Planning Rules for Converting a House into Flats in London

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read

Victorian terraced houses with bay windows on a tree-lined London street

The short answer

Converting a house into flats in London always needs planning permission, and most boroughs only allow it for larger houses. Every new flat must also meet the space standards and Building Regulations.

  1. Check your borough's minimum size: 130 m² is a common threshold.
  2. Test every flat against the London Plan space standards before you design.
  3. Budget for fire separation and sound insulation between flats.
  4. Agree the 5% VAT rate and the CIL position before you sign a contract.

The first question isn't how to lay out the flats. It's whether your borough will let the house be split at all.

To convert a house into flats in London, you always need planning permission. Most boroughs only allow it for larger houses, and many want one family-sized flat kept. Every new flat must meet the space standards. The work also needs Building Regulations approval.

This guide takes you through each test in order. Own a house that could become flats? Book a site visit and we'll check it with you. For the planning, design and build under one contract, see our house to flats conversion service.

Planning permission to convert a house into flats is always needed

The law treats using one house as two or more homes as a material change of use. There are no permitted development rights for it. So a house conversion always needs a full planning application.

A listed building also needs listed building consent. Unconsented works to a listed building are a criminal offence.

The borough then judges the scheme against its local plan: the size of the house, the mix of flats and the space each one gets.

Converting a house into flats: the permitted development myth

There is no permitted development route to split a house into flats, not even into two. Planning law treats it as a change of use, so the work always starts with a planning application.

Three myths come up again and again.

Common permitted development myths about converting a house into flats
What people hearWhat the law says
"Two flats with no outside works is permitted development"Using one house as two or more separate homes is a material change of use (Town and Country Planning Act 1990, s.55(3)(a))
"Class MA lets you convert to flats"Class MA covers buildings in commercial Class E use, not houses
"Class L lets you change a house's use"Class L only switches a house to a small HMO and back; it excludes splitting into two or more homes

The practical point: budget for a planning application and its timetable from the start. A seller or agent who says the split "is permitted development" is describing a different right.

Step 1: check your borough allows the conversion

Each borough sets its own rules in its local plan, mostly to protect family homes. Two examples show the pattern.

Two London borough policies on house conversions
Borough policyMinimum sizeFamily unitOther tests
Lambeth, Policy H6Homes under 130 m² as originally built are protectedA family-sized home at ground floor with garden access, where practicableNo parking permits for new units in a CPZ; cycle and bin storage
Brent, Policy BH11At least 130 sq m, or reasonably extendable to itAt least one 3-bedroom home, ideally with a gardenSite at PTAL 3 or above

Other boroughs use similar tests with different numbers. Some limit how many conversions a street can have. Check the local plan, any supplementary guidance and any Article 4 direction. Look at recent decisions on similar houses nearby. If the policy is unclear, a pre-application enquiry is often worth it.

We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

Apartify Estates, Google reviewSee all reviews on Google

Step 2: test the flats against the space standards

Every new flat, including one made by conversion, must meet London Plan Policy D6. That means the Nationally Described Space Standard: minimum floor areas, bedroom sizes, built-in storage and a 2.5 m ceiling for most of the flat. Private outdoor space is expected where possible.

Allitsen Road, St John's Wood: the vacant corner building seen from Charlbert Street
Street view from our 74 Allitsen Road feasibility study, St John's Wood.

In a period house, this is where schemes fail. A tall ground floor and a low loft rarely give equal flats. Stairs, a new lobby and fire separation all take space. Our guide to nationally described space standards has the full table.

At 74 Allitsen Road in St John's Wood, we studied a vacant four-storey corner building of 458 m². Our team drew a schedule of accommodation for four design options. We tested each one against the London Plan space standards. The options ranged up to seven flats. Testing the numbers first tells you whether a scheme works.

Step 3: heritage, neighbours and the outside

The borough also looks at what the conversion changes outside the front door. Three issues come up on most London houses.

  1. Conservation area. New doors, front bins and bike stores, roof changes and rear extensions are judged against the area's character.
  2. Extensions. A loft or rear extension that makes the scheme work usually goes in the same application.
  3. Party walls. Work to shared walls or new foundations near neighbours brings in the Party Wall Act.

Step 4: Building Regulations for a house to flats conversion

Creating flats in a house is a material change of use under the Building Regulations too. These are the main requirements.

Building Regulations items in a house conversion
AreaWhat it means in practice
Fire safetyFire-resisting separation between flats and to the common stair, fire doors, a protected escape route, smoke alarms
SoundSound insulation in separating floors and walls, normally proven by testing before completion
StructureNew openings, steel beams and new loads checked by an engineer
VentilationKitchens and bathrooms ventilated to current standards
EnergyInsulation and heating upgrades for the work done
Drainage and waterNew soil stacks and supplies routed through the building
ServicesUsually separate meters and heating for each flat

Fire separation and sound insulation through an old timber floor drive cost most often. They also eat ceiling height. Survey before you design, and keep building control involved until the completion certificate is issued.

Step 5: the costs that are easy to miss

Community Infrastructure Levy. Any new home is potentially liable for the Mayor's and the borough's CIL. But floorspace in lawful use for six continuous months in the three years before permission can be deducted. That often brings a straight conversion down to little or nothing. A long-empty house can lose the deduction. See our guide to CIL and Section 106.

VAT. A conversion that changes the number of homes qualifies for the reduced 5% VAT rate on the building work. One house into three flats is a typical case. The contractor must apply it correctly, so agree it before the contract. The empty-homes route is covered in VAT on empty homes refurbishment.

Tenure. Selling flats usually means granting long leases and setting up a freehold or management company. Plan the service charge and insurance. If you'll keep and let them, check your borough's licensing rules and your lender's criteria for converted flats.

The conversion process, start to finish

  1. Feasibility. Survey, measured drawings, borough policy check, outline layouts, cost and value.
  2. Pre-application advice. Optional, but useful where policy is tight.
  3. Planning application. Drawings, design and access statement, heritage statement if needed, cycle and bin details.
  4. Technical design. Structure, fire strategy, acoustics, services and the Building Regulations application.
  5. Party wall notices. Served early enough not to hold up the start.
  6. Tender and contract. A lump-sum price on a full specification.
  7. Construction. Strip-out, structure, separation, services and fit-out.
  8. Testing and sign-off. Sound tests, completion certificate, fire and electrical certificates.
  9. Sale or letting. Leases, management and warranties.

Before you commit to a conversion

We take house and building conversions from feasibility and site appraisal through planning to construction. We also refurbish prime homes across London. The Kensington Olympia penthouse was 400 sq m, designed and refurbished in 12 weeks while the building stayed occupied. For prime houses, see our home renovation and refurbishment service.

Own a house in London that could become flats? Book a site visit and we'll tell you how many homes it could take.

House to flats checklist

  • Check the original floor area against the borough threshold.
  • Read the borough's conversion policy and recent decisions on your street.
  • Test the layouts against the London Plan space standards.
  • Check listed status, conservation area and Article 4 directions.
  • Survey floors and walls for fire and sound upgrades.
  • Confirm the CIL in-use evidence and the 5% VAT position.
  • Price the build on a full specification, not a rate per m².

Frequently asked questions

Do I need planning permission to convert a house into flats?

Yes. Using a single house as two or more separate homes is a material change of use under planning law. There are no permitted development rights for it. A listed building also needs listed building consent.

How big does a house need to be to convert into flats in London?

It depends on the borough. Many set a minimum original floor area, and 130 m² is a common figure, for example in Lambeth and Brent. Some also require at least one family-sized flat with garden access.

What are the Building Regulations for converting a house into flats?

The work needs Building Regulations approval. The main items are fire separation between flats and a protected escape route, tested sound insulation between flats, structure, ventilation, energy efficiency, drainage and separate services.

Can I convert a house into flats under permitted development?

No. Splitting a house into flats is not permitted development. It needs a full planning application, and the borough judges it against its local plan.

Do flats in a converted house have to meet space standards?

Yes. In London every new flat, including one created by conversion, must meet the Nationally Described Space Standard and London Plan Policy D6. That covers floor areas, bedroom sizes, storage and ceiling height.

Is VAT charged at 5% on converting a house into flats?

Building work for a conversion that changes the number of homes, such as one house into several flats, can qualify for the reduced 5% rate. The contractor must apply it correctly, so confirm it before the contract.

Do I have to pay CIL on a house to flats conversion?

A conversion creating new homes is potentially liable. But floorspace lawfully used for six continuous months in the three years before permission can be deducted. For many occupied houses that cuts CIL to little or nothing.

Own a house in London that could become flats?

Our team visits the house, checks the planning route and tells you how many flats it could take and what the work involves. Book a site visit.