For landlords and investors buying HMO stock in London
HMO Article 4 Directions in London: Which Boroughs Need Planning Permission for a Small HMO
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 8 min read
The short answer
An HMO Article 4 direction removes the permitted development right (Class L) to turn a house into a small HMO for three to six people, so the change needs planning permission. On 2 November 2026 we verified directions in force in 17 boroughs borough-wide, in Havering for most house types and in four more by ward or street.
- Borough-wide: Barking and Dagenham, Barnet, Bexley, Brent, Bromley, Croydon, Ealing, Greenwich, Harrow, Hillingdon, Hounslow, Lewisham, Newham, Redbridge, Sutton, Tower Hamlets, Waltham Forest, and Havering for flats, terraces and semis.
- Ward-level: Haringey, Lambeth, Merton and Southwark. Proposed: Hammersmith and Fulham, a borough-wide Havering direction.
- A direction does not ban HMOs. It puts the change in front of the council, which tests amenity, concentration, parking and room sizes.
An HMO Article 4 direction is a council order that removes the permitted development right to turn a house into a small HMO. Where one is in force, a house for three to six sharers needs planning permission before the first tenant moves in.
On 2 November 2026 we checked every direction we could find on London councils' own pages. Seventeen boroughs are covered borough-wide, and Havering for flats, terraces and semis. Four more cover named wards or streets, and two have directions proposed.
This guide is for the investor checking a house before they buy it. It lists the boroughs with the date each direction took effect. It also shows how to check one address, what happens if you convert anyway, and what the council tests on a full application.
We check the route and build the conversion. For a house caught by a direction, the planning for a change of use is the first thing we confirm. Found a house and want to know before you exchange? Send us the address and we come back on the Article 4 position the same working day.
What an HMO Article 4 direction removes
Planning counts the people in a house. A family home sits in Class C3. A small HMO, Class C4, is a dwellinghouse shared by not more than six residents as a house in multiple occupation. A house for seven or more is outside Class C4 and needs planning permission everywhere.
Class L of the General Permitted Development Order lets a house change between C3 and C4 with no application. That is the right an HMO Article 4 direction takes away. Article 4 lets a council withdraw a named permitted development right over a named area.
| Change | Without a direction | With a direction |
|---|---|---|
| House (C3) to small HMO (C4), 3 to 6 people | Permitted by Class L | Planning permission needed |
| Small HMO (C4) back to a house (C3) | Permitted by Class L | Usually still permitted, unless the direction names Class L(a) too |
| HMO for 7 or more people | Planning permission needed | Planning permission needed |
| HMO licence from the housing team | Separate regime | Separate regime, still needed |
Two things stay the same. Licensing is a housing matter, not a planning one. GOV.UK says a mandatory licence applies to a large HMO rented to 5 or more people from more than one household. Some councils license smaller ones too.
National policy limits directions to cases that protect local amenity or wellbeing. It names an over-concentration of small HMOs as an example.
London boroughs with an HMO Article 4 direction
The table below lists only directions we verified on the council's own notice or page, or its row in the national register. All were checked on 2 November 2026. Boroughs not listed are not clear. Some we could not verify that day, and some have no HMO direction on their page. Always read the live map for the address.
| Borough | Area covered | In force since |
|---|---|---|
| Barking and Dagenham | Whole borough | 14 May 2012 |
| Barnet | Whole borough | 29 May 2016 |
| Bexley | Whole borough | 24 September 2017 |
| Brent | Whole borough except the OPDC area, Church End site allocations and the other seven Growth Areas | 1 November 2022 |
| Bromley | Biggin Hill and Darwin wards; all other wards | 28 February 2022; 1 September 2022 |
| Croydon | Whole borough, houses and flats | 28 January 2020 |
| Ealing | Perivale ward; rest of the borough except the OPDC area | 30 October 2024; 14 November 2025 |
| Greenwich | Whole borough | 27 September 2018 |
| Haringey | 14 eastern wards, from Bounds Green to Woodside | 30 November 2013 |
| Harrow | Whole borough, confirmed 14 October 2026 | 12 June 2026 |
| Havering | Any dwelling in Brooklands, Romford Town, Heaton and Gooshays; flats, terraces and semis elsewhere | 13 July 2016 |
| Hillingdon | Whole borough, decided 27 November 2025 (previously Brunel and Uxbridge South) | In force, date not stated on the council page |
| Hounslow | Whole borough except open land, industrial areas, two business parks and Mogden | 4 September 2023 |
| Lambeth | Streatham Common and Vale, Streatham St Leonard's wards | 11 August 2025 |
| Lewisham | Bellingham, Downham, Grove Park, Whitefoot; rest of the borough | 7 March 2020; 19 January 2024 |
| Merton | 7 wards from Colliers Wood to Pollards Hill; the other 13 wards (immediate, confirmation not yet stated) | 17 November 2022; 24 March 2026 |
| Newham | Whole borough except the London Legacy Development Corporation area | 31 July 2013 |
| Redbridge | Whole borough | 6 December 2019 |
| Southwark | Henshaw Street SE17 and Bywater Place SE16 only | Two street directions |
| Sutton | Whole borough, confirmed 26 November 2024 | 2025 |
| Tower Hamlets | Whole borough | 1 January 2021 |
| Waltham Forest | Whole borough | 16 September 2014 |
Two more are on the way. Hammersmith and Fulham's Cabinet agreed on 9 February 2026 to make a non-immediate direction, with the area still to be set by an evidence study. Havering consulted until 16 October 2026 on a borough-wide direction that would take effect a year after it is made.
Hackney's Article 4 page lists no HMO direction. Enfield's pages would not load for us on the day, so Enfield is not in the table: ask the council. We did not check Camden, the City, Islington, Kensington and Chelsea, Kingston, Richmond, Wandsworth or Westminster.
The pattern matters for a buyer. Outer east and south London went first, from 2012. The west and north followed in 2024 to 2026, and the last gaps are closing. A house that was a permitted conversion in 2023 may not be one today.
Caught by a direction and the numbers still work? The route is a change of use application, priced with the conversion by the team that builds it.
How to check a specific address
No single map is complete. The national register on planning.data.gov.uk warns that its data may be incomplete. Use four checks, in this order.
- The national dataset. Search the Article 4 direction area dataset on planning.data.gov.uk for the address. Treat it as the first look, not the answer.
- The council's Article 4 page and map. Every borough in the table publishes a page, and most an interactive map. Note the date the direction took effect.
- The direction document. It names the classes removed and shows the area on a plan. Read the schedule: some name Class L(b) only, Bromley names L(a) and L(b).
- The consultation list. A non-immediate direction is advertised at least 21 days before confirmation and takes effect 28 days to 2 years later. An immediate one takes effect on notice and lapses after 6 months unless confirmed. Ask what is proposed.
Then look at the house itself. A direction does not undo a use that began lawfully before it. If the seller says the house was already an HMO, ask for tenancy agreements, council tax records and any licence. A certificate of lawfulness turns that history into a document a lender will accept.
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
What happens if you convert anyway
The council can serve an enforcement notice requiring the HMO use to stop. Ignoring a notice is a criminal offence. The court sets the fine with regard to any financial benefit you gained from the breach, so the rent counts against you.
A change of use becomes immune from enforcement only after ten years of continuous breach. For a house let room by room, that means ten years of evidence, through every void and every change of tenant. Few investors want to carry that risk, and a lender will not.
An HMO licence does not help here. The housing team can grant a licence for a house that has no planning permission, and the planning team can still enforce. The two regimes do not talk to each other on your behalf.
Compensation is narrow. It is payable only if the council later refuses permission for development that was otherwise permitted. The claim must be made within 12 months of the direction taking effect. Where the council gave at least 12 months' notice, the statute rules it out. That is why nearly every London direction is non-immediate.
The full application after Article 4: what the officer tests
Once a direction applies, the council judges a small HMO against its local plan. The tests differ by borough, but the same five come up in London. Check each against the house before you offer.
- Amenity of neighbours. Noise, comings and goings, bin storage and the loss of a garden to bike sheds. A mid-terrace with a shared side return is harder than an end of terrace.
- Concentration. Many boroughs cap the share of HMOs within a set radius or on a street. Count the HMOs around the house before you apply; the officer will.
- Parking and cycles. Outer boroughs test car parking against the local standard. Inner boroughs expect secure cycle storage and often a car-free condition.
- Room sizes and shared space. Councils publish HMO standards for bedrooms, kitchens and bathrooms. A box room that passes licensing may still fail planning.
- Loss of family housing. Some boroughs protect family-sized homes. A four-bedroom house may face a harder test than a two-bedroom one.
The application is a full planning application, with a fee. Our guide to planning application fees covers it. If the house is better as flats, that is a different route, set out in converting a house into flats.
Before you buy: the HMO Article 4 check
Do the check before you exchange, not after. A direction changes the deal from a permitted conversion to a planning application with a refusal risk, and the price should follow.
Work through the list below with the agent and the seller. If a line is blank, ask again. If two lines are blank, send us the address. We check the Article 4 position, the planning history and the route, and reply the same working day. Then we price the application and the conversion as one job.
The build itself runs under our HMO conversion service.
- The exact address and its title plan
- The borough's Article 4 page and map, checked on the day
- The direction document: classes removed, area and date in force
- Any direction proposed but not yet confirmed
- The current use and the evidence it was lawful before the direction
- A lawful development certificate, if you are buying an existing HMO
- The council's HMO standards and concentration policy
- A priced scheme for the route that remains