Single Ply Roofing vs Liquid and Felt Roofs

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Flat and pitched roofs of City of London office buildings at dusk, with the towers behind

The short answer

Single ply roofing is a one-layer synthetic membrane, usually TPO, PVC or EPDM, laid in large sheets over insulation. It suits big, simple commercial roofs that need to close up fast.

  1. Liquid roofing wins on roofs crowded with plant, upstands and awkward details.
  2. Built-up felt still fits roofs with heavy foot traffic and patch repairs.
  3. Ask for the system's third-party certificate and its external fire classification.
  4. Choose the system after a survey, and with any solar or green roof already in the plan.

Single ply roofing is a waterproof covering made of one layer of synthetic membrane, laid in large sheets over insulation. It is a common choice for a new warehouse or office roof, but not always the right one.

This guide compares single ply with liquid roofing and built-up felt, the other two systems you will be offered. We carry out commercial roofing on buildings that stay in use, so we weigh them roof by roof. Facing a new roof? Discuss your roof with us before you pick a system.

What single ply roofing is: TPO, PVC and EPDM

Single ply is a thin, factory-made membrane rolled out in wide sheets. The sheets are fixed to the deck and joined at the seams, so a big roof closes up quickly.

There are three main types:

The three main types of single ply roofing membrane
MembraneWhat it isHow the seams are joined
TPOThermoplastic polyolefin, a flexible plastic sheetHot-air welded
PVCPlasticised PVC, the longest-established typeHot-air welded
EPDMA synthetic rubber sheetTaped or bonded

Each can be mechanically fixed through the insulation into the deck, fully bonded, or held down with ballast such as paving or gravel. The wind load, the deck and the roof's height set which one the designer uses.

Single ply is light, which helps on a steel-framed shed with little spare capacity. It is quick on large, open roofs. Its weak points are the details: corners, upstands, outlets and penetrations need trained hands and the maker's own parts.

Liquid roofing: where it beats a membrane

Liquid roofing is applied wet, with a reinforcing fleece, and cures into a membrane with no joints. It shines where a sheet struggles: roofs crowded with plant, pipes, upstands and rooflights.

The Liquid Roofing and Waterproofing Association lists its uses well beyond plain roofs: balconies, walkways, green roof terraces and podium decks that people walk on. It also lists overlay systems, where a liquid goes over a sound existing roof instead of stripping it.

That overlay route can save a strip-out and keep the building dry throughout. It only works if a survey shows the old roof and insulation are sound underneath.

Liquids need a dry, clean, primed surface and the right thickness, so weather and supervision matter. Most cold-applied liquids need no naked flame, which suits occupied buildings. Many roofs combine the two: single ply on the open field, liquid at the details.

Built-up felt and when it still fits

Built-up felt is two or three layers of reinforced bitumen sheet, often torched on. It is heavier and slower to lay than single ply, but it is tough.

It still makes sense in three cases:

  1. Roofs people walk on. Plant rooms and service routes where engineers cross the roof every week.
  2. Patch repairs. Matching an existing felt roof that is mostly sound.
  3. Mixed roofs. Small areas between other systems where felt detailing is simplest.

The catch is hot works. Torching on an occupied building needs a hot works permit, a fire watch and often a cold-applied alternative near combustible details. Cold-applied and self-adhesive felts now avoid the flame where that matters.

Lifespan, warranty and fire rating

How long a flat roof lasts depends less on the label than on the product, the installation and the upkeep. Three documents tell you what you are really buying.

  1. The third-party certificate. An Agrément certificate, such as from the BBA, assesses a system's fitness for purpose, durability and fire performance. The LRWA requires its manufacturer members to hold one.
  2. The guarantee. Read who backs it, what it covers and what inspection it requires. A guarantee tied to an approved installer is worth more than a supply-only one.
  3. The fire classification. Roof coverings are classified for external fire performance under BS EN 13501-5. Approved Document B sets what a roof needs, mainly by its distance from the boundary.

Ask for the classification of the whole build-up as tested, not just the membrane. The flat roofing trade associations, LRWA, NFRC and SPRA, published joint guidance on fire safety for flat roofs and balconies after the 2022 changes. The code of practice for flat roofs, BS 6229, was revised in 2025.

Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

Pascal Hunt, Google reviewSee all reviews on Google

Over a live warehouse or office: installing without closing

Most commercial roofs are replaced over a building that keeps working. The method decides whether the business notices.

  1. Work in sections. Strip only what can be made watertight the same day.
  2. Choose cold methods over people. Cold-applied liquids and bonded or fixed membranes avoid flame above occupied floors.
  3. Protect what is below. Temporary covers over stock, machines and desks, and a plan for sudden rain.
  4. Keep access apart. Hoists, skips and roof access away from loading bays, staff entrances and escape routes.
  5. Treat rooflights as fragile. Edge protection, covers or nets before anyone walks the roof.

A roof survey first records the deck, the insulation, any asbestos and every rooflight. The system choice, the programme and the price all come from it. Our guide to commercial roof replacement cost explains what moves that price. Need a roof surveyed first? Book a roof survey.

Choosing a system for solar and green roofs

A new roof should be chosen for what goes on it next. Plan for the use over the roof's whole life, not just the next winter.

Choosing a flat roof system for what goes on the roof next
Next useWhat the roof needsSystems that usually suit
Solar panelsA covering that outlasts the panels; approved mounting or ballast; spare structural loadSingle ply or liquid with the maker's approved mounts
Green roofRoot-resistant layer; more load; drainage layerLiquid or single ply certified for green roofs
Plant and walkwaysProtection pads, defined walkwaysFelt or liquid at walkways; any system with pads
Blue roof (water storage)Controlled outlets; a fully sealed deckLiquid or single ply with tested details

If panels are planned, put them in the roof design and the structural check now. Our commercial solar panels team works from the same survey, so the roof and the array are designed together. For curtain walls and facades on the same building, see our guide to curtain walling.

Before you choose a commercial roof system

  • A roof survey: deck, insulation, asbestos, rooflights and falls
  • The structural capacity for solar, plant or a green roof
  • The system's third-party certificate and guarantee terms
  • The external fire classification of the full build-up
  • A method for working over occupied floors without naked flame
  • Part L insulation priced in if more than half the roof is renewed
  • A walkway and maintenance plan for the life of the roof

Frequently asked questions

What is single ply roofing?

It is a waterproof roof covering made of one layer of synthetic membrane, usually TPO, PVC or EPDM. The sheets are mechanically fixed, bonded or ballasted over insulation, and the seams are welded or taped. It is widely used on large flat and low-pitch commercial roofs.

Which is better, single ply or liquid roofing?

It depends on the roof. Single ply covers large, open roofs quickly in wide sheets. Liquid applied membranes form a jointless coat around plant, upstands and penetrations, and can often overlay a sound existing roof. Many roofs use both: membrane on the field, liquid at the details.

How long does a single ply roof last?

The life depends on the product, the installation and the maintenance. Ask for the system's third-party certificate, such as a BBA Agrément certificate, which assesses durability, and for the manufacturer's guarantee terms. Keep foot traffic to walkways and inspect the roof every year.

Is single ply roofing fire rated?

Roof coverings are classified for external fire performance under BS EN 13501-5. Approved Document B sets the classification a roof needs, mainly by its distance from the boundary. Ask for the classification of the full system as it will be built, not just the membrane.

Can solar panels go on a single ply roof?

Yes, with the right mounting. Ballasted frames or fixings approved by the membrane maker avoid puncturing the waterproofing. Check the roof structure can carry the extra load and plan the panels before the new roof goes on.

Can a commercial roof be replaced while the building is open?

Usually yes. The old roof is stripped and made watertight in sections, so only a small area is open at once. Cold-applied systems avoid naked flames over occupied floors, and access, loading and escape routes are agreed before work starts.

A roof that stays watertight while the building stays open.

Send us photos, the roof area and any survey. We compare the systems for your roof and plan the work around your operation. We reply the same working day.