House Extension Cost in London: What Drives It

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 4 min read

Open kitchen and family room under a roof lantern, with a stone-topped island and glazed doors to a courtyard

The short answer

A house extension in London costs about £1,835 to £2,160 per m² for a glazed rear or garden extension and up to £2,880 per m² for an orangery or double storey with Craftex (our indicative 2026 rates, ex VAT and fees). A 30 m² kitchen extension comes to roughly £64,000 to £76,000.

  1. Glazing, steels and foundations move the price more than the floor area alone.
  2. A kitchen extension adds the kitchen itself, which can cost as much as the room around it.
  3. Rear extensions within set depths can be permitted development; much of central London needs planning.
  4. Add VAT, design and engineering fees, party wall costs and a contingency of 5% to 10%.

A house extension cost in London is set by five things. They are the size, the glazing, the structure, the kitchen inside it and the ground under it. The Home Owners Alliance, citing Checkatrade, gives around £1,800 to £3,000 per m² for an extension.

On a prime London house, a large glazed garden or kitchen extension often sits at the top of that range or above it. This guide explains why, type by type, and what else belongs in the budget.

Comparing house extension builders in London? We design, get the consents for and build large glazed extensions as one team. Discuss your project and we will look at the house with you.

Rear, side-return and wraparound extensions

The shape of the extension decides how much structure it needs. Each type below adds walls, steels or roof compared with the one before.

Types of house extension, from simplest to most structural
TypeWhat it addsWhere it suits
Single-storey rearA new room across the back of the houseMost houses with a garden
Side-returnThe narrow passage beside a period house is built inVictorian and Edwardian houses
WraparoundRear and side-return together, in an LOpening the whole ground floor
Two-storey rearA new room on each floorDetached and larger semi-detached houses
Garden room or orangeryA glazed pavilion off the houseLarger gardens and country houses

A two-storey extension costs more in total but often less per square metre, because two floors share one set of foundations and one roof. HOA quotes two-storey work from about £1,900 per m² for a standard finish.

Kitchen extensions

Most London extensions are kitchen extensions. They carry two budgets: the room and the kitchen inside it.

  1. The room. Foundations, walls, steels, roof, glazing and the floor.
  2. The kitchen. Units, stone, appliances and lighting, priced separately.
  3. The services. Drainage for the sink and dishwasher, extract, heating and new electrical circuits.

On a prime house the kitchen can rival the cost of the room around it. Choose it before the extension is priced, so the structure, drainage and power are designed for it rather than altered later.

Planning, permitted development and party walls

A rear extension within set depths can be built under permitted development, which saves an application but not the rules.

  1. Single storey at the rear. Up to 3 metres on an attached house or 4 metres on a detached house, and no more than 4 metres high.
  2. Larger rear extensions. Up to 6 or 8 metres through the prior approval process, outside protected areas.
  3. Side extensions. Single storey only, no more than 4 metres high and half the width of the house.
  4. Protected areas and flats. Conservation areas tighten the rules, and flats have no householder permitted development.

Beyond those limits, a householder planning application costs £548 in England since 1 April 2026. Our guide to permitted development extension rules covers the detail.

Most London extensions touch a party wall or dig near a neighbour's foundations. The Party Wall etc. Act needs notice at least two months before work to a shared wall, and one month before nearby excavation.

What drives the cost of a house extension

Once the type is chosen, these decide where in the range your extension lands.

  1. Glazing. Large sliding doors, frameless corners and roof lanterns cost more than walls.
  2. Steels. Opening the back of the house into the extension needs beams and often a steel frame.
  3. Foundations. Clay, trees and drains near the new walls can call for deeper or piled foundations.
  4. Roof. A flat roof with a lantern, a pitched roof or a green roof each price differently.
  5. Heating and floor. Underfloor heating and a continuous stone or timber floor into the house.
  6. Access. Through-house access, a crane over the roof, or a garden reached only by a passage.
Our indicative 2026 rates per m² of new floor, construction only, ex VAT and fees: your fixed price comes after a survey and drawings.
Extension£ per m²30 m² extension
Glazed rear or garden extension£1,835 to £2,160£55,000 to £65,000
Kitchen extension and remodel£2,140 to £2,520£64,000 to £76,000
Orangery or double storey£2,450 to £2,880£73,000 to £86,000

Our build cost calculator gives a first indication. Add VAT at 20%, design and engineering fees, party wall surveyors and a contingency of 5% to 10% of the construction cost.

Extending during a whole-house renovation

On a prime house the extension is often one part of a bigger project. Building it during a renovation shares the scaffold, the consents and the programme.

The heating, the electrics and the kitchen are designed once for the whole ground floor. The new floor runs through without a join. Our guide to house renovation cost in London explains the rest of the budget.

If you are also adding a top floor, our guide to loft conversion cost in London covers that side. For design fees, read our guide to the architect for a house extension.

This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations. The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner. I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

Наталия Цимбалюк, Google reviewSee all reviews on Google

How we price a house extension

Our rates above are indicative, because every house, garden and neighbour differs. We survey the house, draw the extension and price it as it is drawn, so the figure is fixed before work starts.

Any change after that is agreed in writing and priced before the work is done. Have a house and a brief? Discuss your project and we will reply the same working day.

Frequently asked questions

How much does a house extension cost in London?

The Home Owners Alliance, citing Checkatrade, puts extensions at around £1,800 to £3,000 per m². London, large glazing, bespoke kitchens and difficult ground push towards the top of that range or beyond. Our calculator gives a first indication; a fixed figure follows a survey and drawings.

Is a two-storey extension cheaper per square metre?

Usually, yes. The foundations and roof are shared by two floors, so the cost per m² falls even though the total rises. HOA quotes two-storey extensions from about £1,900 per m² for a standard finish.

How far can I extend without planning permission?

A single-storey rear extension can be permitted development up to 3 metres on an attached house or 4 metres on a detached one, and further with prior approval outside protected areas. Side extensions and conservation areas have tighter rules, and flats have no householder permitted development.

What does a kitchen extension cost on top of the building work?

The kitchen itself, its appliances and stone are a separate budget, and on a prime house they can rival the cost of the room. Decide the kitchen before the extension is priced, so the drainage, power and structure are designed for it.

Do I need a party wall agreement for an extension?

Usually, if you build on or near a shared wall or dig foundations near a neighbour's. The Party Wall etc. Act 1996 needs notice at least two months before work to a party wall and one month before nearby excavation.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Planning a house extension?

One team designs it, gets the consents and builds it, and the price is fixed before work starts. We reply the same working day.

WhatsApp us