Skip to content
Request a callbackCallback
Polished marble staircase and timber-slat wall in a London office lobby

Office Refurbishment and Fit Out in Westminster

Offices across SW1, St James's and Whitehall, refurbished and fitted out around your lease dates, approved and built, zero snags.

Our track record

100% of projects delivered ahead
of programme and on budget

What our clients get

  • 3 weeksto rebuild a 750 sq m office and move the team in before the lease ran out
  • 12 weeksof nights and weekends to rebuild a 70 sq m reception at Portsoken House, every tenant at work
  • 7 monthsto build 1,550 sq m of offices at Portsoken House with tenants in the building throughout
  • £10Minsurance cover, ISO and CHAS, every accreditation the work needs

Built in the borough we work from, ready before the date you need

Westminster runs from Victoria's office campuses through St James's and Whitehall to Soho and Covent Garden. More listed buildings, more consents and tighter streets than anywhere else in London.

Our office is on Buckingham Palace Road. We survey, run the consents, then design and build under one contract, working nights and weekends so your business never stops.

Formal panelled room with tufted red velvet chairs and a draped sash window

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

Everything a Westminster office needs, under one contract

Offices designed and built by one team that also runs the estate, council and building control approvals. Also under the same contract: commercial refurbishment of whole floors and buildings before letting.

Open-plan office floor with timber slat screens and daylight from tall windows

Cat A and Cat B offices

Floors in Victoria, St James's and Whitehall, partitions, meeting rooms, kitchens and finishes delivered around your lease dates. See our office fit out.

Painted vaulted ceiling with brass chandeliers and carved joinery

Listed and period buildings

Georgian and Victorian interiors repaired, re-serviced and brought into modern use with consent drawings included.

Timber-panelled lift lobby with a stone floor

Reception and client areas

Stone, glazing, joinery and lighting at the front door of a Westminster address.

Spiral ducts and services in a concrete riser

M&E, lighting, data and fire

Air conditioning, power, data and fire systems replaced inside occupied, multi-let buildings.

Staff kitchen with black joinery, a timber splashback, under-cabinet lighting and a timber table

Kitchens, breakout and washrooms

Tea points, staff kitchens, breakout spaces and washrooms that people actually use.

Meeting room with timber-slat wall panelling, concealed lighting, an oval timber table and leather chairs

Boardrooms and meeting rooms

Glazed meeting rooms, boardrooms and acoustic partitions, wired and ready to use.

How it works

How a Westminster project runs with Craftex

01

Site visit and constraints check

We survey the building, confirm the listing, conservation-area and estate position for your address, and take your lease date.

02

Design priced as it develops

Layout, Cat B plan, joinery and services drawn by our in-house team and costed by the people who build it.

03

Approvals run for you

Licence for alterations, estate consent, planning or listed building consent where needed and building control, with their time in the programme.

04

Build around your business

Zones, out-of-hours work, deliveries timed to the council's rules and the neighbours.

05

Test, certify, hand over

Electrical, fire and air conditioning tested, certificates and the health and safety file handed over, zero snags, before your date.

Cover of the free Craftex Guide to Office Fit-Out

The Craftex Guide to Office Fit-Out

We walk you through every step of an office fit-out: the terms you will hear, what drives cost and programme, and the checklist that keeps your move date safe.

Our promises

Six promises, written into your contract

Not marketing lines. These are the terms we build to on every Westminster project.

  1. One team, survey to keys

    Design, approvals and construction under one contract, one project manager, the same directors throughout.

  2. The agreed price stands

    A fixed figure for a written scope; every change priced and agreed in writing before the work.

    100% of projects on budget.

  3. Your business never stops

    Phased floors, nights and weekends, clean handback every morning.

    Portsoken House: 7 months around occupied tenants.

  4. Ready before your date

    Around 60% of the labour is our own, so no week is lost waiting for trades.

    Beaumont House: 750 sq m in 3 weeks; Portsoken House: 1,550 sq m in 7 months.

  5. £10M cover on every job

    Public and employers' liability, PI on request; ISO 9001, 14001 and 45001, CHAS and SafeContractor.

  6. Zero snags, every certificate

    We leave when it is right; test certificates, consents and the health and safety file in your hands on day one.

Example office fit-out quotation from another contractor with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Send us the quote you have. We survey the site, then give you a better figure for the same scope, plus a programme that hits your lease date. Or talk the project through with our team first.

Compare your quotes

Where Westminster projects usually go wrong, and what we do instead

Hold any quote up against this. The risk is the same on every project; who carries it is not.

AreaThe usual riskWith Craftex
Who is responsibleA designer, a consultant and a builder, each blaming the others when the council asks for changesOne team draws it, submits it and builds it; the council, the estate and the landlord deal with one name
The final billA price given before anyone has opened up a 150-year-old buildingA survey first, then a design costed as it develops by the people who build it
Your staff and customersA floor or a meeting room shut for monthsWorks phased and timed around your hours; noisy tasks out of hours; the space handed back clean each morning
Your dateWeeks lost to consents, estate approvals and deliveries nobody planned for central LondonApprovals, s61 hours and delivery slots mapped at the first visit and built into the programme
Compliance and sign-offListed building, building control, fire and the landlord's conditions left for you to chaseWe run every approval and certificate you need to occupy and to satisfy your landlord, the council and your insurer
HandoverSnag tape on move-in dayZero snags, and the paperwork on your desk on day one

Office fit out cost in Westminster, 2026

Our 2026 rates per sq ft for a typical 6,000 sq ft Westminster office floor, ex VAT and fees.

ItemWhat it coversLow to high spec
Construction (Cat B)Partitions, ceilings, floors, kitchen, finishes and changes to services£63–108/sq ft (£678–1,165/m²)
FurnitureDesks, seating, meeting and breakout furniture£18–54/sq ft
AV and ITMeeting-room screens, conferencing and data points£4.50–13.50/sq ft
All inConstruction, furniture, AV and IT together£85.50–176/sq ft (£920–1,890/m²)

Assumes the base building, power and air conditioning are in good order. Listed-building repairs, out-of-hours working and central London logistics are priced per project; Laxton's NRM 2026 gives London a location factor of about 1.09, which these rates do not apply. Full breakdown: office fit-out cost guide.

Send us the floor plan and your lease date; after a site survey we come back with a fixed figure and a programme.

Free cost calculator

What will your Westminster office fit-out cost?

Enter your floor area or headcount and pick a specification. You get a range straight away, based on our 2026 London rates.

I know my
Add
Your estimateEnter your spaceex VAT and fees Get a fixed figure

Indicative, ex VAT and fees, for a Cat A floor in good order. Central London factor (Laxton's 2026, about 1.09), listed-building and out-of-hours conditions are not included; your fixed figure comes after a survey.

Our team

  • in

Questions about building in Westminster

Do you work in Soho and Covent Garden as well as SW1?

Yes: the whole City of Westminster, from Victoria and Pimlico through St James's and Mayfair to Soho and Covent Garden. Our office is on Buckingham Palace Road, and our Preconstruction Director led the strip-out and structural works at Slingsby Place in Covent Garden as Project Director.

Do you also fit out restaurants and pubs in Westminster?

Yes, as a separate service with its own licensing route: see our restaurant and hospitality fit out page.

Can you fit out our office while we keep working in it?

Yes. We phase the floor, do noisy work at night and at weekends and hand the space back clean each morning. At Portsoken House we built 1,550 sq m of offices over 7 months with tenants in the building throughout.

How much does an office fit-out in Westminster cost?

Construction for a Cat B office runs about £63–108 per sq ft ex VAT, with furniture, AV and IT on top; use the calculator above for a range in a minute. Send us the plan; a survey comes first, then you get a fixed figure.

Who handles planning, listed building consent and building control with Westminster City Council?

We do. Our design and planning team prepares and submits the applications, answers the case officer and manages the conditions; where the Crown Estate or another estate is freeholder, we prepare the same package for its approval and for your landlord's licence for alterations.

What hours can you work, and how do deliveries work on these streets?

Westminster expects noisy work in weekday daytime hours and Saturday mornings, nothing noisy on Sundays. For evening or weekend work we apply for section 61 prior consent, which fixes hours and noise levels in advance. Deliveries are booked to timed slots and the pavement is kept clear; on Savile Row we did this for 12 weeks and the neighbours were not affected.

How long does an office fit-out in Westminster take?

Our 750 sq m Kensington office took 3 weeks and 1,550 sq m at Portsoken House took 7 months, occupied throughout. Add time before site for the licence for alterations or listed building consent, which we map at the first visit.

What size of project do you take on, and where is your office?

Construction from £100,000 to £10M+: one floor or a whole building. We are at Unit 5, 160 Buckingham Palace Road, SW1W 9TR, so a site visit anywhere in Westminster is a short walk or a ten-minute drive.

What our clients say

See all reviews on Google
  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Planning an office in Westminster?

Send us the address and a few photos. We tell you what consents apply, what is realistic and when it can be ready.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us