Planning and Building Regulations Drawings Explained

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Red scale rule laid across a detailed technical drawing

The short answer

Planning drawings show the council what you want to build and how it will look. Building regulations drawings show building control how it will be built safely, with structure, fire, insulation, drainage and ventilation detailed.

  1. A planning set is a location plan, a site plan, and existing and proposed plans and elevations, plus what the council's local list asks for.
  2. Building regulations drawings add construction details and a structural engineer's calculations.
  3. Councils have 8 weeks to decide most householder applications; building control usually 5 weeks for full plans.
  4. Most invalid applications fail on paperwork: a missing red line, an unsigned ownership certificate or drawings that do not match.

Planning drawings show the council what you want to build and how it will look. Building regulations drawings show building control how it will be built safely. Most home projects need both, prepared in that order, and the second set is the one your builder prices.

This guide explains what each set contains, who can draw them, how long approval takes, what drives the cost and why councils reject drawings. It is written for London homeowners planning an extension, a loft or a remodel.

Our design team prepares drawings for London homes and our own builders build from them; our residential architects page shows how. Need drawings? Book a free design consultation and we will look at the house with you.

What a planning set contains

A planning set tells the council where the site is, what is there now and what you propose. The exact list is set by each council's validation checklist, called the local list, but a householder set usually holds these drawings.

  1. Location plan. The site on a map, outlined in red, with other land you own in blue.
  2. Site or block plan. The house, its boundaries and the extension in relation to them.
  3. Existing and proposed floor plans. Every floor that changes.
  4. Existing and proposed elevations. Each side of the house that changes.
  5. Sections and roof plans. Where height or the roof changes.
  6. Supporting documents. Whatever the local list asks for, such as a design and access statement or a heritage statement.

Every drawing must be to a recognised scale and labelled. The plans, elevations and sections must also match each other, or the application can be rejected before anyone looks at the design.

What building regulations drawings add

Building regulations drawings take the approved design and show how it will be built. They are more technical and more detailed than a planning set.

Floor plan drawing with columns, a stair and lift cores, a mechanical pencil resting on it
Building regulations drawings add the detail a builder prices and builds from.
  1. Construction details. Walls, floors and roofs layer by layer, with insulation and damp-proofing.
  2. Structure. Beams, columns and foundations, with a structural engineer's calculations.
  3. Fire safety. Escape routes, fire doors and protected stairs, often critical in a loft.
  4. Drainage and ventilation. New runs, connections and how rooms are ventilated.
  5. Specifications. The materials and standards the builder must use.

Approval comes from your council's building control or a private registered building control approver. A full plans application has the drawings checked before work starts. Lewisham, for example, decides within five weeks unless the applicant agrees an extension.

These drawings also become the builder's working information. On the RIBA Plan of Work, planning applications generally go in at the end of Stage 3, and the Building Regulations application during Stage 4.

Who can draw planning and building regulations drawings

Anyone can prepare the drawings. There is no legal requirement to use an architect, and many applications are drawn by architectural technologists, designers or a builder's own design team.

What the law protects is the title. Under section 20 of the Architects Act 1997, using the title architect in business without being on the Architects Register is a criminal offence. Check the register if someone uses the title.

What matters more is accuracy and coordination. The person who draws the planning set should also prepare, or closely coordinate, the building regulations drawings and the engineer's design. A gap between the two sets usually surfaces on site, as a redesign.

How long planning and building regulations approval take

The council has 8 weeks to decide most householder and minor applications. The clock starts the day after a valid application is received, and a longer period can be agreed in writing. Our guide to how long planning permission takes covers what councils actually achieve.

Building control usually decides a full plans application within five weeks, or a little longer by agreement. The two can run in parallel once the design is fixed, which keeps building regulations off the critical path.

The drawings themselves take longer than either approval. A measured survey, design options and your decisions come first, and on a London house the brief can be the slowest part.

What drives the cost of planning drawings

Drawings are usually priced as a fixed fee per set, or as part of a percentage fee. The HomeOwners Alliance guide for 2026, citing Checkatrade, puts single-storey extension planning drawings at £1,000 to £2,500, and two-storey at £2,000 to £3,500.

For building regulations and construction drawings, the same guide quotes £3,000 to £5,000 for a single-storey extension. A double-storey extension is £5,000 to £7,000. These are national figures.

Five things move the number:

  1. Size and complexity. More floors, more drawings.
  2. The building. A listed house or a conservation area calls for more information.
  3. The survey. An accurate measured survey costs money but saves redrawing.
  4. Revisions. Each round of changes, yours or the council's, is new work.
  5. Engineering. Structural calculations are usually priced separately.

The council's fee is extra: £548 for a householder application in England since 1 April 2026. Our guide to architect fees in the UK sets out the fee models stage by stage.

Common reasons councils reject drawings

Most applications that fail at the first hurdle fail on paperwork, not design. Lambeth Council lists ten common reasons an application is marked invalid.

An invalid application does not start the 8-week clock. Ask whoever draws your scheme to check it against your council's local list before it is submitted.

I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away. We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP. We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care. We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

Lia Lavryk, Google reviewSee all reviews on Google

How we prepare drawings for London homes

Many home projects stall between the planning drawings and the builder's price. When the design and the build sit in two firms, the drawings are priced after approval. If they come in over budget, redesign follows.

Our design team and our construction team work in one company. Each option is priced as it is drawn, and the building regulations drawings become the information our own trades build from. At Herbert Crescent in Knightsbridge, each layout, finish and fixing was agreed from drawings and samples before it was built.

Planning an extension? Our guide to the architect for a house extension covers what to expect. When you are ready, book a free design consultation and we will reply the same working day.

Lambeth's ten common reasons an application is invalid

  • No Community Infrastructure Levy additional information form
  • Application forms not signed or dated
  • Ownership certificate unsigned, undated or the wrong one
  • The wrong fee, or no fee
  • Drawings not labelled clearly
  • Inaccurate or incomplete plans and information
  • Plans, elevations and sections that do not match
  • Drawings not to a recognised scale
  • No red line around the site on the location plan
  • No design and access statement when one is required

Frequently asked questions

Do I need building regulations drawings if I have planning permission?

Yes. Planning permission and Building Regulations approval are separate. Planning covers what the building looks like and how it affects the area; Building Regulations cover how it is built: structure, fire safety, insulation, drainage and ventilation.

Can I draw my own planning drawings?

Yes, there is no legal requirement to use an architect or designer. The drawings must be accurate, to a recognised scale and consistent with each other, or the council can treat the application as invalid.

How much do planning drawings cost?

The HomeOwners Alliance 2026 guide quotes £1,000 to £2,500 for single-storey extension planning drawings and £2,000 to £3,500 for two storeys. The council's fee is extra: £548 for a householder application in England since 1 April 2026.

How much do building regulations drawings cost?

The same guide quotes £3,000 to £5,000 for building regulations and construction drawings for a single-storey extension, and £5,000 to £7,000 for a double-storey one. Structural calculations and building control fees are usually extra.

What is the difference between a full plans application and a building notice?

With full plans, building control checks the drawings before work starts and issues a decision, usually within five weeks. A building notice relies on inspections as the work goes on. Councils such as Lewisham expect full plans for work near a public sewer.