Pan Peninsula Penthouse
Discover our high-end residential design and reconstruction of the penthouse at Pan Peninsula Tower, completed by Craftex’s team of professionals
Situated in the vibrant and trendy area of Canary Wharf, London, the Pan Peninsula is a residential skyscraper tower known for its wealth of luxurious high-end apartments. Within this development, our team was hired for the interior design and refurbishment of the luxury penthouse suite.
We proposed a sophisticated, modern, and opulent interior to match its panoramic views of the stunning London waterfront, delivered on time, on budget, and in line with our client’s vision.
- Services
- Design and reconstruction
- Timeframe
- 10 weeks
- Total size
- 290 sq m
- location
- Pan Peninsula Square, Canary Wharf, London
High-end residential transformation
The transformation of the penthouse suite at Pan Peninsula consisted of both design and space reconstruction work. Our team started with a soft strip, removing the furniture, selected joinery, wallpaper, and sound suppression panels.
Selected walls were also removed to create an airy and fluid open-plan layout designed to maximise the space.
To suit this new arrangement, we reconfigured all services and performed validation testing, also adding innovative smart home features for convenience and a high-end feel.
All remaining aspects of the penthouse were fully refurbished, including the retained joinery, existing flooring and doors, and the addition of new ironmongery.
The result is a sleek and contemporary space that combines timeless white surfaces with textured stone and timber for subtle depth.
The outside space was also restored and balcony decking renewed, giving residents a place to enjoy the views of the skyline and soak up London’s thriving atmosphere.
Lighting also played a key role in the design. With impressive floor-to-ceiling windows leading to stunning views over Canary Wharf, the penthouse is flooded with natural light.
The addition of downlights throughout complement this natural lighting and have been layered with central pendants for a sophisticated atmospheric effect.
The central lighting fixtures and other decorative elements were also chosen for visual impact. The use of metallic accents, mirrors, and crystal add subtle elegant touches without detracting from the views outside.
Challenges and solutions
There were a number of logistical challenges for this project, both at the strip out and the main stages of construction.
With the residential tower already home to residents, our team’s effective noise and waste management solutions came largely into play, minimising disruption throughout the Commercial-to-Residential project.
Consistent coordination of works and deliveries with the Pan Peninsula Management Team and other tower residents also played a major part in this project’s successful delivery.
Despite these obstacles, the penthouse renovations were completed on time and within the allocated budget. Following successful completion, Craftex was invited to participate in an invitation-only tender by Pan Peninsula management, illustrative of our high-quality results.
Our gallery
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SAAS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects across the globe, with an unwavering commitment to quality that ensures each clients get the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Like our project
Leave an application and we will make a project for you