Skip to content
Request a callbackCallback

For freeholders, RMCs and managing agents

Fire Doors for Flats: Rules, Ratings and Replacement

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Long corridor lined with timber-faced doors in warm light, with an exit sign at the far end

The short answer

A flat entrance door in a block is a fire door: Approved Document B asks for at least FD30S, a 30-minute doorset that limits smoke, with a self-closing device. In blocks over 11 metres the law also sets regular checks.

  1. Communal fire doors in blocks over 11 metres must be checked at least every 3 months.
  2. Flat entrance doors need best endeavours to check them at least every 12 months, with a record of attempts.
  3. Since 16 May 2022 the Fire Safety Order covers every door between a flat and the common parts.
  4. Replace a door when the doorset can no longer hold its rating: a mixed or altered set is not a certified set.

Fire doors for flats protect the escape route. In a block, the flat entrance door holds fire and smoke inside the flat while neighbours leave. So it must be a tested fire doorset that closes itself.

Approved Document B asks for at least FD30S at the flat entrance, with a self-closing device. In England, blocks over 11 metres also have set checks: communal doors every 3 months, flat entrance doors every 12 months.

We carry out fire door installation across whole London blocks, so this guide ends with how a replacement programme runs. We do not inspect or certify doors. Facing a block of failed doors? Get a free door schedule.

Fire door regulations for flats in blocks over 11 m

Regulation 10 of the Fire Safety (England) Regulations 2022 has applied since 23 January 2023. It sets duties on the building's responsible person in blocks with two or more flats.

Fire door duties under regulation 10, England
DutyWhich blocksHow often
Tell residents to keep fire doors shut, not tamper with closers and report faultsTwo or more flats, with common escape routesNew residents promptly, all residents every 12 months
Check communal fire doors, including that closers workOver 11 mAt least every 3 months
Check flat entrance fire doors, including that closers workOver 11 mBest endeavours, at least every 12 months
Keep a record of flat door checks and failed accessOver 11 mEach 12-month period

The flat door check is a "best endeavours" duty. If a resident refuses access, the responsible person records the steps taken to get in. A missing record is the gap a fire risk assessor finds first.

The Fire Safety Act 2021 settled an older argument. Since 16 May 2022, the Fire Safety Order covers all doors between flats and common parts in England. Flat entrance doors now sit inside the responsible person's fire safety regime.

FD30S ratings, self-closers and smoke seals

A fire door is a doorset, not a door. The rating belongs to the tested set: the leaf, frame, seals, glazing and hardware together. Approved Document B says small differences in the installed assembly may significantly affect the rating.

What the fire door ratings mean
RatingWhat it means
FD30Integrity for at least 30 minutes, tested to BS 476-22
FD30SAs FD30, with restricted smoke leakage at room temperature
E 30 SaThe European classification for the same performance
Self-closing deviceCloses the door from any open position; required on flat entrance fire doors

Approved Document B gives a minimum of FD30S, or E 30 Sa, for the door between a flat and a shared corridor or stair. Doors inside a flat do not need self-closers.

Who is responsible for a flat entrance door

Two questions get mixed up: who must check the door, and who owns and pays for it. The answers can differ.

The responsible person, usually the freeholder or management company, must bring the flat entrance doors into the fire safety regime and run the checks. Ownership sits in the lease. Many leases demise the front door to the leaseholder; others keep it with the landlord.

Who usually does what for flat entrance doors
TaskUsually
Fire risk assessment and door checksThe responsible person
Telling residents how to use fire doorsThe responsible person
Owning and repairing the doorSet by the lease: leaseholder or landlord
Consent to change the doorThe landlord, under the lease
Paying for a block-wide replacementSet by the lease and any service charge provisions

Where a door must be replaced as a building safety defect, the leaseholder protections in the Building Safety Act may cap what qualifying leaseholders pay. GOV.UK lists replacing inadequate fire doors as a non-cladding defect. Recoverable costs go through Section 20 consultation.

Checks, faults and when to replace

A check finds faults; the fault decides whether you repair or replace. Repairs keep the tested set intact. Replacement is needed when the set can no longer be brought back to its rating.

Common fire door faults and the usual fix
Fault found at the checkUsual fix
Closer missing, disconnected or too weakRefit or replace the closer, set it to close fully
Intumescent strips or smoke seals missing or painted overReplace the seals to the doorset's tested specification
Gaps too wide at the edgesAdjust if possible; often a sign the set needs replacing
Letterbox, spyhole or lock cut in on siteReplace with tested hardware, or replace the doorset
Leaf replaced but the old frame keptReplace as a certified doorset
Frame loose or the wall around it not fire-stoppedRe-fix and fire-stop, or replace the set

Where many doors in a block fail for the same reason, a whole-block replacement is often simpler for residents. It is planned once, tendered once and evidenced once. Our guide to fire compartmentation covers the fire stopping around door frames.

Period and mansion block doors

London's mansion blocks raise a harder question: how to keep panelled doors, fanlights and original ironmongery and still meet the rating. There are two routes, and the fire risk assessor decides which is acceptable for the building.

  1. Upgrade and evidence. Some period doors can be upgraded with seals, intumescent treatments and closers, with evidence for the performance. It depends on the door, the frame and the evidence available.
  2. Replace to match. A certified doorset made to match the period design: panels, mouldings, paint finish and ironmongery chosen to suit the hall.

Craftex started in 2016 as a carpentry and joinery company, and joinery is still a trade we run with our own people. At Herbert Crescent in Knightsbridge we refurbished a 450 m² prime home with bespoke joinery throughout.

Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

Pascal Hunt, Google reviewSee all reviews on Google

Replacing doors across a whole block

A block-wide programme works best run like any other contract, to a schedule and a date.

  1. Survey every door. Flat entrance, communal, riser and plant-room doors, each with its faults recorded.
  2. Build the door schedule. One line per door: rating, size, finish, hardware and whether it is repaired or replaced.
  3. Agree the specification. Certified doorsets, fitted to the manufacturer's tested instructions, with the fire stopping around each frame.
  4. Tell residents. Notices, booked install days and a plan so nobody is locked out.
  5. Hand over the records. A door register with photos and installation records, ready for the next check.

Work in occupied blocks is where we work. At Pan Peninsula in Canary Wharf we rebuilt a 290 sq m penthouse in 10 weeks with residents at home. The access, notices and booked visits are the same on a door programme.

Doors to replace across a block? Send us the fire risk assessment for a free door schedule and a programme. Already have a quote? Send it to us. We'll beat it.

  • The current fire risk assessment and any fire door survey
  • Regulation 10 records: 3-monthly communal checks and 12-monthly flat door checks
  • The lease: who owns and repairs the flat entrance doors
  • A door schedule: rating, size, finish and hardware for every door
  • Certified doorsets and the fire stopping around each frame
  • Resident notices and booked install days
  • A door register with photos at handover

Frequently asked questions

Do flats need fire doors?

Yes, at the flat entrance in a block where the door opens onto a corridor or stair used in common. Approved Document B gives a minimum of FD30S, or E 30 Sa, with a self-closing device. Doors inside a flat usually do not need self-closers.

What are the fire door regulations for flats?

In England, regulation 10 of the Fire Safety (England) Regulations 2022 applies to blocks with two or more flats. Residents must be told how to use fire doors every year. In blocks over 11 metres, communal fire doors are checked every 3 months and flat entrance doors, with best endeavours, every 12 months.

Who is responsible for a flat entrance fire door?

The building's responsible person must include it in the fire safety regime: the Fire Safety Order covers every door between a flat and the common parts. Who owns and pays for the door depends on the lease, so check whether it is demised to the leaseholder.

What does FD30S mean?

FD30 means the doorset held back fire for at least 30 minutes in the BS 476-22 test. The S means restricted smoke leakage at room temperature. The European equivalent is E 30 Sa. The rating belongs to the tested set of leaf, frame, seals and hardware, not the leaf alone.

Can a leaseholder change their own front door?

Only to a door that keeps the rating, and usually with the landlord's consent under the lease. A replacement leaf hung in an old frame, or a new letterbox cut on site, can break the tested set. Ask the managing agent before any change.

Can a period door in a mansion block be kept?

Sometimes, if it can be upgraded and evidenced to the required performance, or replaced with a certified doorset made to match. The fire risk assessor and the building's responsible person decide what is acceptable for that building.

Doors to replace across a whole block?

Send us the fire risk assessment, the door survey or just the address. We come back the same working day with a schedule and a programme.

WhatsApp us