Commercial EPC: Cost, Ratings and the Upgrade Works

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 8 min read

Stone-fronted office building in the City of London beside a glass tower reflecting the sky

The short answer

A commercial EPC rates how energy efficient a business building is, from A to G, and you need one to let or sell it. Published 2026 guides put the certificate at about £100 to £300 for a small unit; the bigger bill is the works that lift a low rating.

  1. The certificate price follows floor area, building type and complexity. GOV.UK says only that the cost depends on the building.
  2. Knight Frank's 2026 budget figures run from £10 to £15 per sq ft for LED lighting with smart controls to £30 to £40 per sq ft for new cooling plant.
  3. EPC E is the legal minimum today. EPC B from 2031 for buildings over 1,000 m² is proposed, not law.
  4. Do the works at a void or lease event, so the building is opened up once.

A commercial EPC is the Energy Performance Certificate for a business building. It rates energy efficiency from A to G, and you need one to let or sell. A landlord cannot let below E without a registered exemption.

The certificate is the small bill: published 2026 guides put a small unit at about £100 to £300. The works that lift a low rating, often part of a commercial refurbishment, are priced per sq ft. This guide covers the rating, the certificate and the works, and when to do them.

It comes from the team that carries out EPC upgrade works for landlords across London.

Rating below what your next letting needs? Get a free MEES check: send us the EPC and its recommendation report and we price the works.

Commercial EPC ratings and when you need one

GOV.UK says a commercial EPC rates how energy efficient the building is, using grades from A to G, with A the most efficient. Each certificate comes with a recommendation report: the list of measures an assessor says would improve the rating.

You must have one when you rent out or sell the premises and when a new building is finished. You also need one when changes to the parts used for separate occupation involve new or extended fixed heating, air conditioning or mechanical ventilation.

When a commercial building needs an EPC, and when it must be displayed
SituationWhat GOV.UK says
Letting or sellingAn EPC is required, valid for 10 years
New building finishedAn EPC is required
Over 500 m², often visited by the public, EPC already producedIt must be displayed in the building
No EPC for a prospective buyer or tenantFine of £500 to £5,000, based on rateable value

For letting, the rating matters more than the paper. Below E, the MEES regulations stop the letting unless an exemption is registered. That is why the recommendation report is worth more than the certificate itself.

Commercial EPC requirements and exemptions

The requirement is simple: no EPC, no sale or letting. You must be able to show the certificate to any prospective buyer or tenant, and it is valid for 10 years.

Some buildings need no EPC at all. GOV.UK lists six kinds, as long as you can demonstrate the exemption:

  1. Listed or protected buildings where meeting the standards would unacceptably alter them.
  2. Temporary buildings used for two years or less.
  3. Places of worship and buildings used for religious activities.
  4. Low-energy industrial sites, workshops and non-residential agricultural buildings.
  5. Detached buildings with under 50 m² of floor space.
  6. Buildings due to be demolished by the seller or landlord, with every planning and conservation consent in place.

A vacant building can also be exempt. It must be sold or let with vacant possession and be suitable for demolition, and the buyer or tenant must have applied to demolish it.

An EPC exemption is not a MEES exemption. A building that needs an EPC and rates below E needs its own registered MEES exemption to be let. Most commercial landlords meet the requirement by doing the works instead.

What a commercial EPC costs and what sets the price

An accredited non-domestic energy assessor produces the certificate. The type of assessor depends on how complex the building is.

GOV.UK gives no price. It says the cost depends on the building being assessed. Two published 2026 guides agree on the shape. One says a commercial EPC usually starts from £150. The other puts smaller buildings at about £100 to £300 and larger or complex ones at up to £1,500.

What moves the price of a commercial EPC
What the assessor needsWhy it moves the fee
Floor area and number of unitsMore area and more units mean more to measure and model
Building type and useAn office, a shop and a warehouse are assessed differently
Layout and number of zonesMulti-let and mixed-use buildings take longer
Heating, cooling and lighting detailMissing information has to be surveyed on site

The £500 to £5,000 fine is the wrong reason to buy a certificate. The right reason is the recommendation report that comes with it. It is the list your works are priced from.

What rating you need in 2026, and by 2031

The Energy Efficiency (Private Rented Property) Regulations 2015 stop a landlord letting a non-domestic building rated below E. That has applied to new lettings since 1 April 2018 and to every existing lease since 1 April 2023.

On 18 June 2026 the government proposed EPC B from 2031 for private rented buildings over 1,000 square metres, where cost effective. The earlier EPC C step for 2027 will not be taken forward.

Where non-domestic MEES stands on 6 November 2026
RequirementStatus
EPC E for new lettings, renewals and extensionsIn force since 1 April 2018
EPC E for every existing leaseIn force since 1 April 2023
EPC C by 2027Dropped
EPC B from 2031, buildings over 1,000 m²Proposed, needs secondary legislation
Buildings under 1,000 m²Proposed to stay at E

The full government response is still to come, so treat 2031 as the planning date and the detail as open. Our guide to MEES regulations for commercial property covers the exemptions and penalties.

Is your certificate F or G? Do you want to be clear of B before 2031? Our MEES upgrade works for commercial landlords start from the EPC you already hold.

The works that lift a commercial EPC rating

Every building scores differently. Knight Frank's guide says there is no one solution that fits all, and advises an EPC assessment on the individual building before anyone chooses measures. So use this as the list to put to your assessor, and ask for each package to be modelled.

Measures that move a commercial EPC, and Knight Frank's impact rating
MeasureWhat it changesEPC impact (Knight Frank)
Replace an air handling unit with a more efficient oneVentilation and cooling energyHigh
Chillers and fan coils to condensers and VRFCooling and heating plantMedium
Gas boilers to air source heat pumpsHeating efficiencyMedium
LED lighting with smart controlsLighting energyMedium
Roof renewal with more insulationHeat loss through the roofMedium
Triple glazingHeat loss through windowsMedium
Repairs to window seals and gasketsAir leakageLow

Plant and lighting are the services we install. For the heating, cooling and controls side, our M&E upgrade team designs and fits the packages. Fabric works such as roofs and glazing sit in the same programme.

Order matters for cost. Lighting and controls are the cheapest per sq ft. Plant is the biggest step and needs the longest lead time and the most design. Fabric usually waits for a refurbishment or a re-roof.

What EPC upgrade works cost per sq ft

Knight Frank's Landlord Refurbishment Cost Guide for Spring 2026 publishes indicative budget costs for EPC upgrades. Most are per sq ft of gross internal floor area. The fabric lines are per sq ft of facade, roof or glazing area instead.

EPC upgrade budget costs per sq ft (Knight Frank, Spring 2026)
MeasureCost per sq ftApplied to
Chillers and fan coils to condensers and VRF£30 to £40Gross internal floor area
Replace air handling unit£15Gross internal floor area
Gas boilers to air source heat pumps£10 to £20Gross internal floor area
LED lighting throughout with smart controls£10 to £15Gross internal floor area
Point of use water heaters instead of boilers to WCs£2.50 to £5Gross internal floor area
Air permeability test with remedial works£1 to £10Gross internal floor area
Renew flat roof finish with more insulation£3 to £7Roof area
Triple glazing, including access£10 to £25Glazing area
Repairs to window seals and gaskets£1 to £5Facade area
£10 to £15per sq ft for LED lighting with smart controls
£10 to £20per sq ft to swap gas boilers for heat pumps
£30 to £40per sq ft for chillers and fan coils to VRF

Here is the arithmetic on a 10,000 sq ft floor plate, about 930 m². It multiplies the published ranges and is not a quote for your building.

Knight Frank ranges on 10,000 sq ft of floor area
MeasureBudget range
LED lighting with smart controls£100,000 to £150,000
Gas boilers to air source heat pumps£100,000 to £200,000
Chillers and fan coils to condensers and VRF£300,000 to £400,000

The same guide's main benchmark, for a Central London office, prices plant per sq ft too. Air conditioning and ventilation plant is £20, air source heat pumps £10 and a building management system £7. It excludes VAT and professional fees.

The guide also says sustainability and EPC upgrades are included in its £300 per sq ft plus refurbishment schemes.

These are benchmarks. The rest of Knight Frank's benchmark is set out in the Cat A fit out cost per sq ft guide. A price for your building comes from a survey of it.

I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

Taron Papoyan, Google reviewSee all reviews on Google

When to do the works so you pay once

Most commercial leases give a landlord limited rights to carry out works while the tenant is in occupation. The natural windows are breaks, expiries and voids. Each is a moment when the building is opened up anyway, for dilapidations or a Cat A refit.

That is the case for lining them up. Put lighting, controls and plant into the same programme as the strip-out. The building is disrupted once. The new lease then starts on a rating that clears E, or B if you work to the 2031 proposal.

Occupied buildings are not a reason to wait. At Portsoken House in Aldgate we delivered 1,550 sq m of offices on two floors, with a full mechanical and electrical package, in seven months. The other floors stayed let, so the noisy work ran at night and at weekends.

Who pays depends on the lease. The MEES duty sits with the landlord. Recovery through the service charge or a rent review is a lease question for your solicitor.

If the figures look uneconomic, the market may already be pricing it in. See our note on the brown discount on inefficient offices.

Getting from certificate to works in five steps

You can do the first two this month. The rest need the building opened up, so the lease event sets the date.

  1. Find the certificate. Note the rating, the expiry date and the recommendation report.
  2. Check the age. A certificate that is years old may not show the building as it is now.
  3. Ask for packages to be modelled. Lighting, plant, controls and fabric, each with the rating it reaches.
  4. Price the packages. Get a contractor's figure for your floor and set it beside the benchmark.
  5. Fit the works to the lease event. Put the ones that pass into the void or refit programme.

Want the works priced before you brief an assessor? Get a free MEES check. We price from the certificate you already hold. The certificate itself comes from an accredited assessor.

  • The EPC certificate and its recommendation report
  • Floor plans and the area of each floor
  • The lease end date, any break date and any void
  • Any plant details you hold: age, make and type of the heating and cooling
  • Whether the building is over or under 1,000 m²
  • Any quotes already received for the works

Frequently asked questions

How much does a commercial EPC cost?

There is no fixed price. GOV.UK says the cost depends on the building being assessed. Two published 2026 guides put a small unit at about £100 to £300, or from £150, and say larger or complex buildings cost more, up to £1,500 in one of them. Get two or three quotes from accredited assessors.

How long does a commercial EPC last?

Ten years. GOV.UK says all EPCs are valid for 10 years. You need a valid one when you sell or let the building. A landlord who has just improved the building may want a new certificate sooner, so that it shows the new rating.

What is the minimum EPC rating for a commercial property?

EPC E or better, in England and Wales. A landlord cannot let, or continue to let, a non-domestic building rated F or G without a registered exemption. EPC B from 2031 for buildings over 1,000 m² was proposed on 18 June 2026. It is not yet law.

How can I improve my commercial EPC rating?

Start from the recommendation report on your certificate and ask the assessor to model each package. The usual order is lighting and controls, then heating and cooling plant, then fabric such as roofs and glazing. Knight Frank rates replacing an air handling unit as a high impact measure.

Who pays for EPC improvement works, landlord or tenant?

The legal duty under the MEES regulations sits with the landlord. Whether any cost can be recovered through the service charge or a rent review depends on the lease, so read it with your solicitor before you commit to a budget.

Do I need a new EPC after refurbishment works?

GOV.UK requires an EPC when you sell or let, when a new building is finished, and when changes to the parts used for separate occupation involve new or extended fixed heating, air conditioning or mechanical ventilation. Outside those cases the old certificate stays valid for its ten years.

Which commercial buildings are exempt from an EPC?

GOV.UK lists listed or protected buildings the standards would unacceptably alter, temporary buildings used for two years or less, places of worship, low-energy industrial and agricultural buildings, detached buildings under 50 m², and buildings due to be demolished with every consent in place.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

EPC below E, or a lease event coming?

Send us the certificate and its recommendation report. We come back the same working day with the works priced and a programme counted back from your date.

WhatsApp us