase with pale treads and a polished handrail beside a dark marble wall and a blue Valpaint wall

On time, zero snags, and she never had to visit

We handed the penthouse over on time, with no snags or defects to fix.

Our client did not come to site once while we worked. We kept her updated and dealt with the building for her. At handover she had no complaints, and the result went beyond what she had hoped for.

The penthouse at handover

Already have a design or a quote?

Send it to us. We check it against what the work will really cost, and we will aim to beat the price.

Our team

  • in

Penthouse refurbishment case study: the scope we delivered

Design and build in one contract, as main contractor, while every other flat stayed lived in.

PackageWhat was done
DesignBlack and white scheme with the client; dressing room designed
Walls and ceilingsMore than 1,000 m² repainted; blue Valpaint in the living rooms
JoineryDark wood dressing room; bespoke wardrobes; glass shoe shelving
OpeningsNew door from the master bedroom into the dressing room
Lighting and screensSmart home lighting; recesses so the TVs sit flush
BedroomWall clad in bevelled-edge mirrors
Building managementDeliveries, noise and waste planned with the building managers

Free cost calculator

Get a quote for your project

This penthouse is the proof. Now it is your turn. This project: about £1,375 per sq m, designed and built in 12 weeks. Yours depends on the size, the finishes and the building. Enter your floor area for a first range, at our 2026 London rates, ex VAT and fees.

Your estimateEnter your spaceex VAT and fees Get a quote for your project

Indicative, ex VAT and design fees, construction only on gross internal area. Basements are priced per house after a survey. Your fixed figure follows the survey and the drawings.

Free value: take this with you

Nine checks before you refurbish a flat in an occupied building

  1. Before you commit

    • Read your lease and the building rules. Many blocks set working hours, lift bookings and notice periods for contractors.
    • Ask the managing agent what they need from you. Insurance certificates, a method statement and a named contact are common requests.
    • Check which changes need the freeholder's consent. New openings, structural work and changes to services often do.
  2. While the design develops

    • Have the design costed as it is drawn. A scheme priced only at the end is the one that gets cut.
    • Choose finishes your installers can really apply. Specialist paints need trained hands, or the effect is lost.
    • Plan lighting and screens with the joinery. Recesses and cables are far easier before the panelling goes up.
  3. Before work starts

    • Book deliveries and lift slots in advance, and keep large items to agreed times.
    • Agree how noise and waste will be handled. Neighbours accept a project they were told about.
    • Give design and build to one contractor. Then one team answers for the look, the cost and the date.

Certified, insured, compliant

  • ISO 9001 Quality Management
  • ISO 14001 Environmental Management
  • ISO 45001 Health & Safety Management
  • SafeContractor Approved
  • SSIP Safety Schemes in Procurement
  • CDM 2015 Principal Contractor
  • CIS Gross
  • Public Liability £10,000,000
  • Employers' Liability £10,000,000
  • Professional Indemnity available on request
  • Defects liability standard 12 months, extendable
  • Warranty up to 10 years available
  • Collateral warranties from our consultants & design team
  • ISO 9001 certified
  • ISO 14001 certified
  • ISO 45001 certified
  • SafeContractor approved
  • CHAS accredited
  • Constructionline Gold
  • TrustMark
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects

What our clients say

See all reviews on Google
  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Penthouse and luxury flat refurbishment: your questions

How long does a penthouse refurbishment take?

This 400 sq m penthouse took 12 weeks, design and build. A smaller flat is often quicker; moving walls or services takes longer. We fix the date in the contract before work starts.

Can you refurbish a flat while the rest of the building is lived in?

Yes. Every other home in this block was occupied the whole time. We agree delivery times, quiet hours and waste removal with the managing agent first, so residents are disturbed as little as possible.

Does a dressing room add value to a home?

In prime London homes, buyers expect good storage, and a well-built dressing room is a strong selling point. It also makes daily life easier. Build it properly, with lighting and joinery designed together.

What is Valpaint, and is it hard to apply?

Valpaint is an Italian decorative paint that gives walls depth and movement. It must be applied by hand with the right technique, which is why our decorators trained in it before starting.

Do you refurbish other penthouses in London?

Yes. For a second example, see our penthouse at Pan Peninsula, Canary Wharf. We work across London and the UK.

How much does it cost to refurbish a luxury flat in London?

This penthouse was a £550K job, about £1,375 per sq m. Your price depends on size, finishes and how much changes. We price your home from your plans and send a fixed-price proposal.

Do you design the interior as well as build it?

Yes. Here our designers worked out the colour scheme with the client and designed the dressing room, then our own team built it. Our high-end interior design team works this way on every home.

What colour should a dressing room be?

Dark wood and soft, warm light feel rich and calm, as in this penthouse. Pale finishes make a small room feel bigger. Mirrors help too: here a mirrored bedroom wall adds a sense of space.

Do I need to be on site while you work?

No. This client never came to site and was delighted at handover. We send updates, handle the building managers and only ask you to decide on things that matter.

Who manages the work and the trades?

We do, as main contractor: one team and one point of contact for design, joinery, decorating, lighting and the building rules, from the first drawing to the keys.

Planning a penthouse or luxury flat refurbishment?

Craftex designs it, prices it and builds it, as one accountable team.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us