Skip to content
Request a callbackCallback

For owners, buyers and developers changing how a building is used

Use Classes Explained: The Use Class Order

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 9 min read

Red-brick London street with shopfronts at ground level and flats on the floors above

The short answer

The Use Classes Order 1987 sorts buildings in England into classes of similar use, such as Class E for shops and C3 for homes. A move within the same class is not development, while a move to another class usually needs planning permission or a permitted development right.

  1. The Order was rewritten on 1 September 2020: Classes A1 to A5, B1, D1 and D2 went, and Classes E, F1 and F2 arrived.
  2. B2, B8 and C1 to C4 stayed. Pubs, takeaways, cinemas and large HMOs are sui generis, in no class at all.
  3. Part 3 of the General Permitted Development Order allows some changes between classes, such as Class E to homes under Class MA.
  4. A lawful development certificate proves the use you have, or the use you propose, is lawful.

The use class order, formally the Town and Country Planning (Use Classes) Order 1987, sorts buildings and land in England into classes of similar use. A move within one class is not development. A move between classes usually needs planning permission or a permitted development right.

The Order was rewritten on 1 September 2020. Classes A1 to A5, B1, D1 and D2 went, and Classes E, F1 and F2 arrived. This guide covers England. It sets out every class in force, what changed, and how to prove the use you have.

We take buildings from the route check to finished homes, priced by our own build team. At Allitsen Road in St John's Wood, we mapped a derelict members' club's route to flats. The wider process is on our change of use page.

Own or buying a building and want to know what it can become? Get a free route check.

Full use class order table, from B2 to sui generis

Every lawful use of a building in England sits in a use class, or is sui generis. The table below lists each class in force today. We read Schedule 1 of the Order on legislation.gov.uk on 4 November 2026. The Class E and F wording comes from the Planning Portal's use classes page.

Use classes in England under the Use Classes Order 1987, as amended from 1 September 2020
ClassNameWhat it covers
B2General industrialIndustrial processes other than those in Class E(g)
B8Storage or distributionStorage or a distribution centre, including open-air storage
C1HotelsHotels, boarding and guest houses with no significant element of care
C2Residential institutionsResidential care, hospitals, nursing homes, residential schools, colleges and training centres
C2ASecure residential institutionsPrisons, young offenders institutions, detention centres, secure hospitals and military barracks
C3DwellinghousesA home for one household, or up to six residents living as one household
C4Houses in multiple occupationA house shared by up to six residents as an HMO
ECommercial, business and serviceShops, cafes, restaurants, offices, gyms, clinics, nurseries, research and light industry
F1Learning and non-residential institutionsEducation, galleries, museums, libraries, public halls, places of worship, law courts
F2Local communitySmall essential-goods shops, community halls, outdoor sport, swimming pools, skating rinks
Sui generisIn a class of its ownPubs, hot food takeaways, theatres, nightclubs, cinemas, hostels and large HMOs, among others

Two sets of letters you may still see, A1 to A5 and B1, are gone in England. The 2020 section below maps each one to its new class.

Uses that fit no class are sui generis, and each is judged on its own facts. Our guide to the sui generis use class lists every one of them.

Class B2 and B8: industry, storage and distribution

Class B2 is general industrial. The Planning Portal describes it as "use for industrial process other than one falling within class E(g)". It excludes incineration, chemical treatment, landfill and hazardous waste.

The line between B2 and Class E(g) is the neighbours. E(g) covers uses that can be carried out in a residential area without harm to its amenity. A process that cannot meet that test is B2.

Class B8 is "use for storage or as a distribution centre". The Planning Portal adds that the class includes open-air storage. Warehouses and yards used to store and move goods sit here.

Classes B3 to B7 were removed from the Order in the 1990s. So B2 and B8 are the only B classes left in England.

Class C1 hotels and C2 residential institutions

Class C1 is "use as a hotel or as a boarding or guest house where, in each case, no significant element of care is provided". A hostel is not C1. It is listed as sui generis in article 3(6) of the Order.

Class C2 covers three groups:

  1. Care homes. Residential accommodation and care for people in need of care, other than a use in Class C3.
  2. Hospitals and nursing homes. Named in the class as a separate line.
  3. Residential education. Residential schools, colleges and training centres.

Class C2A is for secure residential institutions, from prisons and detention centres to secure hospitals and military barracks.

Turning a hotel or care home into flats moves it from C1 or C2 into C3. That is a change between classes. Expect a planning application unless a permitted development right covers it.

Buying one to convert? Confirm its lawful use and planning history before you exchange.

We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

Apartify Estates, Google reviewSee all reviews on Google

Class C3 dwellinghouses and C4 small HMOs

Class C3 is use as a dwellinghouse, whether or not it is anyone's sole or main residence. It has three parts:

  1. C3(a): a single person, or people forming a single household as defined in the Housing Act 2004.
  2. C3(b): up to six residents who form one household, where care is provided for them.
  3. C3(c): up to six residents sharing a home as one household, with no care provided, other than C4 uses.

Class C4 is a house in multiple occupation for up to six residents. The Planning Portal describes it as a small shared house of three to six unrelated people, as their only or main home.

Above six residents, an HMO leaves C4 and becomes sui generis. Our guide what is an HMO explains the legal definition. The London policy tests are in our guide to HMO planning permission.

Planning is only one consent. A mandatory HMO licence applies from five people in two or more households, whatever the use class.

Class E, F1 and F2 since 2020

Class E is the Commercial, Business and Service class. Shops, cafes and restaurants, financial and professional services, indoor sport, clinics, nurseries, offices, research and light industry share it. Our guide to Class E use class explained covers the sub-classes, their limits and the conditions that can switch the freedom off.

Class F1 is for learning and non-residential institutions, with no residential use. It has seven parts:

  • Provision of education.
  • Display of works of art, otherwise than for sale or hire.
  • Museums.
  • Public libraries or public reading rooms.
  • Public halls or exhibition halls.
  • Public worship or religious instruction.
  • Law courts.

Class F2 is for the local community. It has four parts:

  1. Small essential shops. Shops mostly selling essential goods, including food, of no more than 280 square metres, with no similar shop within 1,000 metres.
  2. Community halls. Halls or meeting places mainly used by the local community.
  3. Outdoor sport. Areas for outdoor sport or recreation, without motor vehicles or firearms.
  4. Pools and rinks. Indoor or outdoor swimming pools and skating rinks.

Check which class and sub-class your unit was granted before you plan a change.

What changed on 1 September 2020: A1 to A5, B1, D1 and D2

On 1 September 2020, England revoked Part A, Class B1 and Part D of the Order. Their uses moved into the new Classes E, F1 and F2, or became sui generis.

Where the old use classes went on 1 September 2020 (England)
Old classWhat it coveredClass from 1 September 2020
A1Shops and retailE(a); small essential-goods shops F2(a)
A2Financial and professional servicesE(c)
A3Restaurants and cafesE(b)
A4Pubs and drinking establishmentsSui generis
A5Hot food takeawaysSui generis
B1Offices, research and light industryE(g)
D1Non-residential institutionsClinics and nurseries E(e) and E(f); the rest F1
D2Assembly and leisureIndoor sport E(d); outdoor sport, pools and rinks F2; cinemas, concert, bingo and dance halls sui generis

The change matters most for retail. A shop, a cafe and an office used to sit in three classes. Now they share Class E, so one can usually become another without an application.

Pubs went the other way. As Class A4 they had a class; now they have none.

The Planning Portal says applications are generally decided on the classes in force when they were submitted. Some laws still refer to the classes as they stood on a set date. Permitted development followed on 1 August 2021, when Part 3 Classes B to F, J, JA and K were removed.

Holding a permission granted before 2020? It will name the old classes, so map them with the table above.

Moving within a use class

Section 55(1) of the Town and Country Planning Act 1990 makes "any material change in the use" of a building development. Section 57(1) says development needs planning permission.

Section 55(2)(f) carves out the use class order. Use for "any other purpose of the same class" is not development. So a shop can become an office, or a cafe a gym, without an application, because all sit in Class E.

The freedom has limits:

  1. Planning conditions. A permission can limit the use to one part of a class, for example "office use only".
  2. Section 106 agreements. An obligation can restrict uses too, and it runs with the land.
  3. Physical works. A new shopfront or external plant may still need its own permission.
  4. Other consents. Building Regulations and licensing still apply to the new use.

Read every planning permission on the site before you rely on the class. Sui generis uses get no help from this rule, because they have no class.

Permitted development changes between classes

Some changes between classes need no planning application. Part 3 of Schedule 2 to the General Permitted Development Order 2015 (GPDO) grants them as permitted development, each with its own limits.

Main permitted changes of use between classes (GPDO 2015, Schedule 2, Part 3)
ClassFromToKey limits
ACasino, betting office, pay day loan shop or hot food takeawayClass ESet out in the class
AAPubPub with expanded food, and backPubs only
GClass E buildingClass E plus up to two flatsSet out in the class
HThat mixed useBack to Class ESet out in the class
LC3 houseC4 small HMO, and backNot if two or more homes result
MAClass EC3 homesPrior approval; 2 years' continuous Class E use
NAmusement arcade or casinoC3 homesPrior approval; 150 m² cap

Class MA is the route most owners ask about. The building must have been in Class E use for a continuous period of at least two years. Listed buildings and some protected areas, such as National Parks, are excluded.

Prior approval is not a full application. The council checks set matters, such as transport, flooding, noise and natural light. If it does not decide within 56 days, the development may begin. The council fee is £260 per new home.

An Article 4 direction can remove a right in the area the council specifies. Our permitted development and prior approval service checks the right first. For the Class MA detail, read commercial to residential permitted development.

Prove the existing use with a lawful development certificate

Every route starts from the lawful use you have today. A lawful development certificate proves it to the council, a buyer or a lender.

There are two kinds:

  1. Existing use (section 191). Confirms a use already carried on is lawful.
  2. Proposed use (section 192). Confirms a use you plan would be lawful if begun now.

In England, enforcement action is generally time-barred ten years after a breach. Since 25 April 2024, that ten-year limit also covers building works and a change of use to a single home.

The burden of proof is on you, on the balance of probability. Government guidance asks you to describe the actual use precisely, not just the use class.

Council fees for use class applications in England (Planning Portal fee guide V2026.1, from 1 April 2026)
ApplicationCouncil fee
Other changes of use of a building or land£610
Class MA prior approval, Class E to homes£260 per home
Lawful development certificate, existing useSame as the full application fee
Lawful development certificate, proposed useHalf the full application fee

Rises to £732 and £323 are proposed from 8 December 2026. The draft regulations had not been made on 4 November 2026. Councils must decide a certificate within 8 weeks, unless you agree longer in writing.

We obtain one before Class MA whenever the two-year Class E history is in doubt. Our guide to the lawful development certificate covers the evidence in depth. Not sure what your building is? Get a free route check.

Evidence for an existing-use certificate

  • Dated photographs of the building and its use over the years
  • Leases, tenancy agreements and rent records
  • Council tax or business rates records
  • Utility bills, invoices and insurance schedules for the premises
  • Statutory declarations from people who know the history

Frequently asked questions

What is a C2 use class?

C2 is the class for residential institutions. It covers homes that provide accommodation and care to people in need of care, hospitals, nursing homes, and residential schools, colleges and training centres. Prisons and other secure accommodation sit in a separate class, C2A.

Is a hotel C1 or sui generis?

A hotel is C1, as are boarding and guest houses where no significant element of care is provided. A hostel is not. Hostels are listed as sui generis in article 3(6)(i) of the Order.

What happened to Class B1?

It was revoked in England on 1 September 2020. Offices, research and development, and industrial processes that suit a residential area now sit in Class E(g). B2 and B8 were kept.

Is every shop in Class E?

Most are, under E(a). The exception is a small shop selling mostly essential goods, including food, of no more than 280 square metres, with no similar shop within 1,000 metres. That shop is F2(a).

Which use class is a pub?

None. Pubs, wine bars and drinking establishments have been sui generis since 1 September 2020. Before that they were Class A4. A pub can switch to a pub with expanded food, and back, under Class AA.

Do I need planning permission to turn a house into a small HMO?

Usually not. Class L permitted development allows a C3 house to become a C4 HMO for up to six residents, and back. An Article 4 direction can remove that right, and a mandatory HMO licence applies from five people in two or more households.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Find the route from the use you have to the use you want

Send us the building and what you want it to become. We check the use class, the planning route and the build cost, and give you a free first view.

WhatsApp us