Curtain Walling Explained: How It Works, Which System, and What It Costs

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 8 min read

Full-height glazed office facade in London with a glass-enclosed staircase against a dusk sky

The short answer

Curtain walling is a non-load-bearing facade of aluminium framing and glazed or solid panels, hung from the building's structure. It carries only its own weight, wind and weather.

  1. Stick systems are built on site. Unitised panels arrive finished from the factory.
  2. The frame can outlast the glass units and seals by decades.
  3. Replacing a curtain wall brings Part L into play and, on tall residential buildings, regulation 7.

Curtain walling is a facade of aluminium framing filled with glass or solid panels, hung from the building's structure. It keeps the weather out and carries only its own weight and the wind.

This guide is for owners and asset managers of office and mixed-use buildings, and for anyone specifying a new facade. It covers the systems, how long each part lasts, the rules on replacement and what it costs.

Our curtain walling contractors survey, cost and replace facades in occupied buildings. Is yours leaking or fogging? Get a free survey and cost plan.

What curtain walling is

A curtain wall is the outer skin of a building, hung in front of the floors like a curtain. It is not part of the structure. The fire safety guidance describes curtain walls as walls that transmit only self weight and wind loads, and no floor load.

Close-up of a London glass office facade with a grid of mullions and transoms reflecting neighbouring towers
Mullions run vertically and transoms horizontally, and the glass sits between them

The skin is a grid. Vertical aluminium sections called mullions run from floor to floor. Horizontal sections called transoms divide each bay. Between them sit infill panels: glass units, or solid spandrel panels that hide the floor edge. Brackets fix the grid to the slabs, and gaskets and sealants make it weathertight.

Offices, hotels, schools, hospitals and mixed-use blocks all use it. A wall more than 25 years old is already past the expected life of its glass units, so many are now due a decision.

Stick, unitised and other curtain wall systems

Systems differ in where the work happens. Stick systems are built piece by piece on site. Unitised systems arrive as finished panels.

Curtain walling systems compared
SystemHow it is builtWhere it suitsSite or factory
StickMullions and transoms fixed to the slab edge, then glass and panels fittedLower buildings, complex shapes, repairsMostly on site
UnitisedFrames glazed and sealed in a factory, then lifted onto the slab as whole panelsTall buildings, repeated bays, tight programmesMostly in the factory
Semi-unitisedFactory-made frames or panels combined with glazing fitted on siteSchemes where a pure system does not fitA mix of both
Structurally glazedGlass fixed with structural silicone or point fixings, so little frame showsFlush elevations that look almost framelessDepends on the frame system

GreenSpec says stick systems are site assembled and carry a higher risk of workmanship non-conformities. Unitised systems are factory manufactured. The difference matters in an occupied building, because a unitised bay spends less time open to the weather.

BS EN 13830 is the product standard for curtain walling kits. Any new system should come with test evidence against it.

If a facade is already leaking, our curtain walling contractors can survey it and cost the options for you.

How long curtain walling lasts

Curtain walling rarely fails all at once. Its parts wear out at different speeds. GreenSpec's whole life guide gives an expected life for each.

Expected service life of curtain walling parts
PartExpected lifeWhat shortens it
Aluminium frameMore than 60 yearsThe finish: 15 to 30 years or more, by type
Insulating glass units25 yearsEdge seal failure lets moisture in
EPDM gaskets15 to 30 years or moreHardening and shrinking
Neutral-cure silicone sealant5 to 20 yearsWeather and movement at joints

So the frame often outlasts the glass. A wall that leaks or mists at 25 years is usually failing at the seals and units, not the aluminium.

Look for these signs.

  • Misted glass units, where moisture has entered the sealed cavity
  • Water marks or leaks at transoms and around the floor edge
  • Cracked, hard or shrunken gaskets and sealant joints
  • Corrosion or a flaking finish on the aluminium and its brackets

Survey before you decide. A survey records which parts have failed and how many. You then pay to fix what is broken, not the whole wall.

Curtain walling and the Building Regulations

Three regulatory sources touch a curtain wall, plus the product standard. Which apply depends on the work and the building.

Rules and standards that apply to curtain walling
RuleWhat it saysWhen it applies
Part L, Approved Document L Volume 2Maximum U-value of 1.6 W/m²KNew or replacement curtain walling, buildings other than dwellings
Regulation 7(2)External wall materials A2-s1,d0 or A1Storey 18 m or more above ground, with flats, an institution or residential rooms
Part B, Approved Document B Volume 2Fire-stopping where each compartment floor meets the external wallBuildings with compartment floors
BS EN 13830Product standard for curtain walling kitsThe system you buy

Part L: the 1.6 U-value

Approved Document L sets 1.6 W/m²K for curtain walling in Table 4.1, as an area-weighted average. It applies to new curtain walling and to replacement elements in existing buildings. The 2026 edition keeps 1.6 and takes effect on 24 March 2027 for most building work.

Whether reglazing alone triggers the standard depends on the scope. Agree it with building control before you price.

Regulation 7: combustibility on tall residential buildings

Regulation 7(2) requires materials in the external wall of a relevant building to be class A2-s1,d0 or A1. A relevant building has a storey at least 18 m above ground and contains flats, an institution or rooms for residential purposes. A tall office building with none of these is outside it.

Window frames and glass are exempt, as are seals, gaskets, fixings, sealants and backer rods. The exemptions do not name spandrel panels or insulation, so check each against the regulation.

Part B: fire-stopping at the floor edge

Approved Document B says the fire resistance of a compartment floor must be kept where it meets the external wall. Fire-stopping does that. On a curtain wall, this is the gap between the slab edge and the glazing line, hidden behind the spandrel. A replacement is the moment to open it up, inspect it and repair it.

Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

Pascal Hunt, Google reviewSee all reviews on Google

Curtain wall repair, re-glazing and replacement

Curtain wall repair starts with finding the failure, not with a price for a new facade. Most leaking or misted walls need the seals, gaskets or glass units renewed while the frame stays.

Finding the cause first {#diagnosis}

A survey from inside and from a cradle or access platform tells you which route fits. Four checks come first:

  1. Where the water shows. Leaks at the head of a floor often start at a joint above, not where the stain is.
  2. The glass units. Misting between the panes means the edge seal has failed and the unit needs replacing.
  3. Gaskets and sealant. Shrunk, cracked or missing gaskets let wind-driven rain past the outer line.
  4. The frame and fixings. Corroded brackets or failed drainage paths decide whether the frame can be kept.

A controlled water test on a sample bay, run by a specialist, proves the leak path before money is spent. Repair the cause, and the same bays stop leaking.

Four routes for a failing wall {#routes}

There are four ways to deal with a failing curtain wall. Each fixes a different failure.

  1. Reseal and regasket. Replace failed gaskets and sealant joints. It stops leaks at the joints and is the cheapest route.
  2. Reglaze. Replace misted glass units in the existing frame. It restores the view and the thermal performance, if the frame can take the new units.
  3. Refurbish the frame. Repair corroded fixings and refinish the aluminium. It suits a sound frame with tired parts.
  4. Replace the system. Strip the old wall and fit a new one. It resets the lifespan and meets current Part L, but costs most and takes longest.

Knight Frank's Spring 2026 landlord guide gives London benchmarks. It uses Central London as the base and excludes VAT and professional fees. We converted its per ft² figures to per m².

Facade cost benchmarks, Central London, Spring 2026, ex VAT and fees
Work£ per ft²£ per m²
Repairs to window seals and gaskets, including access (per ft² of facade)£1 to £5£11 to £54
Replace glazed windows with triple glazing, including access (per ft² of glazing)£10 to £25£108 to £269
Replacement of facades and windows£20 to £100£215 to £1,076

Outside London the guide cuts its rates. In the South East, for example, it takes 10% off. These are benchmarks, not a quote. Access, glass specification and the state of the frame decide the real price.

If the building is let, its energy rating matters too. Our guide to MEES rules for commercial property explains the standard landlords must meet. Timing the facade with a Cat A refurbishment of the floors means the new glazing is in before the next tenant moves.

Replacing a curtain wall in an occupied building

A curtain wall can be replaced while tenants stay in. The work follows a sequence that keeps every floor weathertight overnight.

  1. Survey and open up. Survey the wall, then open a sample bay to see the floor edge, the brackets and the fire-stopping.
  2. Design the sequence. Split the facade into bays or floors, so only a small part is open at any time.
  3. Weather each bay. Fit temporary weathering to each open bay before the old wall comes out.
  4. Work from outside. Use mast climbers, cradles or scaffold where you can, to keep work out of tenants' space.
  5. Hand back floor by floor. Finish, check and clean each bay before the next one opens.

CDM 2015 and notification

CDM 2015 applies to the work. A project is notifiable in two cases under regulation 6. One is work scheduled to last longer than 30 working days with more than 20 workers at once. The other is work that exceeds 500 person days. A large facade can pass either test.

Our guide to CDM 2015 client duties explains what the client must do.

Working around live tenants

At Portsoken House in Aldgate we delivered 1,550 m² of offices in seven months around occupied tenants. The Portsoken House reception was remodelled over nights and weekends, with tenants undisturbed.

Neither was a curtain wall job. They show how we phase work around the people in the building. Our guide to office refurbishment while occupied covers the method.

Use this list before you commit. Send us the address and photos, and get a free survey and cost plan. Already have a quote? Send it to us. We'll beat it.

  • A survey that records which glass units, seals, gaskets and brackets have failed, with photos
  • A sample bay opened to check the floor-edge fire-stopping and fixings
  • Building control's view on whether the 1.6 W/m²K standard applies to your scope
  • Regulation 7 checked, if a storey is 18 m or more above ground with flats or an institution
  • Test evidence against BS EN 13830 for any new system
  • Reseal, reglaze, refurbish and replace all priced, so you can compare
  • Temporary weathering and the access method agreed for each phase
  • Tenant notice, working hours and CDM notification agreed

Frequently asked questions

What is curtain walling?

Curtain walling is a non-structural outer wall of aluminium framing filled with glass or solid panels. It hangs from the building's floors and carries only its own weight and the wind. Vertical mullions and horizontal transoms form the grid, and gaskets and sealants make it weathertight.

What is the difference between stick and unitised curtain walling?

Stick curtain walling is built piece by piece on site: mullions and transoms first, then glass and panels. Unitised curtain walling arrives as factory-glazed panels that are lifted onto the slab. Unitised suits tall buildings and tight programmes. Stick suits lower buildings, complex shapes and repairs.

How long does curtain walling last?

The aluminium frame can last more than 60 years, but its finish needs attention sooner. GreenSpec gives insulating glass units an expected life of 25 years, EPDM gaskets 15 to 30 years or more and neutral-cure silicone sealant 5 to 20 years. The seals and glass therefore often fail before the frame.

Does curtain walling need to be non-combustible?

Only on a relevant building. Regulation 7(2) requires A2-s1,d0 or A1 materials in the external wall of a building with a storey at least 18 m above ground that contains flats, an institution or rooms for residential purposes. Window frames and glass are exempt, as are seals, gaskets, fixings and sealants.

What U-value must new curtain walling achieve?

Approved Document L Volume 2 sets a maximum of 1.6 W/m²K for curtain walling in buildings other than dwellings. It applies to new curtain walling and to replacement elements in existing buildings. The 2026 edition keeps the same figure and takes effect on 24 March 2027 in England for most building work.

How much does curtain walling cost per m²?

Knight Frank's Spring 2026 landlord guide puts replacement of facades and windows at £20 to £100 per ft² for Central London, excluding VAT and fees. That is about £215 to £1,076 per m². Only a survey of your building gives a real price, because access, glass specification and the state of the frame decide it.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

A facade that keeps the weather out and the tenants in.

Send photos and the address. We survey the curtain wall, cost the options and plan the work around your tenants, free.