Skip to content
Request a callbackCallback

For property owners and investors in London

Article 4 Directions Explained: HMOs, Class MA and Conservation Areas in London

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 12 min read

Row of Victorian yellow-brick terraced houses with red brick arches, bay windows and clay chimney pots under a pale sky

The short answer

An Article 4 direction is a council order that removes named permitted development rights in a defined area, so a house to a small HMO or an office to flats under Class MA then needs planning permission. It does not ban the change; it puts it in front of the council.

  1. It can remove HMO rights, Class MA, householder rights and demolition rights, one class at a time.
  2. On 2 November 2026 we verified Class MA directions in 15 London boroughs and HMO directions in 22: the borough table is below.
  3. If your building is covered, the route is full planning permission instead of prior approval, judged against the local plan.

An Article 4 direction is a council order that removes named permitted development rights in a defined area. A change that normally needs no application then needs planning permission there. Examples are a house to a small HMO and an office to flats under Class MA.

A direction does not ban the change. It puts it in front of the council.

This guide covers what a direction removes and how it hits HMOs and Class MA conversions in London. It lists the London boroughs with each direction, checked on 2 November 2026. It also shows how to check an address and what to do if your building is covered.

We price and build conversions, so we write for owners deciding whether to buy, apply or walk away. For a whole building, the planning for a change of use route is the one we confirm first. Holding or eyeing a building in a borough with a direction? Get a free site appraisal.

What an Article 4 direction is and what it removes

Permitted development rights come from the General Permitted Development Order 2015. Article 4 of that Order lets the Secretary of State or a council withdraw named rights from an area. The works or change then need a planning application.

National guidance sets the limits. A direction cannot restrict a change within the same use class. It cannot stop development already begun or completed. It does not mean the work is refused, and a planning fee may be payable.

Rights an Article 4 direction can remove, and what then needs an application
Right removedWhere it sitsWhat then needs an application
Small HMO to home, or backPart 3, Class LThe change between a home (C3) and a small HMO (C4)
Office, shop or other Class E use to homesPart 3, Class MAThe change to homes, instead of prior approval
Extensions, roof work, porchesPart 1Work the householder right would have allowed
Gates, fences, walls, exterior paintingPart 2Those works
DemolitionPart 11, Class BDemolition of the building

A direction names the classes and the area. It can be narrower than the right itself. The City of London direction, for example, covers offices only.

Councils must justify a direction. The National Planning Policy Framework (August 2026 edition) is clear on the test. A direction should protect local amenity or wellbeing, rest on robust evidence and cover the smallest area needed.

Procedure matters to a buyer. A non-immediate direction is advertised first, with at least 21 days for representations. It takes effect at least 28 days, and up to 2 years, after that period begins, and only once confirmed. An immediate direction takes effect on notice but lapses after six months unless confirmed.

One protection helps investors. A prior approval already granted survives a later direction, if the development is completed within three years.

HMO Article 4 directions in London

Planning counts the people in a house. A family home sits in Class C3. A small HMO, Class C4, is a dwellinghouse used by not more than six residents as a house in multiple occupation.

How planning treats a house by the number of residents
UseResidentsChange from a family home
Family home (C3)One householdNot applicable
Small HMO (C4)Up to sixPermitted by Class L, unless a direction removes it
Larger HMOMore than sixOutside C4, so planning permission is needed

Class L lets a building change between a small HMO and a home. It does not allow a split into two or more separate homes or HMOs.

Several London boroughs have used this power. Newham made its direction in 2012 and confirmed it in June 2013. It has applied since 31 July 2013 to the whole borough, except the area under the London Legacy Development Corporation.

Tower Hamlets lists a direction for changes from C3 to C4 on the national dataset. Hammersmith and Fulham agreed in February 2026 to make one, which still has to be confirmed.

For the full borough list with dates, read our guide to HMO Article 4 directions in London.

For a buyer, a family house bought to let as a small HMO needs planning permission first where a direction applies. A direction does not undo use already begun lawfully, so prove the history before you rely on it.

Licensing is a separate regime. GOV.UK says an HMO is rented by at least 3 people from more than one household who share facilities. A mandatory licence is needed for 5 or more people and lasts up to 5 years. Some councils also require licences for smaller HMOs. A licence is not planning permission.

For a whole building or a larger scheme, we confirm the route first. That is change of use planning priced by the team that builds it.

Article 4 and Class MA: offices and shops in central London

Class MA lets a Class E building change to homes by prior approval, without full planning permission. An Article 4 direction can remove that right. Our guide to how Class MA commercial-to-residential works sets out the rules the direction removes.

A glazed London office block: whether it can become homes without a full application depends on the direction over its address

The City of London made its direction on 13 May 2021. It covers all land in the City. It removes Class MA for offices (Class E(g)(i)) changing to homes. It has applied since 1 August 2022.

Lambeth's three directions also took effect on 1 August 2022. The Secretary of State then cut them back to selected areas, and the modified directions have applied since 28 October 2022. Read the modified direction, not the original notice.

The Secretary of State can modify or cancel a direction at any time. An old council notice is therefore not proof of today's position. Check the live direction for the address, and read which classes it names. The kinds of building in Class E differ, and a direction can be narrower than the right.

Where a direction applies, the change needs a full application. The council then judges the scheme against its local plan rather than a fixed list.

London boroughs with Article 4 directions on Class MA and HMOs

Two directions change a London deal most. One removes Class MA, the right to turn offices and shops into homes. The other removes Class L, the right to turn a house into a small HMO. We read each row below on the council's own page, notice or direction on 2 November 2026.

"Not checked" means we did not verify that borough on the day. It does not mean the borough is clear. Enfield's pages would not load for us, so it is not listed.

Article 4 directions in London boroughs, verified 2 November 2026
BoroughClass MA: offices and shops to homesHMO: house to small HMO
City of LondonAll land in the City, offices only, since 1 August 2022Not checked
WestminsterMost of the CAZ, cut back by the Secretary of State on 22 July 2022; town centres outside the CAZ, confirmed 5 December 2022None listed on the council page
CamdenParts of the borough since 29 July 2022; modified areas since 23 February 2023Not checked
IslingtonKing's Cross CAZ and three specialist areas since 31 August 2023; six more areas since 1 September 2025Not checked
HackneyCAZ, City Fringe and town centres since 27 April 2023; industrial areas since 5 October 2023None listed on the council page
Tower HamletsParts of the borough since 18 August 2022; area revised in June 2023Whole borough, since 1 January 2021
LambethSelected CAZ, business and town centre areas since 28 October 2022Two Streatham wards, since 11 August 2025
SouthwarkCAZ, railway arches, town centres, site allocations, industrial land and shopping frontages; no date on the pageTwo streets only, in SE17 and SE16
Kensington and ChelseaParts of the borough, as modified, since 27 July 2022None listed on the council page
Wandsworth60 areas, including the CAZ, centres, parades and business areas, since 29 July 2022None listed on the council page
RichmondSites as modified by the Secretary of State, since 29 July 2022Not checked
KingstonTown centres, local centres and industrial areas since 31 July 2022; smaller areas since 14 June 2023Not checked
HounslowTown and neighbourhood centres, industrial sites and key office locations, since 22 April 2025Whole borough with exclusions, since 4 September 2023
HillingdonReduced area since 27 March 2024, first in force 24 September 2022Whole borough, date not stated on the council page
BromleyTown centres, business areas, office clusters and industrial sites, as modified, since 27 September 2023All wards, since 1 September 2022
Hammersmith and FulhamProposed for 44 locations; consultation closed 23 January 2025Proposed: Cabinet agreed on 9 February 2026
Barking and DagenhamNot checkedWhole borough, since 14 May 2012
BarnetNot checkedWhole borough, since 29 May 2016
BexleyNot checkedWhole borough, since 24 September 2017
BrentNot checkedMost of the borough, since 1 November 2022
CroydonNot checkedWhole borough, since 28 January 2020
EalingNot checkedWhole borough except the OPDC area, since 14 November 2025
GreenwichNot checkedWhole borough, since 27 September 2018
HaringeyNot checked14 eastern wards, since 30 November 2013
HarrowNot checkedWhole borough, since 12 June 2026
HaveringNot checkedAny house in four wards; flats, terraces and semis elsewhere, since 13 July 2016
LewishamNot checkedWhole borough, since 19 January 2024
MertonNot checkedSeven wards since 17 November 2022; the other 13 since 24 March 2026 (immediate)
NewhamNot checkedWhole borough except the LLDC area, since 31 July 2013
RedbridgeNot checkedWhole borough, since 6 December 2019
SuttonNot checkedWhole borough, since 2025
Waltham ForestNot checkedWhole borough, since 16 September 2014

Two patterns matter for a buyer. In 11 of the 15 boroughs with a Class MA direction, the council's page records that the Secretary of State cut the area back. The 2021 maps therefore overstate what is covered, so read the modified plan.

HMO directions run the other way. They started in outer east London in 2012 and still spread, with Harrow, Ealing and Merton added since 2025. For ward lists and what the officer tests, read our guide to HMO Article 4 directions in London.

If a house still works as an HMO once you apply, our HMO conversion team prices the application and the build together.

Article 4 in conservation areas

In a conservation area, a direction can remove householder rights. Those sit in Part 1 of the Order: extensions, roof alterations, porches and hard surfaces. They also sit in Part 2: gates, fences, walls and exterior painting. Newham's page lists directions in three conservation areas.

A stucco terrace with sash windows and iron balconies, the kind of frontage a conservation-area direction protects

Listed buildings are a separate regime. Works that affect a listed building's character need listed building consent, direction or not. The rule is section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990.

A conservation area also shapes what a scheme can do. Our Allitsen Road feasibility study in St John's Wood covered a former members' club in a conservation area. We designed and priced four options and issued them in four weeks. See the Allitsen Road case study.

We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

Polina Lysenko, Google reviewSee all reviews on Google

How to check whether a property is in an Article 4 area

No single map is complete. Use four checks, in this order.

  1. National dataset. On 29 October 2026 the Article 4 direction area dataset on planning.data.gov.uk held 7,649 areas from 120 providers. It warns that the data may be incomplete, so treat it as a first look.
  2. Council page and map. Each borough publishes its directions and a plan. Look up your address, and note the date the direction takes effect.
  3. The direction itself. It names the rights removed and shows the area on a plan. Read the schedule, not the headline.
  4. The consultation list. A proposed direction is advertised before it takes effect, with notices on site and to owners and occupiers. Ask the council what is proposed, because the map may not show it yet.

If the answer is still unclear, a lawful development certificate fixes it for a specific use. Our guide to the certificate of lawfulness explains when it is worth the fee.

Your building is covered: full planning instead of prior approval

Without a direction, offices and shops can become homes under Class MA. That is permitted development with a prior approval step. A direction removes the route for that building, and the change needs a full planning application.

The difference is more than paperwork. Prior approval checks a fixed list. Full planning tests the whole scheme against the borough's local plan.

Prior approval against full planning for the same offices-to-homes scheme
PointPrior approval, no directionFull planning, direction in force
What the council judgesA fixed list: transport, contamination, flooding, noise, natural light, fire safety and a few moreThe whole scheme against the local plan
Time limit56 days8 weeks; 13 weeks for 10 or more homes
No decision in timeThe change may go ahead as applied forNo consent, so the scheme cannot start
Policy testsNone beyond the listLocal plan policies, which can cover loss of office or shop space, housing mix and affordable homes

If you already hold prior approval, check its date. One granted before the direction took effect still stands if the homes are finished within three years.

If not, plan the full application before you buy or sign a lease.

  1. Read the policy the officer will use. Covered areas are usually the ones a borough wants to keep for business. Find the policy on losing office or shop space and the evidence it asks for.
  2. Keep some commercial space. A scheme with a shop or office at street level and homes above can fit that policy where a full conversion would not.
  3. Design to the full standard. The officer looks at the homes as new homes: size, light, outlook, cycle and bin storage.
  4. Count the homes. Ten or more homes make it a major application, with a 13-week period and more policy tests.
  5. Price the scheme with the application. The cost of the build and the cost of the consent decide the deal together.

We prepare the change of use application application with the build priced beside it. You see the scheme the officer will test and what it costs, before you commit.

Your site is in an Article 4 area: the options

A direction narrows the route. It does not close it. You have four moves.

  1. Apply for planning permission. There is a council fee, set out in our guide to planning application fees. There is also a decision period, covered in how long planning permission takes.
  2. Redesign to a use the direction does not touch. A direction names specific rights, so a different change may sit outside it.
  3. Price before you buy. Cost the works and the application together, and ask what the refusal case looks like.
  4. Know the compensation position. Compensation is narrow, as the next paragraph explains.

Compensation is payable only if the council later refuses permission for development that was otherwise permitted, or grants it with more limiting conditions. It covers abortive expenditure or direct loss or damage. The claim must be made within 12 months of the direction taking effect.

The statute rules compensation out where notice was published at least 12 months before the direction took effect. That is why councils give long notice, and why buyers watch the consultation list as well as the map.

Take this list to the first call with the seller or agent. If the building is a whole site rather than a single house, send us the address and we confirm the route before you commit.

  • The exact address and its title plan
  • The borough's Article 4 page and map, checked on the day
  • The direction document: rights removed, area and date in force
  • Any direction proposed but not yet confirmed
  • The current use and how long it has been lawful
  • A lawful development certificate, if the history is unclear
  • A priced scheme for the route that remains

Frequently asked questions

What is an Article 4 direction?

An Article 4 direction is an order made by a council or the Secretary of State that withdraws named permitted development rights over a defined area. The works or change then need a planning application. It does not prohibit them: the council can consider the proposal in more detail, and a planning fee may be payable.

Do I need planning permission for an HMO in an Article 4 area?

Yes, if the direction removes the right to change a home (Class C3) to a small HMO (Class C4). Without a direction, Class L permits that change. A house with more than six residents falls outside Class C4, so it needs planning permission whether or not a direction applies. Licensing is a separate regime.

How do I find out if my property is in an Article 4 area?

Start with the national Article 4 direction area dataset on planning.data.gov.uk, then check the borough's own Article 4 page and map. Read the direction itself for the rights removed and the area, and ask the council about directions proposed but not yet in force. A lawful development certificate settles a doubtful case.

Does an Article 4 direction stop office to residential conversions?

Only where a direction removes Class MA over that building. On 2 November 2026 we verified Class MA directions in 15 London boroughs, from the whole City of London (offices only) to selected areas of Lambeth and Westminster. There the conversion needs full planning permission instead of prior approval. Check the live direction for the address.

Which London boroughs have Article 4 directions?

Most of them. On 2 November 2026 we verified Class MA directions on offices and shops in 15 boroughs, including the City, Westminster, Camden, Islington and Hackney, and HMO directions in 22, mostly in outer London. Hammersmith and Fulham has both proposed. Many Class MA areas were cut back by the Secretary of State, so read the modified map.

What happens if my building is covered by an Article 4 direction?

The change needs a full planning application instead of prior approval. The council then judges the whole scheme against its local plan, not a fixed list, and has 8 weeks, or 13 weeks for 10 or more homes. A prior approval granted before the direction took effect still stands if the homes are finished within three years.

Can I get compensation if an Article 4 direction removes my rights?

Sometimes. Compensation is payable only if the council later refuses permission for development that was otherwise permitted, or grants it with more limiting conditions. It covers abortive expenditure or direct loss or damage. The statute rules it out where notice was published at least 12 months before the direction took effect.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Know the route before you buy the building.

Send us the address and what you know of its use. We confirm whether a direction applies and which route is left, free, then price the works.

WhatsApp us