Office Refurbishment Cost in 2026: Price per m², What It Includes and What Moves It

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 7 min read

Office corridor with black-framed glass partitions, a polished floor and black pendant lights

The short answer

An office refurbishment in the UK costs about £1,000 to £1,650 per m² for a basic refurbishment and £1,200 to £1,800 per m² for a high-quality one with air conditioning in 2026, before VAT and fees. London runs about 9 % higher.

  1. The scope sets the price: refresh the finishes, reconfigure the layout, or replace the services.
  2. Staying in the building adds phasing and out-of-hours work. It saves a second rent and a move.
  3. Asbestos survey, landlord's licence and building control come before the first price is final.

Office refurbishment cost in the UK in 2026 is about £1,000 to £1,650 per m² for a basic refurbishment. A high-quality one with air conditioning runs at £1,200 to £1,800 per m². In sq ft that is about £93 to £167, before fees and VAT.

Those are Laxton's Building Price Book 2026 figures for the building work. This guide shows what sits inside them, what pushes a price up, and how the sum compares with moving. It is written for businesses that are staying put. We carry out office refurbishment in London and across the UK.

Want a figure for your own floor? Get a fixed figure and send us the plan.

Office refurbishment cost per m² and per sq ft in 2026

Laxton's prices a refurbishment per m² of gross internal floor area. It excludes external works, professional fees and VAT. It also lists a London location factor of about 1.09, which is where the 9 % comes from.

Office refurbishment cost, UK 2026 (Laxton's NRM, excluding fees and VAT)
ScopePer m²Per sq ftLondon per m² (x 1.09)
Basic refurbishment£1,000 to £1,650£93 to £153£1,090 to £1,800
High quality, including air conditioning£1,200 to £1,800£111 to £167£1,310 to £1,960

The London column is our arithmetic, rounded to £10. Your building may sit either side of the factor.

Here is what that means for a 500 m² floor, about 5,380 sq ft.

Example 500 m² office refurbishment, building work only, excluding fees and VAT
ScopeUKLondon
Basic refurbishment£500,000 to £825,000£545,000 to £900,000
High quality, including air conditioning£600,000 to £900,000£650,000 to £980,000

A Cat B fit-out on a Cat A floor is a different sum, because it also buys furniture, AV and IT. Compare like with like: our office fit out cost per sq ft guide covers that budget.

For your own floor, try the office fit-out cost calculator.

What a refresh, a reconfiguration and a full refurbishment include

A band from £1,000 to £1,800 per m² is wide because "refurbishment" covers three different jobs. Most projects are one of these, and each one costs more than the last.

Glass-walled meeting room with a white table and black chairs, with tall windows onto trees
  1. Refresh. New floor, wall and ceiling finishes in the layout you have. Walls, services and lighting layout stay as they are.
  2. Reconfigure. A refresh plus a new layout: partitions, doors, joinery, lighting and power moved to suit, and new data cabling.
  3. Full refurbishment. A reconfiguration plus replacement air conditioning and ventilation, so the floor performs like a new one.

To price a refresh from real lines, use Knight Frank's cost table. It prints each fit-out line in pounds per sq ft. We added the lines up by level. The table assumes a Cat A starting floor and Central London prices, so treat it as a guide to proportions, not a quote.

Knight Frank fit-out lines grouped by refurbishment level, per sq ft (Spring 2025)
Lines addedLowMediumHigh
Refresh: floor, wall and ceiling finishes£13£27£42
Reconfigure: internal walls, doors and joinery£17£37£60
Reconfigure: electrical (fire alarm and power) and data cabling£13£24£30
Full refurbishment: air conditioning and ventilation£15£20£25
All four groups together£58£108£157

A refresh at £13 to £42 per sq ft is about £140 to £450 per m². All four groups together come to £58 to £157 per sq ft, or about £620 to £1,690 per m².

Laxton's starts higher because the two sources count different things. Use the sum as a floor for the lines you know you need, not as a total.

Refurbishing while your team is in the office

Many businesses that refurbish are staying because they have a lease to run or a building they own. Their team stays too. That changes what the work costs and how it runs.

Office desks in front of a tall steel-framed window with palms and plants

The works go in phases, one zone at a time. Noisy work moves to nights and weekends. Each phase keeps its own escape routes, toilets, power and data live. Out-of-hours labour costs more per hour, and phasing lengthens the programme. Dust screens and temporary protection are extra lines.

What you save is a decant. There is no second floor to rent, no move out and no move back. Our guide to office refurbishment while occupied sets out the phasing and the safety planning.

£350KBeaumont House, 750 sq m
3 weeksBeaumont House programme
7 monthsPortsoken House, 1,550 sq m

Beaumont House in High Street Kensington shows a hard deadline. The client had five weeks left on the lease. We rebuilt 750 sq m in three weeks for £350K and handed over with zero snags.

Portsoken House in Aldgate shows works around other people. We delivered 1,550 sq m with a full mechanical and electrical package in seven months. The other floors stayed let, so the noisy work ran at night and at weekends.

These are two project values, not rates. A project value divided by its area says nothing about your floor, so we price yours from a survey.

What pushes an office refurbishment cost up or down

Six things move a refurbishment between the bottom and the top of the band.

  1. Air conditioning and ventilation. It is the largest building-services line in Knight Frank's table, at £15 to £25 per sq ft. Replacing it is the step from reconfiguration to full refurbishment.
  2. Asbestos. HSE says asbestos may be in any building built or refurbished before 2000. Breaking into the fabric can need a refurbishment survey first. Under regulation 5 of the Control of Asbestos Regulations 2012, work cannot start without an assessment.
  3. Your landlord's consent. Most leases need a licence for alterations before any change to partitions or services. Read licence for alterations explained before you fix a programme.
  4. Building control and fire strategy. Moving walls changes escape routes and compartments. Our Building Regulations for an office fit-out guide lists what is checked.
  5. Rooms and finishes. Every enclosed room needs walls, a door, lighting and ventilation. Bespoke joinery and stone move a floor from the lower band to the upper.
  6. Out-of-hours working. Phasing and night work add labour and programme time, as above.

Internal alterations usually do not need planning permission. A listed building needs listed building consent for significant works.

A project that lasts longer than 30 working days with more than 20 workers on site at once is notifiable to HSE. So is one over 500 person days. The client holds that duty. Add VAT at 20 % on top of every figure in this guide.

Companies can claim full expensing on new plant and machinery bought from 1 April 2023. Which refurbishment items qualify depends on the work, so ask your accountant before you set the budget.

I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

John Smith, Google reviewSee all reviews on Google

Refurbish or relocate: what changes the sum

Both routes pay for building work. The difference is the set of costs that exist only if you move. Cost both on the same floor area, then compare the totals.

Cost lines that differ between refurbishing and relocating an office
Cost lineRefurbishRelocate
Building work on the floorYes, on the floor you haveYes, on the new floor
Rent on two offices at onceNoOften, while the leases overlap
Stamp Duty Land Tax on a new leaseNoCan apply, on rent and any premium
Dilapidations on the old officeOnly at the end of your current leaseYes, when you hand the old office back
Removals and IT moveSmall, by phaseYes
DisruptionPhased works around the teamOne move, and a new commute

SDLT on a new non-residential lease has two parts. The premium is taxed from £150,000 and the rent is taxed on its net present value from £150,000. Below those thresholds nothing is due.

Staying works best when the lease has years to run, the location suits the team and the building is sound. Moving works better when the building cannot take the layout you need. Our guide to office relocation cost prices the move side line by line, and our office relocation fit-out checklist covers it step by step.

Budgeting your refurbishment in five steps

You can do the first two this month. The rest need a surveyor on site.

  1. Survey and asbestos. Find the asbestos register and book a refurbishment survey where walls or ceilings will be opened.
  2. Brief from how the team works. Headcount, meeting rooms, quiet space and the busiest day of the week.
  3. Layout options. Test two layouts against cost before one is fixed.
  4. Price by element. Ask for a figure built unit by unit, so a cut is visible line by line.
  5. Programme around the business. Decide which zones close in which weeks, and what runs out of hours.

Want the sum for your floor before you brief anyone? Get a fixed figure. We price from the plan and your dates.

  • Floor plan and the area of the floor in m² or sq ft
  • The lease end date, any break date and the landlord's contact
  • The asbestos register and any survey reports you hold
  • How many people use the floor and on which days
  • Which parts must stay open during the works
  • Any quote you already hold for the same scope

Frequently asked questions

How much does an office refurbishment cost per square metre?

Laxton's Building Price Book 2026 puts a basic office refurbishment at £1,000 to £1,650 per m² and a high-quality one with air conditioning at £1,200 to £1,800 per m². Both exclude fees and VAT. Laxton's London factor of about 1.09 lifts them to roughly £1,090 to £1,800 and £1,310 to £1,960 per m².

What is the average cost of an office refurbishment in the UK?

There is no single UK average, because the scope decides the price. The nearest published guide is Laxton's: £1,000 to £1,800 per m² before fees and VAT, depending on spec. In sq ft that is about £93 to £167. Regions outside London usually sit lower.

Is it cheaper to refurbish or relocate an office?

Refurbishing avoids lines that exist only if you move: overlapping rent, Stamp Duty Land Tax on a new lease, dilapidations on the old floor, removals and the IT move. Both routes pay for building work. Cost both on the same floor area and compare the totals.

Can you refurbish an office while staff are working?

Yes. The works are split into phases, noisy work moves out of hours and each phase has its own protected routes and services. It costs more per hour of work than an empty floor, but you avoid a decant. Our guide to office refurbishment while occupied explains how it runs.

How long does an office refurbishment take?

Most office fit-outs take two to four months from design to handover. Scope and phasing change that. We rebuilt 750 sq m at Beaumont House in three weeks because the lease was ending. Portsoken House, 1,550 sq m with a full mechanical and electrical package, took seven months.

Do I need planning permission to refurbish an office?

Internal alterations usually do not need planning permission. A listed building needs listed building consent for significant works. Most leases need your landlord's licence for alterations, and building control applies to fire safety, escape routes and access.

Know the refurbishment cost before the board asks.

Send us the floor plan and tell us how your team works. We come back with a fixed figure and a programme.