Basement Conversion, Designed and Built
Pools, cinemas, gyms and wine rooms, dug and finished beneath prime London homes.
Craftex
100% of projects delivered aheadof programme and on budget
Prime London homes we have rebuilt
- 32 weeksto refurbish a 450 m² Knightsbridge house, with neighbours on every side
- 0snags or defects at the Kensington Olympia handover
- 60%of the labour on our sites is our own people
- £10Mpublic and employers' liability cover on every home we build
A whole new floor beneath the house
Craftex designs and builds basement conversions in London: new dig or existing cellar, with excavation, underpinning, waterproofing and the finished rooms under one contract. Our structural and party wall work starts with the survey, so the basement conversion is priced on what is under your house, not on a guess. For prime London homes and country houses, that new floor is often the pool, the cinema, the gym and the wine room the house never had room for, and a basement conversion in London is the one way to add it without touching the façade.
A basement adds the rooms a grand house runs out of: a swimming pool and spa, a cinema, a gym, a wine room, staff quarters and the plant to run them. We dig it, carry the house above it, keep it dry and finish it to the standard of your drawing room, with one team answering for all of it.
Cellar conversion or a new basement dig?
Three things decide the route: the head height you already have, the water in the ground and the houses on either side. A deep existing cellar can often be lowered and lined; a new basement under the whole footprint, or out under the garden, means excavation, underpinning and the party wall process, and it gives you the most space. See how we work as a design and build partner for homeowners.
Read more
Our project directors and site managers are our own people, and we appoint and coordinate the structural engineer and the party wall surveyors, so one team answers for the excavation, the new structure, the waterproofing and the joinery in the cinema. That matters most under an occupied house on a terraced street, where every week of digging is noticed next door.
Borough basement policies. The central London boroughs with the most basement applications limit them. Kensington and Chelsea's Local Plan policy and Basements SPD allow a single storey beneath the house and no more than half of each garden, with a construction traffic management plan and a construction method statement at application. Westminster and Camden apply similar limits on depth and garden area. Outside these boroughs, and on larger plots and country houses, a deeper dig can still be possible; the survey tells you which rules apply to your address.
Construction method statement. Most councils now ask how the basement will be built before they grant it: the sequence of underpinning, how the house above and the neighbours' walls are supported, how spoil leaves the site and how noise and traffic are controlled. The engineer and our site team write it together, so the method that wins consent is the one we use.
The Party Wall etc. Act 1996. Digging within three metres of a neighbour's building, and lower than its foundations, needs notice under section 6, usually one month before work starts; works to a shared wall need two months' notice under section 3. Each neighbour can appoint a surveyor, and the award sets out how their property is protected and monitored. Our guide to the Party Wall Act covers the timings.
Waterproofing to BS 8102. The British Standard sets three grades of protection; habitable rooms, cinemas and wine rooms need grade 3, a dry environment. That is often reached by combining two systems, such as a waterproof concrete structure with a cavity drain membrane and pumped drainage, with a maintenance plan written in.
Basement excavation and basement extension in London. A basement extension under the garden, a lowered cellar or a full basement excavation under the house are three variants of the same job, and each one changes the structure, the consent route and the programme.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What does our basement conversion service include?
Six parts of one basement, from the soil report to the last bottle in the wine room, under one contract and one programme. A basement swimming pool needs its own structure, a plant room, dehumidification and a tanked shell around the pool tank; a home cinema needs acoustic isolation from the house above; a wine room needs steady temperature and humidity. Each one is designed into the structure, not added later. For work on the floors above at the same time, see our luxury home renovation service.
Survey, soil and structural design
Trial pits, ground and water readings and the engineer's design, all before the price is fixed.
Excavation and underpinning
The dig run in sequence, with the house above and the neighbours' walls supported and monitored throughout.
Waterproofing and drainage
A grade 3 dry basement to BS 8102, with pumped drainage and a written maintenance plan.
Lightwells and glazing
Lightwells, walk-on rooflights and garden access that bring daylight down to the new floor.
Plant, ventilation and escape
Ventilation, pool plant, fire protection and the escape route designed in from the first drawing.
Pool, cinema, gym and wine room fit-out
The finished rooms, built by the trades who fit our prime interiors above ground.
How does a basement conversion run with us?
01
Survey
We walk the house and the garden, read the ground and the neighbours' walls, and tell you honestly what the site allows.
02
Design and agreed price
Layouts, structure and finishes drawn and priced by the team that will build them, then one figure and one programme.
03
Planning, method statement and party walls
The application, the construction method statement and every party wall notice and award, run by us.
04
Dig, structure and waterproofing
Underpinning, excavation, the new slab and walls, and the waterproofing, with the house monitored as we go.
05
Fit-out and handover
Pool, cinema, gym and wine room finished, systems tested, certificates filed and aftercare agreed.
The Craftex Guide to Residential Design and Build
Before a single trial pit is dug: how to set the brief, the budget and the programme for a major residential project, and the questions that tell a contractor who can deliver from one who cannot. Free to download.
Six promises, written into your contract
Each of these is written into the contract for your basement, not printed on a brochure.
-
One team above and below ground
The people who dig the basement also finish the rooms in it and, if you wish, the house above it.
-
Priced on the ground, not on a guess
The engineer's design and the soil report come before the figure, and the agreed figure then stands.
-
Your neighbours kept on side
Notices, awards, monitoring and working hours agreed before the dig.
At Herbert Crescent the works ran quietly beside the neighbours to handover.
-
A dry basement, in writing
Waterproofing designed to grade 3 of BS 8102, with the maintenance plan handed over with the keys.
-
Covered for your neighbours and insurer
Public and employers' liability on every site, professional indemnity on request, ISO and CHAS accreditation.
-
Finished, then looked after
Handover when every room works as drawn, with certificates filed and aftercare once you move in.
Already have a quote? Send it to us. We'll beat it.
Holding a basement contractor's price, or an engineer's scheme costed by someone else? Send it to us. We read it line by line and reply the same working day with a better figure for the same dig, the same structure and the same finish.
Where do basement projects run into trouble?
Six places a London basement slips, and what we do about each before the first spade goes in. Most of these rows share one cause: the dig, the engineering and the fit-out are split between three firms who each answer for a part. One team that owns all three closes those gaps before work starts.
| Area | Where it often slips | With Craftex |
|---|---|---|
| Groundwater | Water found mid-dig, the programme stops and the design changes | Ground and water readings taken at survey, and the design built around them |
| Party walls | Late notices, angry neighbours and a dispute that halts the dig | Notices served early, surveyors appointed and monitoring agreed before work |
| Spoil | Lorries, skips and a blocked street that brings the council round | Spoil route, conveyor and collection times agreed in the traffic plan |
| Waterproofing | A damp patch in the new cinema a year after handover | Two systems designed together to grade 3, with a maintenance plan |
| The house above | Cracks in the rooms above from movement during the dig | Underpinning in sequence, temporary works designed and movement monitored |
| Programme | A dig that runs a season over while the house stays unusable | Long-lead plant and glazing ordered at design, the date in the contract |
What sets the price of a basement conversion?
No two basements cost the same, because no two plots of London ground are the same. These are the six things that move the figure, and what we settle about each before we price.
| What moves the price | What we fix before pricing |
|---|---|
| New dig or existing cellar | Whether the cellar can be lowered or a new floor must be dug |
| Depth and footprint | Under the house only, or out under the garden, within the borough's limits |
| Ground and water | Soil type and water level from trial pits and readings |
| Underpinning | How much of the house and the party walls must be underpinned |
| Lightwells and access | Lightwells, rooflights, a new stair or a lift |
| Fit-out specification | Pool, cinema, gym or wine room, and the plant each one needs |
Planning, the construction method statement and party wall awards run alongside the design, so they stay off the critical path. For what drives the total on a whole house, read house renovation cost in London.
Free cost calculator
What will your basement conversion cost?
Enter the floor area of the new basement and choose the level of finish. You see an indicative build range at once, at our 2026 London rates, ex VAT.
Basement pools, cinemas and gyms in prime London
Pools and spas under Kensington, Chelsea, Knightsbridge and Belgravia. Stucco houses where a basement swimming pool, a steam room and a treatment room fit beneath the house within the borough's single-storey rule. The engineering is the hard part: a pool tank inside a dry box, under a listed or conservation-area façade.
Cinemas, gyms, wine rooms and staff quarters in Hampstead, Highgate and St John's Wood, and under country houses. Larger plots give room for a home cinema, a home gym with daylight from a lightwell, a temperature-controlled wine room and a self-contained flat for staff.
Read more
We take on basements across London, including Kensington, Chelsea, Knightsbridge, Belgravia, Mayfair, Notting Hill, Holland Park, Hampstead, Highgate, St John's Wood, Fulham and Wimbledon, and under country houses in the home counties by arrangement. A London basement conversion in a conservation area usually also needs the lightwells and any rooflights to sit quietly on the street; we draw them to the borough's design guidance. Whether you are comparing basement conversion companies in London or basement specialists, the question is the same: who answers for the structure, the water and the finish?
Prime London homes we have rebuilt
No basement case study is published yet; these are prime London structural and residential projects.
-
Herbert Crescent, Knightsbridge A £1.5M prime house of 450 m², refurbished end to end at a sensitive address and built quietly beside its neighbours. View case study
-
Kensington Olympia penthouse 400 sq m designed and refurbished in 12 weeks, with every other flat in the building occupied. View case study
-
Martin Hickey's earlier role: Covent Garden Strip-out and structural works behind retained façades, on one of the tightest sites in central London. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Basement conversions: your questions
Do I need planning permission for a basement?
For a new dig in London, usually yes. Kensington and Chelsea, Westminster and Camden all have basement policies that limit depth and garden coverage and ask for a construction method statement. Converting an existing cellar without changing the outside of the house often needs no application, but Building Regulations always apply. We check your address at the survey. See planning and building regulations drawings.
Can my cellar be converted without digging deeper?
Sometimes. If the cellar already has enough head height and the walls are sound, it can be waterproofed, lined, ventilated and finished as living space. If not, the floor is lowered and the walls underpinned, which is closer to a new dig.
How do you keep a basement dry?
By designing the waterproofing to grade 3 of BS 8102 for any habitable room, usually with two systems working together: a water-resisting structure and a cavity drain membrane with pumped drainage. The pumps are serviced on a plan we hand over.
How long does a basement conversion take?
It depends on the depth, the ground and the party wall awards, so we set the date after the survey and write it into the contract. Planning and party wall agreements come first and run alongside the design.
Can we stay in the house during the dig?
Often for part of the work, depending on the structural sequence, the access and how much noise you can live with. On a larger dig, many owners move out while the underpinning and excavation run, then return for the fit-out.
Who handles the party wall awards with the neighbours?
We do. We serve the notices, work with the surveyors each neighbour appoints, agree condition surveys and monitoring, and keep the neighbours informed throughout. Our guide to the Party Wall Act explains the process.
Can a basement have a lightwell or garden access?
Yes. Front and rear lightwells, walk-on glass rooflights and a stair or glazed doors to the garden all bring daylight down. In conservation areas they are drawn to the borough's guidance so they read quietly from the street.
What drives the cost of a basement?
The ground, the depth, the underpinning, the lightwells and the specification of the rooms. A pool or cinema adds structure and plant. Use the calculator above for the finished floor, and read house renovation cost in London for the wider budget. Get in touch and we will discuss your project.
Can you renovate the rest of the house at the same time?
Yes, and it is usually the better route: one programme, one set of certificates and one team on site. See our home renovation and refurbishment service.
Can you build a basement swimming pool?
Yes. A basement pool needs a structural tank inside a fully waterproofed box, a plant room, dehumidification and an access route for the plant. We design all of it with the engineer from the start, with the spa, steam room and changing rooms around it. Our indoor swimming pool construction page covers the pool, the plant and the spa.
Can you dig a double-depth or iceberg basement?
In Kensington and Chelsea, Westminster and Camden, new basements are now limited to one storey, so double-depth or iceberg schemes are rarely allowed there. On some larger plots, other boroughs and country houses, a deeper dig can be possible; we check the policy and the ground first.
How fast do you reply?
We reply the same working day. Send the address, a floor plan if you have one and a few photos of the house and garden, and one of our directors calls you back.
Read before you dig
From prime London houses we have rebuilt: consents, party walls and the money.
What our clients say
See all reviews on Google-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Tell us about the house
Send the address, any drawings you hold and photos of the garden and the street. We will come back to you the same working day.



























