Skip to content
Request a callbackCallback

For pub owners and buyers who want homes

Pub Conversion in London: Change of Use from Pub to Residential

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 9 min read

Victorian red-brick corner pub in south-east London with two upper floors, tall chimneys and climbing plants over the ground-floor bar

The short answer

A pub conversion in London always needs full planning permission. Pubs are sui generis, so there is no Class MA or other permitted development route to flats, and the council will test whether the pub can survive first.

  1. No permitted development: a pub can only change to a pub with more food without an application.
  2. London Plan HC7: the pub marketed as a pub for at least 24 months, at a price set by an independent valuation.
  3. Asset of Community Value: you notify the council before selling, then wait 6 weeks, or 6 months if a community group bids.
  4. Flats above a working pub are the likeliest consent, if the pub keeps its cellar, kitchen and garden, and the flats carry the soundproofing.

A pub conversion in London always needs full planning permission. Pubs are sui generis, so there is no Class MA shortcut, and the council will first ask whether the pub can survive as a pub.

That question decides most schemes. The London Plan expects 24 months of marketing as a pub before a loss is accepted. An Asset of Community Value listing can pause a sale for six months. And the building itself hides cellars, shared walls and noise problems a house never has.

This guide is written by our change of use planning permission team, who plan and build conversions under one contract. Once the route is clear, we deliver commercial to residential conversions as well. Thinking about a pub? Get a free route check before you buy, close or market it.

Why every pub conversion needs full planning permission

Since 1 September 2020, pubs, wine bars and drinking establishments have sat outside every use class. They are sui generis, "of their own kind". So is a pub with expanded food.

That has one practical result. No permitted development right turns a pub into homes. The only permitted change is Class AA: a pub can become a pub with more food, and back again.

Class MA does not apply to pubs

Class MA lets a building in Class E become flats through prior approval. It covers shops, offices, cafés and restaurants with at least two years of Class E use. A pub is not in Class E, so the route is closed. Our guide to commercial to residential permitted development explains how Class MA works for the buildings it does cover.

Demolition is not permitted development either

The national right to demolish a building excludes any building used, or last used, as a drinking establishment. So "knock it down and start again" needs an application too.

How a building reaches residential use
Building todayRoute to flatsWho decides
Pub, wine bar or bar, open or closedFull planning applicationThe council, on its pub policies
Pub with flats or staff rooms aboveFull planning applicationThe council, testing the pub's future
Former pub with a lawful Class E use for 2+ yearsClass MA prior approval may applyThe council, unless an Article 4 direction removes Class MA
Shop or office in Class EClass MA prior approvalThe council, on limited prior approval matters

The 24-month marketing test under London Plan HC7

London Plan policy HC7 tells boroughs to protect pubs with heritage, cultural, economic or social value. An application that loses such a pub "should be refused" unless authoritative marketing evidence shows no realistic prospect of pub use.

The supporting text sets the bar. The pub should have been marketed as a pub for at least 24 months. The price is agreed after an independent valuation. The building stays in a condition that lets it trade. And it is offered locally and London-wide, through specialist agents.

Which pubs the policy protects

Most London pubs pass at least one of the London Plan value tests. The council looks at whether the pub:

  • is in a conservation area or is a listed building
  • holds a licence for music, events, film or sport
  • is linked to a sports club, or has rooms for hire
  • adds to the night-time economy or serves a specific community

Boroughs add their own tests

Each borough's local plan sits on top of HC7. Lambeth's policy ED9 is a clear example. It asks for a viability report, with active marketing over a continuous period of at least 24 months.

Lambeth then asks one more thing. Is there really no prospect of another commercial or community use? Homes come last in that order. Its guidance also wants the pub kept vacant through the campaign, offered free of tie and without restrictive covenants.

A new London Plan went out to consultation from July to October 2026, with adoption expected in 2027. Until then, the 2021 plan and its HC7 tests apply.

Our change of use for a pub team sets the marketing brief with the planning case. The evidence then fits the application it has to support.

Asset of Community Value: the listing and the moratorium

A local community group can nominate a pub as an Asset of Community Value. If the council lists it, the listing lasts five years. It does not stop you owning, running or applying for planning. It controls how and when you sell.

Before selling a listed pub, the owner must notify the council in writing. A six-week interim moratorium follows. If a community group asks to be treated as a bidder, the pause extends to six months.

6 weeksinterim moratorium after you notify the council
6 monthsfull moratorium if a community group asks to bid
18 monthsprotected period, from the same notification
5 yearshow long an ACV listing lasts

Why the listing matters in planning too

The London Plan says the right to bid "is not a right to buy". You can turn the bid down. But it also asks boroughs to treat an ACV listing as a material consideration on a change of use. A listed pub starts its application with a visible community case against it.

The law is changing. The English Devolution and Community Empowerment Act 2026 replaces the right to bid with a community right to buy. On 2 November 2026 those changes were not yet in force. Check the regime again before you exchange.

We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

Ben Edell, Google reviewSee all reviews on Google

Article 4 directions and a pub conversion

An Article 4 direction removes a permitted development right in a defined area. Because a pub has no right to become homes, there is nothing for a direction to take away. National law removed those rights in 2017.

Article 4 still matters in two cases.

  1. The building already has a lawful Class E use. A former pub consented as a restaurant years ago could, after two years of Class E use, look at Class MA. At least 15 London boroughs have removed Class MA in some areas.
  2. You plan shared housing. Turning a new flat into a small HMO is caught by the HMO directions in many boroughs. Our list of HMO Article 4 directions in London shows where.

Keeping the ground floor as a pub with flats above

Converting only the upper floors is often the strongest application. The pub keeps trading, and the council keeps the facility HC7 protects. But the policy watches this route closely.

Corner pub in Marylebone dated 1863, with three storeys of sash windows above the ground-floor bar

HC7 resists any conversion of upper floors, function rooms or gardens that would compromise the pub's operation or viability. The London Plan names the risk plainly: new residents complain about noise. So the scheme must prove the pub still works with homes above it.

What the council looks for

  1. Operation: the pub keeps its cellar, kitchen, toilets, deliveries and bin store.
  2. Space: a function room or beer garden lost to flats can sink the application.
  3. Access: the flats get their own front door, not a route through the bar.
  4. Noise: under the Agent of Change policy, the new homes carry the sound insulation, not the pub.

Fire separation shapes the layout too. Approved Document B asks for separate escape routes from the homes and from the pub. Up to three storeys above the ground storey, one stair can serve both. Each floor then needs a protected lobby rated REI 30.

Build issues in a pub conversion: cellars, party walls, sound and fire

Creating flats in a pub is a material change of use under the Building Regulations. The fire, ventilation, drainage, energy and electrical requirements then apply to the whole conversion. So do moisture resistance and sound insulation.

Cellars

Pub cellars were built for barrels, not bedrooms. Expect damp, low ceilings and no daylight. Moisture resistance becomes a legal requirement once the space is a home. On Allitsen Road the basement had 1.8 m of head height. Raising the ground floor made it habitable without digging.

Party walls

Most London pubs share walls with neighbours. Lowering a cellar floor usually means work on the party wall and digging next to it.

Sound

Sound insulation between the flats and the pub has to pass a test. The results go to building control before sign-off. Bass from a jukebox or live music travels through structure, so floors and walls are designed as isolated layers, not just thicker boards.

Fire, services and height

Beer lines, kitchen extract and gas supplies are stripped out and capped. A new fire alarm, fire-stopping and fire doors protect the escape route. Keep the top storey under 11 m where you can: above it, a block of flats needs sprinklers throughout.

Cost and VAT

The build cost of a commercial to residential conversion turns on the structure, the services strip-out and the separation between flats, and London runs higher than the rest of the UK. A pub's cellar, structure and acoustic work push it towards the top end. A fixed figure comes after a survey.

The builder's work is normally charged at 5% VAT, not 20%. HMRC lists a pub with staff rooms that are not self-contained as a qualifying conversion. Our guide to VAT on conversions covers the zero-rated sale.

What a sui generis club taught us: Allitsen Road

Allitsen Road is not a pub. But the planning problem is the same for any sui generis building, and we costed this one in detail. Allitsen Road in St John's Wood was a vacant former private members' club, bought at auction in 2026.

Like a pub, a club has no automatic route to homes. The council expects sustained evidence that the old use has ended. We built that evidence from the club's trading history, its vacancy record and a properly structured marketing campaign. We planned 12 to 18 months of it into the deal; a London pub usually needs 24.

Allitsen Road, four routes designed and costed (GDV at £1,250 per sq ft)
OptionHomesBuild costGDV
Convert within the existing building4£1.90M£4.06M
Add a roof storey6£2.25M£5.29M
Basement by raising the ground floor (recommended)6£2.51M£5.87M
Basement by excavation7£2.75M£6.06M

We advised against the dearest option. Digging the basement added about £240,000 and three months to win one extra one-bed flat.

The planning money moved even more. Protecting the vacancy history could cut the affordable-housing bill by over £1M through vacant building credit. The Community Infrastructure Levy could swing by six figures on the lawful-use history. A vacant pub raises the same questions.

One team from the planning case to the keys

A pub conversion fails in the gaps. The marketing evidence doesn't match the planning case. The drawings ignore the cellar. The price arrives after consent.

We run the planning strategy, the design and the build as one team, so each decision is priced while it is drawn. Craftex started in 2016 as a carpentry and joinery company, and construction is still our own department. We take on construction from £100,000.

We confirm the route, the evidence the council will want and the likely build cost in one go. Send the address and get a free route check.

Before you exchange or call last orders

  • Confirm the lawful use and planning history, including any Class E consent.
  • Search the council's Asset of Community Value list and its nominations.
  • Read the borough's pub policy and its marketing rules.
  • Check conservation area, listing and Article 4 status.
  • Measure the cellar head height and look for damp.
  • Count the party walls and the neighbours who will get notices.
  • Decide early: whole building to homes, or flats above a pub.
  • Price the worst case before you exchange.

Frequently asked questions

Do you need planning permission to convert a pub into flats?

Yes, always. A pub is sui generis under the Use Classes Order, so no use class or permitted development right covers a change to homes. The only permitted change is between a pub and a pub with expanded food. Demolishing a pub also needs an application, because the demolition right excludes drinking establishments.

Can a pub be converted to residential under permitted development or Class MA?

No. Class MA only covers buildings that have been in Class E use, such as shops and offices, for at least two years. A pub is not in Class E. Only if the building already has a lawful Class E use, for example under an earlier consent for a restaurant, could Class MA come into play, subject to any Article 4 direction.

How long does a pub have to be marketed before change of use in London?

The London Plan asks for at least 24 months of marketing as a pub, at a price agreed after an independent valuation, with the pub kept in a condition that lets it trade. Boroughs add their own tests. Lambeth, for example, also wants a viability report and the pub offered free of tie, without covenants that would stop another operator.

What does an Asset of Community Value listing mean for a pub conversion?

The listing lasts five years. Before selling, the owner must notify the council, then wait six weeks; if a community group asks to bid, the wait is six months. The owner does not have to accept a bid. In London the council should also treat the listing as a material consideration on a change of use application.

Can I convert the upstairs of a pub into a flat?

Often yes, with planning permission, if the pub below keeps working. London Plan policy HC7 resists conversions of upper floors, function rooms or gardens that would compromise the pub. The new flat needs its own fire-protected escape, sound insulation that passes testing, and noise mitigation designed in by the developer.

What VAT applies to converting a pub into flats?

The builder's work on a qualifying conversion is normally charged at 5% VAT. HMRC treats a pub with staff accommodation that is not self-contained as a qualifying conversion. On sale, a flat made from the bar areas can be zero-rated, while a flat made from the former living quarters is exempt.

Know the route before you buy, close or market the pub.

Send us the address. We confirm the planning route, the marketing evidence the council will want and what the conversion is likely to cost, before you commit a pound to drawings.

WhatsApp us