Lab Fit Out, Cleanrooms and Cold Stores
Labs ready to validate on your date, across London and the UK. Start with a free feasibility and cost plan.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 4 weeksto rebuild the power, heating, lighting, drainage and fume extraction of a warehouse unit in Hackney
- 750 sq mof offices refurbished in three weeks, with five weeks left on the old lease
- 0snags at handover, with every test record and certificate in the file
- £10Minsurance cover, ISO and CHAS: what your landlord and insurer ask for
One team for lab design, services and commissioning
Craftex delivers lab fit out and laboratory refurbishment in London and the South East: wet and dry labs, fume cupboards, cleanrooms and cold stores under one contract. One team designs the services, builds the rooms and commissions them, so you can validate and move in on the date agreed.
A lab is judged on the day the first experiment runs, not the day the builders leave, and every week between costs runway or rent. So we start with your building: floor loads, ceiling void, risers and roof space for extract, checked in a free feasibility and cost plan before you sign the lease. Projects delivered in London and Oxfordshire.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Lab fit out, cleanroom construction and cold stores under one contract
Six kinds of controlled space, priced together and commissioned by one team, so the air, the power and the drains are designed once. Fitting out offices, a clinic or a shop floor instead? See our commercial fit out service. See how we work as a fit-out and construction partner for businesses.
Wet and dry laboratories
CL2 wet labs, dry labs and write-up areas, with chemical-resistant benching, sinks and wipe-clean finishes throughout.
Fume cupboards and lab gases
Ducted fume cupboards with extract to roof, and piped lab gases with alarms and isolation at every bench.
Cleanrooms to your ISO class
Modular or built-in cleanrooms with HEPA air, pressure cascades, airlocks and gowning rooms, tested to the class in your brief.
Cold stores and freezer rooms
Insulated panel rooms from chilled to deep frozen, with frost-protected floors, alarmed doors and monitored refrigeration.
Air handling, power and controls
Air handling sized to the air changes your risk assessment sets, with resilient power, drainage and BMS monitoring.
Office-to-lab conversions
Slab loads, vibration, ceiling voids and riser space checked first, then strengthened or rerouted before the lab goes in.
Laboratory design: from room data to validation
Laboratory design starts with a room data sheet for every space: containment level, air changes, gases, drainage, equipment loads and the services zone each room needs. We design to the standard your team will validate against, so the lab that passes its tests is the lab that was drawn.
Read more
Cleanrooms are classed under ISO 14644-1 by airborne particles per cubic metre, and a cleaner class means more filtered air and a bigger plant room. Containment level 2 labs follow HSE and ACDP guidance on surfaces, hand washing, access and safety cabinets, and your biological safety adviser signs off the final list. CL3 suites add sealed rooms, negative pressure and filtered extract, and are designed with your adviser from the first sketch.
Laboratory refurbishment of a live lab is phased around the experiments next door: shutdowns agreed with your lab manager, clean areas sealed, services kept running where they must. Whether you are comparing laboratory fit out companies, a lab design team or contractors for a laboratory refurbishment, ask who owns the commissioning records. With us, the team that drew the services also tests them. Leaving a lab at lease end? Laboratory decommissioning clears and decontaminates the space before handback.
How it works
How a lab fit out runs with us
01
Free feasibility
We survey the building, check floors, voids, risers and plant space, then return a layout and a cost plan. No charge.
02
Brief and design
Your scientists' needs become a room schedule: containment level, air changes, gases, benching and equipment loads, signed off before drawing starts.
03
Approvals and orders
Landlord licence, building control and planning for roof plant are handled. Fume cupboards, air handlers and panels are ordered early to hold the date.
04
Build and commission
Our trades build, then every system is tested and balanced: airflow, room pressures, fume cupboard face velocity, alarms and temperatures.
05
Ready to validate
Each system comes back tested, with installation and operational qualification records ready for your validation team.
The Craftex Guide to Fit Out
Not ready to book a survey? Read the guide first: budget, programme and approvals, the questions to settle before your lab brief goes to anyone. Free, and a short read.
Our promises
Six promises, written into your contract
The terms we build every lab, cleanroom and cold store to, from a single suite to a whole building.
-
One team, survey to sign-off
Building work, air handling, gases, cleanroom and refrigeration sit in one contract, with one director answering for all of it.
Hackney warehouse: every engineering system designed and rebuilt by one team
-
The agreed figure stands
What you sign is what you pay. Any change your scientists ask for is priced and agreed in writing first.
100% of our projects on budget
-
Your work keeps running
Live labs, offices and plant stay in service. Noisy, dusty and shutdown work is booked into agreed hours and weekends.
Banbury Warehouse: 2,500 sq m refitted with the warehouse kept running
-
Ready on your date
Around 60% of the labour is our own, so no room waits for another firm's diary.
Kensington Olympia: a 400 sq m penthouse designed and refurbished in 12 weeks
-
£10M cover on every job
Public and employers' liability of £10M each, professional indemnity on request.
ISO 9001, 14001 and 45001, CHAS and SafeContractor.
-
Zero snags, a complete test file
Every room finished to the signed-off schedule, with commissioning results, certificates and the health and safety file.
Beaumont House, West Kensington: 750 sq m handed over in three weeks with zero snags.
Already have a quote? Send it to us. We'll beat it.
Send the quote or floor plans you hold for your lab, cleanroom or cold store. A director checks them against your building and replies the same working day with our figure for the same scope and a free feasibility.
Compare your quotes
Where do lab fit outs fail validation?
Hold any proposal up against this list. Every lab carries the same risks; who carries them is what differs.
| Area | The usual risk | With Craftex |
|---|---|---|
| Air changes below spec | The air handler was sized for offices, so rooms fail their airflow and pressure tests | Air changes set from your room data sheets and proved at commissioning |
| Fume cupboard face velocity | Extract fans and ducts undersized, so cupboards fail their face velocity test | Extract designed per cupboard and every cupboard tested before handover |
| Drainage not chemical-resistant | Standard pipework under the sinks, replaced after the first spill | Chemical-resistant drainage specified wherever the room data asks for it |
| No commissioning records | Keys handed over without test records, so validation stalls for weeks | Installation and operational qualification records in the handover file |
| Power without resilience | Freezers and incubators on ordinary circuits with no alarm or backup | Critical circuits, alarms and backup agreed in the brief and tested |
| Four firms, no owner | A builder, an M&E firm, a cleanroom installer and a refrigeration firm, each blaming the next | One contract covers every system, so a room that fails its test is ours to put right |
What sets the budget of a laboratory?
Six things move the figure more than anything else. We check each one in the free feasibility and settle it in writing before you sign.
| What | What moves the budget | What we fix before you sign |
|---|---|---|
| Wet versus dry lab ratio | How much of the floor needs water, drainage and extract | The room schedule and the wet-lab zones |
| Fume cupboards and extract | Number of cupboards, duct runs and roof plant | An extract design and the roof route |
| Cleanroom class | Air changes, filtration, airlocks and gowning | The class per room and the air design |
| Cold rooms | Temperature, size and refrigeration resilience | Panel, floor and plant specification |
| Power resilience and data | Critical circuits, backup, alarms and monitoring | A resilience brief signed by your team |
| Building suitability | Floor-to-floor height, slab loads and riser space | A structural and services survey |
Our construction work runs from £100,000 to £10M and above. Scientific equipment, structural strengthening and VAT sit outside the build figure, and we usually advise a contingency of 5–10%.
Free cost calculator
What will your lab fit out cost?
Enter the floor area and pick the type of space for a range from 2026 market rates. Your own figure follows the free feasibility of your building, its slab, its risers and its roof.
Engineering and live-building projects
No lab case study is published yet; these show the services work a lab depends on, built by the team that would build yours.
-
Hackney, London: fume extraction in 4 weeks Hackney warehouse: power, heating, lighting, pumped drainage and fume extraction for a warehouse unit. View case study
-
Bethnal Green, London: design, MEP and building control Drake's Warehouse: a 500 sq m railway arch designed, serviced and signed off by one team in 8 weeks on site. View case study
-
Aldgate, London: services at scale, building occupied Portsoken House: 1,550 sq m with a full mechanical and electrical package, built with tenants at work on the other floors. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Lab fit out: your questions
Can an office be converted to a lab? Office to lab conversion checks
Often, yes, but four things need checking first. Floor loads must carry lab equipment, and the ceiling void must take the ductwork. Then come riser and roof space for extract, and vibration, where concrete frames usually perform better than steel.
Do you design the lab as well as build it?
Yes. Our team turns your scientists' needs into room data sheets and a layout, then designs the air, extract, gases, drainage and power, and builds and commissions it. Or we build to your lab planner's design.
What do the cleanroom ISO classes mean for cleanroom construction?
ISO 14644-1 grades cleanrooms by the number of airborne particles per cubic metre. At 0.5 µm and above, ISO 5 allows 3,520, ISO 7 allows 352,000 and ISO 8 allows 3,520,000. At rest, GMP Grades A and B match ISO 5, Grade C ISO 7 and Grade D ISO 8. The class you need sets the air change rate, and that drives most of the cost.
Do you install fume cupboards and lab gases?
Yes. Ducted fume cupboards with their extract fans and roof discharge, plus gas pipework, alarm panels and isolation valves, each tested before handover.
How long does a lab fit out take?
We fix the dates in the contract rather than quote an average, because size, containment level and equipment lead times change everything. Fume cupboards, air handling units and cleanroom panels often set the start on site. For scale, our Hackney warehouse, with its power, heating, drainage and fume extraction rebuilt, took four weeks.
What documents do we get for validation?
Installation and operational qualification protocols and results from the installers of the air handling, cleanroom, cold rooms and fume cupboards. Add the commissioning and balancing records, cleanroom classification tests and fume cupboard face velocity tests. As-built drawings, O&M manuals and the health and safety file complete the set. Performance qualification stays with your team.
What size of project do you take on, and where?
Construction projects from £100,000 to £10M and above, from a single lab suite to a whole building, for tenants, landlords and operators. We work across London, the South East and the UK, with projects in Oxfordshire. A director leads your project from survey to handover.
How is a lab fit out different from an office fit out?
A lab is designed around its services, not its finishes. Air changes, extract, lab gases, drainage and floor loading lead the design. That usually needs a deeper ceiling void and more riser and roof space than an office.
Can you refurbish a live laboratory?
Yes. Laboratory refurbishment is phased around your experiments and your neighbours, with shutdowns agreed in advance and live or clean areas sealed off. At Banbury Warehouse the 2,500 sq m building stayed in operation through the whole eight-week programme.
What does a CL2 laboratory need?
Containment level 2 is for work with hazard group 2 biological agents, under HSE and ACDP guidance. Typical features are impervious, easy-clean surfaces, a wash-hand basin near the exit, controlled access and safety cabinets where work creates aerosols. HSE must be notified before premises are first used for these agents. Your biological safety adviser sets the final list, and we build to it.
What temperatures do cold stores and freezer rooms run at, and how is cold store construction priced?
Chill rooms usually run at about 0–5 °C, and medicines are commonly stored at 2–8 °C. Freezer rooms typically hold −18 to −21 °C, and deep-frozen stores −25 °C or colder. Insulated panels get thicker as the temperature falls. Freezer floors also need insulation and frost protection, and we price each room on its temperature, size and plant.
What drives the cost of a lab fit out?
The wet to dry lab ratio, the fume cupboards and extract, the cleanroom class, cold rooms, power resilience and how well the building suits labs. Our calculator gives a range from 2026 market rates, and the free feasibility fixes your figure.
What does the free feasibility and cost plan include?
We survey your building first. You then get a check of floor loads, ceiling voids, risers and roof space, an outline layout and a cost plan. If the building will not work as a lab, we tell you before you sign. Send us your floor plans and room list to start.
How fast do you reply?
The same working day, every enquiry. A director takes the call, not a sales desk.
Read before you fit out a lab
What to check before you commit to a building for labs.
What our clients say
See all reviews on Google-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Tell us about your lab
Send your floor plans, the rooms you need and the date your team must start work. We will come back to you the same working day to book the survey.



























