Planning Application Fees 2026: Every Cost of Consent in London

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 8 min read

Stone portico of the Royal Exchange with glass office towers and a crane behind, City of London

The short answer

Since 1 April 2026 a full planning application in England costs £610 for each new home where there are fewer than ten, £659 each from ten to 49, and £610 for every 75 m² of new commercial floorspace. A further rise is proposed for 8 December 2026.

  1. Change of use to flats: £610 per flat. Class MA prior approval: £260 per home. Householder extension: £548.
  2. Proposed from 8 December 2026, if Parliament approves: £752 per new home, £700 per converted flat, £323 per Class MA home.
  3. London pre-application advice is charged on top, with VAT: £7,393 for a ten-home scheme in Hounslow, £12,835 in Lambeth.
  4. The council fee is the smallest line. Reports, CIL, Section 106 and a wasted resubmission cost far more.

Planning application fees in England are set nationally and rose on 1 April 2026. A full application now costs £610 per new home where there are fewer than ten, and £659 each from ten to 49. New commercial floorspace costs £610 for every 75 m². A change of use to flats is £610 per flat, a householder extension £548.

A further rise is proposed for 8 December 2026. In London, though, the council fee is usually the smallest cheque you write before consent. Pre-application advice, the technical reports, CIL and Section 106 come on top, and a refused application pays the fee twice.

This guide gives the full 2026 table, the proposed December figures, what two London boroughs charge for pre-application advice, and where the real money goes. Budgeting a scheme? Our planning consultant London service starts with a free site appraisal. Get a free site appraisal and we check the fee, the route and the costs behind it.

Planning application fees 2026: the council fee by application type

The fee depends on what you apply for and how much of it. Full applications are charged per home or per 75 m² of new floorspace. Outline applications are charged per 0.1 hectare of site. Part of a unit counts as a whole unit, so 80 m² of new floorspace pays for two lots of 75 m².

The table shows the fees in force since 1 April 2026, with the proposed figures for applications made from 8 December 2026 alongside them.

Planning application fees in England, 2026
ApplicationFrom 1 April 2026Proposed from 8 December 2026
Householder: extend or alter a house£548£575
Full: new homes, fewer than 10£610 per home£752 per home
Full: new homes, 10 to 49£659 per home£818 per home
Full: new commercial floorspace, 40 to 1,000 m²£610 per 75 m²£705 per 75 m²
Full: new commercial floorspace, 1,000 to 3,750 m²£659 per 75 m²£759 per 75 m²
Full: alterations with no new floorspace£309£357
Outline: homes on a site under 0.5 ha£610 per 0.1 ha£719 per 0.1 ha
Reserved matters, full fee already paid£610£749
Change of use to flats, fewer than 10£610 per flat£700 per flat
Change of use to flats, 10 to 49£659 per flat£799 per flat
Any other change of use£610£732
Prior approval, Class MA (Class E to homes)£260 per home£323 per home
Prior approval, Part 20 upward extension, fewer than 10 homes£441 per home£597 per home
Prior approval, other Part 1 and Part 3 classes£249£310
Section 73: vary or remove a condition, major scheme£2,076£3,150
Section 73: vary or remove a condition, non-major£608£608
Discharge of conditions, other than householder£309£435
Non-material amendment, other than householder£309£360
Lawful development certificate, existing useFull application feeFull application fee
Lawful development certificate, proposed useHalf the full feeHalf the full fee
Maximum fee on a single application£427,537£513,512

Four things in the schedule catch developers out.

  1. Schemes above 49 homes change formula. Today the fee is £32,578 plus £196 for each home above 50. The draft keeps £818 per home for the first 49 and adds £236 for each home above that.
  2. Mixed schemes are not simply added up. Homes over shops, or offices with a gym, follow the Planning Portal's combination rules. Get the figure confirmed before you submit.
  3. Conversions count the homes you create. One house becoming three flats pays for two additional homes, not three.
  4. Two proposals on the same day cost less. An alternative scheme for the same site, submitted by the same applicant on the same day, pays half the fee. That applies to the cheaper of the two.
£6,590ten new flats, full application, 1 April 2026 fee
£8,180the same application from 8 December 2026, if approved
£2,600ten flats under Class MA prior approval today
£3,230ten Class MA flats under the proposed fee

The proposed increase from 8 December 2026

The Government has published draft amending regulations, updated on 1 September 2026. They come into force on 8 December 2026 only if Parliament approves them. Until then the April 2026 fees apply, and the draft figures can still change.

The draft applies the new fees to applications made on or after that date. An application made on 7 December pays the current fee, even if the decision comes in 2027. The draft also resets the annual inflation adjustment, so the next routine change would fall on 1 April 2027.

Where the draft bites hardest

In money terms the biggest steps fall on developers rather than homeowners. A Section 73 application on a major scheme goes from £2,076 to £3,150. Each new home in a full application goes from £610 to £752. Discharging a condition goes from £309 to £435, and the maximum fee on one application rises to £513,512.

I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away. We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP. We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care. We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

Lia Lavryk, Google reviewSee all reviews on Google

Pre-application advice charges in London

Application fees are national. Pre-application charges are set by each borough, include VAT, and are not refundable. They buy a meeting with a case officer and a written view of what the council will resist. Two 2026/27 schedules show the range.

Gothic stone façade and oak doors of Guildhall, the City of London Corporation's civic seat
Each London borough runs its own fee schedule for pre-application advice; the application fee itself is national.
Pre-application charges, Hounslow and Lambeth, 2026/27 (including VAT)
SchemeHounslowLambeth
Householder, written advice only£408.44£491.00
One or two new homes£1,216.90 for one, plus £337.57 per extra home£3,683.02
Three to eight new homes£1,216.90 plus £337.57 per extra home£5,031.92
Ten new homes£7,393.22£12,834.86
Twenty new homes£8,223.92£12,834.86
21 to 50 new homes£7,393.22 plus £83.07 per home above ten£21,832.00
Commercial floorspace, about 1,000 m²£7,393.22£12,834.86

Lambeth includes one meeting in each fee and charges £5,352.00 for a follow-up meeting on a scheme of nine to twenty homes. Schemes of 51 homes or more are quoted individually, and most boroughs offer a planning performance agreement for large or complex sites.

Is it worth it? On anything beyond the routine, yes. Officers tell you what they will resist before you pay for a full design. The advice is not binding, so it has to be tested against policy and precedent. Our guide to pre-application planning advice in London covers what to bring and what to ask.

The costs the fee table hides

A ten-home scheme in London pays the council £6,590 for the application and perhaps £7,000 to £13,000 for pre-application advice. Neither figure is the budget. The money goes on what the validation checklist demands and on what the consent obliges you to pay.

Printed architectural floor plans of an apartment block spread across a table
The reports and drawings behind an application usually cost more than the fee itself.
  1. Technical reports. Daylight and sunlight, transport, noise, contamination, flood risk, heritage, ecology, energy and a fire statement on taller buildings. Each one is a consultant's fee, and a block of flats in London rarely needs fewer than five.
  2. Drawings and the planning case. Existing and proposed drawings, a design and access statement and a planning statement. Thin submissions are the usual cause of a refusal, so this is not the place to save.
  3. CIL. The Community Infrastructure Levy is charged per square metre of new floorspace by the borough and by the Mayor. It is payable once work starts and is often many times the application fee. Our guide to CIL and Section 106 explains how both are calculated.
  4. Section 106 and affordable housing. Negotiated obligations, and on larger schemes the biggest line in the viability appraisal. They should be in the numbers before the application, not discovered at committee.
  5. Time. Rent, finance and a lender's deadline run while the council decides. Our guide to how long planning permission takes sets out the real timescales.

Small fees, same evidence

The routes with the smallest fees are not always the cheapest. A full application for change of use planning permission costs £610 per flat, while prior approval for office to residential costs £260 per home. Both still need daylight, noise, transport and flood evidence, and prior approval has to be decided in 56 days.

How to avoid paying the fee twice

The free second attempt has gone. Until 6 December 2023 an application resubmitted within twelve months of a refusal or withdrawal paid no fee. That exemption was removed, so every resubmission now pays the full fee again. Five habits keep the fee to one payment.

  1. Vary rather than reapply. If a condition is the problem, a Section 73 application costs £608 on a non-major scheme. A small change to the approved drawings is a non-material amendment at £309.
  2. Do not sign away the refund without thinking. The fee is refunded if the council fails to decide within 26 weeks on a major application, or 16 weeks on a smaller one. Agreeing an extension of time in writing removes that refund.
  3. Submit alternatives together. Two proposals for the same site on the same day pay one full fee and half of the other.
  4. Use the pre-application meeting for the hard questions. Height, massing, affordable housing and daylight. Those are the reasons London schemes are refused.
  5. Cost the scheme while it is drawn. A consent that cannot be built for the appraised cost gets redesigned and resubmitted, with a second fee and a second year.

Where we start

The last point is where we start. At Allitsen Road in St John's Wood we appraised a derelict club as four costed schemes, in four weeks. Each came with a planning strategy, before any application was made. Our Development Director has taken more than 10,000 homes through planning, and the construction team prices every option while it is being drawn.

What a London scheme should budget before consent

The council fee is the one cost in this guide you cannot negotiate. Everything else can be reduced by getting the scheme right before it is submitted. That means an officer's view before the design is fixed. It means a report list agreed with the validation team, and CIL and Section 106 in the appraisal from day one.

We take development schemes from £3M to £150M GDV and run planning, design, cost and construction as one team. Craftex has built that way since 2016, with around 60% of labour in-house and every project delivered ahead of programme and on budget.

If you want the full cost of consent on your site before you pay the first fee, get a free site appraisal.

Before you pay the council fee

  • Count the homes or the floorspace the way the schedule does: part of 75 m² is a full 75 m².
  • Check the submission date against 8 December 2026.
  • Ask the borough for its current pre-application schedule and whether VAT is included.
  • List every report on the borough's validation checklist and price them.
  • Put CIL, Section 106 and affordable housing into the appraisal before the application goes in.
  • Cost the scheme as drawn, so the consent you pay for is one you can build.

Frequently asked questions

How much does planning permission cost for flats?

For new-build flats the council fee since 1 April 2026 is £610 per flat where there are fewer than ten and £659 each from ten to 49. Converting a building into flats costs £610 per flat for fewer than ten and £659 each from ten to 49. Under Class MA prior approval the fee is £260 per home. From 8 December 2026 the proposed figures are £752, £818, £700, £799 and £323. Reports, pre-application advice, CIL and Section 106 come on top.

Is there a fee for prior approval?

Yes. Most prior approval applications cost £249, Class MA office or shop to homes costs £260 per home, and a Part 20 upward extension costs £441 per new home where there are fewer than ten. The proposed December 2026 figures are £310, £323 and £597. The fee is lower than a full application because the council checks a fixed list of matters rather than the whole scheme.

How much is a pre-application meeting in London?

Each borough sets its own charge and adds VAT. In 2026/27 Hounslow charges £408.44 for written householder advice and £7,393.22 for a major scheme of ten homes, plus £83.07 for each extra home. Lambeth charges £491.00 for written householder advice, £12,834.86 for nine to twenty homes and £21,832.00 for 21 to 50 homes, each including one meeting. Schemes of 51 homes or more are quoted individually.

Do I pay the planning fee again if my application is refused?

Yes. The free resubmission within twelve months was removed on 6 December 2023, so a second application pays the full fee again. If a condition is the problem, a Section 73 application to vary it costs £608 for a non-major scheme. The fee is refunded only where the council fails to decide within 26 weeks for a major application or 16 weeks for a smaller one, and no extension of time was agreed.

What does a planning consultant cost?

Most consultants charge per stage: appraisal, pre-application, the application itself, then an appeal as an extra. Specialist reports are usually excluded, so ask for the exclusions before you compare quotes. We quote planning and design work as one figure after a free site appraisal, with the construction team pricing the scheme while it is drawn.

What is CIL and who pays it?

The Community Infrastructure Levy is a charge per square metre of new floorspace, set by the borough and by the Mayor of London, and paid by the owner or developer once work starts. It sits outside the application fee and is often many times larger. Section 106 is a separate negotiated agreement covering affordable housing and site-specific obligations. Our guide to CIL and Section 106 explains both.

Are planning application fees going up in December 2026?

A rise is proposed. The draft regulations published on 1 September 2026 would come into force on 8 December 2026 if Parliament approves them. They apply to applications made on or after that date, so an application validated before it pays the current fee. Until the regulations are made, the 1 April 2026 fees stand.

How much does retrospective planning permission cost?

The same as the equivalent application made in advance. The fee schedule has no separate rate for retrospective applications, so an extension pays the householder fee and a conversion pays the change of use fee. The real cost is the risk: if the council refuses, enforcement can require the work to be undone.

Is there a planning application fee calculator?

The Planning Portal publishes one for England, and it is the figure the council will check against. For a single category of development the table in this article gives the same answer. Mixed schemes, sites over 2.5 hectares and schemes above 49 homes use banded formulas with a maximum fee, so send us the scheme and we calculate it with the rest of the budget.