The General Permitted Development Order Explained

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 9 min read

Victorian brick commercial buildings on a London street, the neighbouring one with a slate mansard storey added on the roof

The short answer

The General Permitted Development Order 2015 (GPDO) is the statutory instrument that grants planning permission nationally in England for set types of development. Its Schedule 2 sets out 20 Parts of rights, split into Classes with limits and conditions, and some Classes need the council's prior approval first.

  1. Part 3 covers changes of use, such as Class MA, which turns Class E buildings into homes after two years of continuous Class E use.
  2. Part 20 allows new storeys of homes on some buildings built between 1 July 1948 and 5 March 2018, and Class ZA allows demolish and rebuild.
  3. Part 11 Class B covers demolition, with a 28-day check on the method of demolition and the restoration of the site.
  4. An Article 4 direction can remove a right in a set area, so every address needs its own check.

The General Permitted Development Order grants planning permission for set types of development in England. Its full name is the Town and Country Planning (General Permitted Development) (England) Order 2015. Work that fits a Class, within its limits, needs no planning application. Some Classes still need the council's prior approval before work starts.

For developers, three parts of the Order matter most: changes of use, new storeys and demolition. This guide explains each one, then the conditions, Article 4 directions and the changes made from 2024 to 2026. We read every provision on legislation.gov.uk on 4 November 2026.

Own a building you hope to convert without a full planning application? We take buildings from the first check to finished homes, priced by our own build team. See how we run permitted development conversions from start to finish.

Want to know which right fits your building? Get a free route check. We reply the same working day.

What the General Permitted Development Order 2015 does

The Order was made on 18 March 2015 and came into force on 15 April 2015. The Secretary of State made it under the Town and Country Planning Act 1990. It is a statutory instrument, numbered S.I. 2015/596.

Article 3 is the engine. It grants planning permission for every class of development described in Schedule 2. That grant replaces the planning application, but it comes with rules that apply to every Class:

  1. Limits and conditions. Each permission is subject to the exceptions, limitations and conditions written into its Class.
  2. A lawful starting point. No right applies if the existing building or the existing use is unlawful.
  3. Old planning conditions. The Order permits nothing contrary to a condition on an earlier planning permission.
  4. Space standards. Since 6 April 2021, no new home may be under 37 square metres or fall short of the nationally described space standard.
  5. Demolition. The Order permits demolition of a building only through Part 11, Classes B and C.

The lawful starting point is where many schemes fail. A lawful development certificate proves the existing use, or confirms a proposed one, before you commit money to drawings.

Not sure of your building's lawful use? Send us the address, and we read the use before anything else.

The Parts and Classes that matter to developers

Schedule 2 holds 20 Parts, from minor operations to mining. Each Part is split into Classes, and each Class is a separate right with its own tests. The table shows the Parts a residential developer meets most often.

GPDO 2015 Schedule 2 Parts most used in residential development (England)
PartTitle in the OrderWhat it gives a developer
1Development within the curtilage of a dwellinghouseExtensions, lofts and outbuildings on houses
3Changes of useCommercial, agricultural and some other buildings into homes
7Non-domestic extensions, alterations etcLimited extensions and alterations to shops, commercial, industrial and warehouse premises
11Heritage and demolitionDemolition of a building, with a prior approval check
20Construction of new dwellinghousesNew storeys on existing buildings, and demolish and rebuild

Part 1 is the householder Part. It covers what a homeowner can add to a house without an application. Our guide to permitted development rights in London sets out those rules in full.

The rest of this guide covers Parts 3, 20 and 11. These are the rights that turn one building into several homes.

Part 3: changes of use between use classes

Part 3 lets a building move from one use class to another without a planning application. Each Class names the use you start from and the use you end with.

Part 3 Classes most used to create homes (GPDO 2015, Schedule 2, Part 3)
ClassFromToCouncil fee (V2026.1)
GClass E buildingClass E plus up to two flats£249
MLaunderette, betting office, pay day loan shop or hot food takeawayHomes, up to 150 m²£249; £536 with building operations
MAClass E buildingHomes£260 for each home
NAmusement arcade or casinoHomes, up to 150 m²£249; £536 with building operations
QAgricultural buildingHomes£249; £536 with building operations

Class MA is the right most developers ask about. The building must have been in Class E use for a continuous period of at least two years. Listed buildings, National Parks and some other protected areas are excluded. Our guide to commercial to residential under Class MA works through the tests in detail.

Several old Classes have gone. Classes B to F, J, JA and K were removed on 1 August 2021, after the use classes were rewritten. Which class your building sits in decides which right applies, so start with use classes explained.

We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

Apartify Estates, Google reviewSee all reviews on Google

Part 20: new storeys and Class ZA rebuilds

Part 20 creates new homes in or on existing buildings. Its Classes are named by the building they apply to:

  1. Class A. New homes on a detached block of flats.
  2. Class AA. New homes on a detached building in commercial or mixed use.
  3. Class AB. New homes on a terrace building in commercial or mixed use.
  4. Class AC. New homes on a terrace building used as houses.
  5. Class AD. New homes on a detached building used as a house.

Classes A, AA, AC and AD allow up to two additional storeys. The building must have been built between 1 July 1948 and 5 March 2018. Each Class works through a prior approval application to the council.

The council fee is per home. For fewer than 10 homes it is £441 each; between 10 and 50 it is £476 each.

Class ZA is different. It allows a building to be demolished and replaced by homes. The old building must be a detached office, research and development or light industrial building, or a purpose-built detached block of flats.

Part 20 schemes are housebuilding on top of, or in place of, an existing building. Our Development Director, Rob Barton, previously delivered 3,985 homes as a housebuilding managing director. Send us the building, and we tell you which Part 20 Class it could meet.

Part 11: demolition under Class B

Part 11 Class B permits "any building operation consisting of the demolition of a building". The right has firm exclusions. It does not apply where:

  1. Neglect made it unsafe. Someone with an interest in the land caused the danger, and repair or temporary support is practicable.
  2. Conservation area. The demolition of an unlisted building in a conservation area needs planning permission instead.
  3. Pubs. The building is, or was last, a drinking establishment, with or without expanded food.
  4. Venues. The building is, or was last, a concert hall, a live music venue or a theatre.
  5. Monuments. A statue, memorial or monument has stood for at least 10 years, subject to listed exceptions.

Where Class B applies, you first ask the council whether its prior approval is needed. The question covers only the method of demolition and any restoration of the site. Our guide to prior approval for demolition covers the steps.

You must display a site notice for at least 21 days within the 28 days after you apply. Work may start when the council says approval is not needed, when it gives approval, or after 28 days with no decision.

Planning to clear a site? Check the exclusions against the building's last use and its location before you instruct a demolition contractor.

Conditions, limits and prior approval

Prior approval is not a planning application. The Order has already granted the principle. The council checks only the matters the Class lists, and nothing else.

For Class MA the matters are set out in paragraph MA.2(2):

  1. Transport. Transport impacts of the development.
  2. Contamination and flooding. Contamination risks on the site, and flooding risks.
  3. Noise. Noise from commercial premises on the people who will live there.
  4. Natural light. Adequate natural light in every habitable room.
  5. Location. Ground floors in conservation areas, industrial areas, and the loss of registered nurseries and health centres.
  6. Fire safety. Fire safety, for buildings that meet the height test in the Order.

The council has 56 days to decide a Part 3 application. If it notifies no decision in that time, the development may begin. Missing information is a ground for refusal, so the reports go in complete.

Approval also starts a clock. Class MA homes must be completed within three years of the prior approval date. That is why we fix the build programme before the application is lodged.

Every new home must meet the space standard too, whatever the Class. A scheme that passes the prior approval matters can still fail on room sizes. Test every flat layout against the standard before the application goes in.

Article 4 directions: when a right is removed

Article 4 of the Order lets a council, or the Secretary of State, switch a right off. It can do so where it is satisfied that development should need a planning application instead. A direction can cover a whole Part or Class across an area, or one named development.

London councils use this power widely. The City of London has removed Class MA for offices across all its land since 1 August 2022. On 2 November 2026 we verified Class MA directions in 15 London boroughs. Newham and Tower Hamlets each have one against small HMOs.

A direction does not always stop a scheme already under way. Article 4(2)(a) protects development needing prior approval where the prior approval date came before the direction took effect. The work must still be completed within three years of that date.

Some rights cannot be removed this way, such as the new Part 7 Class CA for reverse vending machines. The live maps change, so we read them for every address. Our guide to Article 4 directions in London lists the boroughs and what each direction covers.

GPDO amendments from 2024 to 2026

The Order is amended often. The table lists the changes made from 2024 to 2026 that touch development in England. We read each instrument on legislation.gov.uk on 4 November 2026.

Amendments to the GPDO 2015 from 2024 to 2026 (checked 4 November 2026)
InstrumentIn forceWhat changed
S.I. 2024/1415 March 2024Class MA: three-month vacancy test and floor space cap removed
S.I. 2024/57921 May 2024Class Q replaced, with wider rights for agricultural buildings to homes; Class R widened
S.I. 2026/2027 January 2026Class MA: Building Safety Regulator replaces the Health and Safety Executive
S.I. 2026/3139 April 2026Reverse vending machines added; rooftop limit for Part 7 Class M; references to the latest NPPF
S.I. 2026/105621 October 2026Wider electric vehicle charging rights; Part 20 now names the Building Safety Regulator

For developers, the 2024 Class MA change matters most. A building with two years of Class E use no longer needs to be vacant first. Large office and retail buildings are no longer capped by floor space.

The 2026 Orders mostly changed references. Paragraph W of Part 3 and the Part 20 procedure now point to the latest NPPF, not the July 2021 version.

Council fees sit in separate regulations. Rises to £323 for Class MA and £597 per home under Part 20 are proposed from 8 December 2026. The draft regulations had not been made on 4 November 2026.

A change can land between your purchase and your application. We check the current text for every scheme. Want to know where your building stands today? Get a free route check.

Class ZA tests for the old and the new building

  • Built on or before 31 December 1989
  • Vacant for at least six months before the application
  • Footprint of no more than 1,000 square metres
  • No more than 18 metres high
  • New building within the old footprint
  • New building no more than 7 metres higher than the old one, and no more than 18 metres

Frequently asked questions

Is the GPDO a form of planning permission?

Yes. Article 3 of the Order grants planning permission for the development described in Schedule 2, so you make no planning application. The permission still carries the Class limits and conditions, and some Classes need prior approval. Building Regulations and other consents apply as normal.

Does the 2015 Order apply in Wales or Scotland?

No. As its full title says, it is the General Permitted Development (England) Order. Wales and Scotland set their own permitted development rules, so a scheme there needs checking against the rules for that nation.

Can a condition on an old permission remove permitted development rights?

Yes. Article 3(4) says nothing in the Order permits development contrary to a condition on a planning permission. A condition that limits the use, or removes named rights, beats the GPDO. Read every permission on the site's history before you rely on a Class.

Do flats created under permitted development have to meet space standards?

Yes. Since 6 April 2021, no new home under any Class may be smaller than 37 square metres of gross internal floor area. Each home must also comply with the nationally described space standard.

What if an Article 4 direction comes in halfway through a scheme?

Your scheme can usually continue. Article 4(2)(a) protects development that needs prior approval where the prior approval date falls before the direction comes into force. The work must then be completed within three years of that date.

Can the council say no to prior approval?

Yes, on the matters the Class lists, such as flooding, noise or natural light under Class MA. Missing information is also a ground for refusal. The council cannot reopen the principle of the change, because the Order has already granted it.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Turn a permitted development right into finished homes

Send us the building and your plan for it. We check the right, the prior approval matters and the build cost, and reply the same working day.

WhatsApp us