Cost to Build an Office Building in 2026: UK and London Prices per m²

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 7 min read

City of London office towers rising behind the Tower of London and the Thames on a clear day

The short answer

Building an office in the UK costs about £1,900 to £3,300 per m² of gross internal floor area in 2026 (£177 to £307 per sq ft), before VAT, fees and land. London usually adds around 9%.

  1. Low-rise offices for letting sit at the bottom of the range; air-conditioned high-rise offices for owner occupation sit at the top.
  2. The rate leaves out VAT, fees, land, CIL and section 106, abnormal ground costs and the tenant's fit-out.
  3. A deep refurbishment of an existing office building runs about £1,000 to £1,800 per m².

The cost to build an office building in the UK is about £1,900 to £3,300 per m² of gross internal floor area in 2026. That is £177 to £307 per sq ft, before VAT, fees and land, and London usually adds around 9%.

This guide is for developers, investors and businesses weighing a new office building. It shows the rate for each type of office, what the rate leaves out and what pushes it up. It also covers when refurbishing an existing building costs less.

We price schemes like these as a design and build construction company in London. Have drawings or a site? Discuss your project and we return a cost range before you commit.

Office building construction cost per m² in 2026

The rate depends mostly on height, air conditioning and who the building is for. The table uses Laxton's 2026 guide prices, the same basis as our own cost calculator. It measures the gross internal floor area: every storey, inside the external walls. For a quick range for an office or any other project type, use our build cost calculator.

Cost to build an office building per m² in 2026, before VAT, fees and land
Office typeUK £ per m²UK £ per sq ftLondon £ per m² (about +9%)
Low-rise, for letting, no air conditioning£1,900 to £2,400£177 to £223£2,070 to £2,620
Low-rise, for letting, air-conditioned£2,400 to £2,750£223 to £255£2,620 to £3,000
High-rise, owner-occupied, air-conditioned£2,900 to £3,300£269 to £307£3,160 to £3,600
Refurbishment, basic£1,000 to £1,650£93 to £153£1,090 to £1,800
Refurbishment, high quality with air conditioning£1,200 to £1,800£111 to £167£1,310 to £1,960

The London column and the sq ft column are our own conversions. Laxton's gives a London location factor of about 1.09. To turn any rate per m² into sq ft, divide by 10.764.

A guide price is a starting point for an appraisal. It assumes a typical site and a typical specification. Your own figure moves with the ground, the facade and the services, which the next sections cover.

What the build cost per m² includes and leaves out

Most budgets go wrong on the lines that sit outside the rate, not on the rate itself. Laxton's guide prices cover the building. They exclude contingencies, external works, furniture and equipment, professional fees and VAT.

Land, finance, planning costs and the tenant's fit-out are outside it too. The RICS order of cost estimate (NRM 1) sets the full list a cost plan should carry:

  1. Building works. Substructure, frame, envelope, internal finishes and building services.
  2. Preliminaries and overheads and profit. The contractor's site set-up, management and margin. Ask whether a quoted rate includes them: under NRM 1 a strict cost per m² does not.
  3. Fees. Consultants, plus the contractor's pre-construction and design fees on a design and build route.
  4. Other project costs. Facilitating works, external works, statutory fees and CIL and section 106.
  5. Risk and inflation. Separate allowances for design development, construction risk and price rises to the start and through the build.
  6. VAT. Building a new commercial office is normally standard-rated, at 20%. The zero rate is for new homes and certain residential and charitable buildings.

Whether you can recover the VAT depends on your own VAT position, so settle it with your adviser before the appraisal. Then compare quotes line by line, never on one rate per m².

Is your scheme still at appraisal stage? As a construction company in London, we check the drawings, the site and the cost plan together, before you are committed.

What moves the cost of an office building

Two offices of the same floor area can differ by a third or more in cost. Six things decide where yours lands in the band.

Glass and steel office facades with diagonal bracing beside a stone Victorian building in the City of London
The facade and the frame set much of the rate before a single desk goes in.
  1. Height and frame. Taller buildings need a heavier frame, more lifts and longer crane time. Laxton's high-rise band starts at £2,900, above the top of the low-rise air-conditioned band.
  2. Facade. A fully glazed curtain wall usually costs more than brick or precast panels with punched windows.
  3. Services and energy. Air conditioning adds about £425 per m² between the midpoints of Laxton's two low-rise bands. New energy rules take effect on 24 March 2027.
  4. Ground and basements. Contaminated ground, piling, party walls and basements are abnormal costs: price them from surveys, not from a rate.
  5. London site logistics. A tight City or West End site needs a construction logistics plan, timed deliveries and more off-site work.
  6. Procurement route. Design and build or traditional procurement changes who carries the design risk and how early the price is fixed.

Projects that give a building notice or apply for full plans approval before 24 March 2027 stay on today's energy rules. That holds only if work starts before 24 March 2028. Schemes at appraisal now should cost both cases.

Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

Misha Levit, Google reviewSee all reviews on Google

Office build-out costs: shell and core, Cat A and Cat B

An office build rate covers the building, not the workplace inside it. That is why a build budget and a fit-out budget never match. The office build-out cost, the work that turns a finished shell into a working floor, sits in Cat A and Cat B. The stages below show where one ends and the next begins.

The three stages of an office building and who usually pays
StageWhat it coversUsually paid byWhere to read the cost
Shell and coreFrame, envelope, cores, lifts, main plant and common partsDeveloperThis guide
Cat AA lettable open floor: ceilings, raised floors, lighting, heating and coolingDeveloper, on a speculative lettingCat A fit-out cost
Cat BThe tenant's layout, meeting rooms, kitchen, IT, furniture and brandTenantOffice fit-out cost

An owner-occupier pays for all three, so plan them as one budget. Our guide to Cat A fit-out cost prices the developer's floor. The office fit-out cost guide prices the tenant's interior. When you need the floor built, our office fit out company in London designs and delivers Cat A and Cat B under one contract.

Agree early where the shell stops. Every service, finish or riser left out of the base build comes back later as a fit-out cost, often at a higher rate.

Build new or refurbish an existing building

Refurbishing is usually the cheaper route to a working office. Laxton's puts a high-quality office refurbishment with air conditioning at £1,200 to £1,800 per m². A new low-rise office starts at £1,900.

The saving comes from what you keep: foundations, frame and often the cores. Keeping them also keeps the carbon already built into the structure. Works that affect only the interior, or barely change the outside, are not development under planning law. A new building always needs planning permission first.

£2.2MPortsoken House, Aldgate: office fit-out from scratch
1,550 sq mover two floors, delivered in 7 months
£1,420 per m²our calculation, design and full M&E included

At Portsoken House we fitted out 1,550 sq m of premium offices in seven months. The project value was £2.2M, design included, with a full mechanical and electrical package. Every other floor stayed let and at work throughout.

That lands at about £1,420 per m², inside Laxton's high-quality refurbishment band. Our guide to office refurbishment cost breaks that band down. Refurbishment stops paying when the floor-to-ceiling heights are too low, the column grid fights the layout or the frame needs major repair. Then a new building can be the cheaper way to the asset you want.

Budgeting an office scheme in six steps

A reliable budget starts with the area and the type, then adds every line that sits outside the rate. Work through it in this order.

  1. Measure the area. Use the gross internal floor area of every storey, not the net lettable area.
  2. Pick the band. Match the height, servicing and occupier to a row of the table above.
  3. Add the London uplift. Multiply by about 1.09 for a London site.
  4. Allow for abnormals. Ground, basements, party walls and access, priced from surveys.
  5. Add the lines outside the rate. Fees, VAT, CIL and section 106, statutory fees and external works.
  6. Hold a contingency. Size it to the risk left in the design; our guide explains how much contingency to carry.
2,000 m²example: low-rise, air-conditioned office in London
£2,620 to £3,000per m² with the London uplift
£5.2M to £6.0Mbuilding cost, before fees, VAT, land and contingency

Those six lines feed straight into a development appraisal, where the build cost sets what the land is worth. Joe Crawford, our Operations Director, brings 37 years in construction, on projects of up to £135M. Our free review checks the buildability and the cost plan before a price is fixed.

Ready for a figure for your own building? Discuss your project. Send us the drawings or the site address and we return a cost range and the main risks, free.

Use the list below before you ask any contractor for a figure.

Before you price an office scheme

  • Gross internal floor area for each storey
  • Height, frame and facade intent
  • Heating, cooling and energy strategy
  • Ground investigation and any basement
  • Planning status and likely CIL or section 106
  • When you need the keys

Frequently asked questions

How much does it cost to build an office building in the UK?

About £1,900 to £3,300 per m² of gross internal floor area in 2026, based on Laxton's guide prices. Low-rise offices without air conditioning start near £1,900; air-conditioned high-rise offices for owner occupation reach £3,300. VAT, fees, land and the fit-out come on top.

What is the construction cost per square metre for offices in London?

Add about 9% to the UK rates for London. That gives roughly £2,070 to £3,600 per m² for a new office building, before VAT, fees and land. Tight City sites, basements and premium facades can push a scheme above that range.

How much does it cost per square foot to build office space?

About £177 to £307 per sq ft of gross internal floor area across the UK in 2026, or roughly £192 to £334 per sq ft in London. Divide any rate per m² by 10.764 to convert it to sq ft.

Is it cheaper to refurbish an office building or build new?

Usually, yes. A refurbishment runs about £1,000 to £1,800 per m², against £1,900 to £3,300 for a new building. It also skips the frame and the foundations. A new build wins when the existing frame, floor heights or condition cannot give you the building you need.

Does the build cost include VAT and fees?

No. The rates in this guide exclude VAT, professional fees, contingency, external works and furniture. Building a new commercial office is normally standard-rated for VAT, at 20%. Fees, land, finance, CIL and section 106 are separate lines in the appraisal.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Know the build cost before you buy the site.

Send us the drawings or the site address. Our pre-construction team checks the buildability and returns a cost range for your office scheme, free and with no obligation.