Pub Refurbishment in London: What to Plan Before You Close the Doors

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read

Victorian pub interior with carved timber snugs, a tiled floor and an ornate ceiling

The short answer

A London pub refurbishment is decided before any builder arrives: the premises licence plan, the building's heritage status and how long you can close. Settle those and the build becomes the predictable part.

  1. A changed bar or layout usually needs a variation to the premises licence.
  2. Listed pubs need consent for interior works too, including bar backs and joinery.
  3. Survey the fabric first and carry a contingency for what old pubs hide.
  4. We refitted Drake's 120 sq m Savile Row flagship in 8 weeks on site without closing a day.

Pubs are not like other fit-outs. The character is the product. Regulars notice a new floor or a moved bar before anything else.

The building usually hides a century of alterations behind its panelling. So a London pub refurbishment is won or lost before the doors close. Planning one? Book a site visit and we will survey the building with you.

This guide is written from the contractor's side. It draws on London premises we refitted without losing their character, such as Drake's on Savile Row. It covers consents, licensing, the build and how to protect your reopening date.

What a pub refurbishment in London usually includes

Scopes range from a redecoration to a full rebuild of the trading floor. A full refurbishment typically touches six areas.

  1. The bar. Servery, back-bar, glass washers, under-counter cooling, beer lines and dispense.
  2. Front of house. Flooring, seating and banquettes, lighting, decoration and joinery.
  3. Back of house. Cellar, kitchen and extraction, stores and staff areas.
  4. Toilets. Often the most criticised room, and the hardest to fit into an old plan.
  5. Services. Electrics, gas, water, drainage, ventilation, fire alarm and emergency lighting.
  6. The outside. Signage, lighting, the shopfront and windows, the garden or terrace.

The brief is usually a balancing act. Modernise the bar, trade areas and back-of-house for today's volumes. Keep the warmth and history that bring regulars back.

The consents you may need

Consents for a London pub refurbishment
ConsentWhen it appliesWho decides
Premises licence variationThe layout on the licence plan changes: bar, licensed areas or exitsThe licensing authority
Planning permissionExternal changes, outside ducts or plant, extensions, change of useThe borough council
Listed building consentWorks affecting a listed building's character, inside or outThe borough council
Advertisement consentMany illuminated signs and some othersThe borough council
Building regulationsNew toilets, structure, fire separation, escape routes, servicesBuilding control
Landlord's licence for alterationsYou lease the pub and the lease requires consentYour landlord or pub company
Pavement licenceTables and chairs on the public highwayThe borough council

Planning: London pubs are protected

Since 1 September 2020, pubs and other drinking establishments sit outside the main use classes. They are "sui generis". So changing a pub to another use needs planning permission.

In London, Policy HC7 of the London Plan 2021 asks boroughs to protect pubs with heritage, cultural, economic or social value. Losing one needs authoritative marketing evidence. A refurbishment that keeps the pub trading is on the right side of that policy. Shrinking the pub to fit flats above will get close attention.

Listed pubs

Many London pubs are listed or sit in conservation areas. Listed building consent covers works that affect the building's character, and that includes interiors. Bar backs, screens, tiling, joinery and ceilings all count. Works without consent can be a criminal offence.

If the building is listed, the survey and the heritage strategy come before the design.

Licensing: plan it with the design

Your premises licence comes with a plan of the licensed area. Changing the layout usually means changing the licence. The Licensing Act 2003 offers two routes.

  1. Minor variation. For changes that could not hurt the licensing objectives. Others can comment in the first 10 working days. The authority must decide within 15 working days. Small layout changes often go this way.
  2. Full variation. For anything bigger, with a longer consultation and the chance of a hearing.

The route fixes how early the final layout must be frozen. Share the plan with your licensing adviser as soon as the bar position and exits are settled.

Old pubs hide things: survey first

Old buildings keep their secrets until you open them up. On a pub that often means:

  • rotten joists under the bar or the cellar flap
  • earlier alterations that removed structure nobody recorded
  • old wiring and lead pipework behind panelling
  • asbestos in older boards, coatings or floor tiles
  • damp in cellars and party walls

A pre-construction survey maps the structure, services and finishes. The programme should carry contingency for the discoveries every heritage job throws up. That contingency is the difference between a reopening date that holds and one that slides.

HSE advises assuming asbestos is present in buildings built or refurbished before 2000. Works that disturb the fabric need a more intrusive survey first. As the client, you provide that information under the CDM 2015 regulations.

Highly recommended! Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

Monika Kamionka, Google reviewSee all reviews on Google

The bar: faster service without losing the character

The bar is the heart of any pub. It usually needs to serve faster and look as if it has always been there. We focus on four things.

  1. Servery and back-fit. Reworked for flow and capacity, so staff move less and serve more.
  2. Materials that feel established. Timber, brass-tone metalwork and finishes that age well.
  3. Hard-wearing surfaces. Floors and tops chosen for spills, footfall and late nights.
  4. Joinery managed directly. So new work matches the original and the join between old and new is detailed properly.

The aim is simple. A regular walking back in should feel the place has been looked after, not replaced.

Kitchen, cellar and services

If you serve food, the kitchen and its extraction drive cost and programme more than anything front of house. External ductwork or plant usually needs planning permission. The route to roof level is often the hardest problem in a building with flats above. Our restaurant kitchen fit-out guide covers extraction, gas and drainage in detail.

Cellars need their own attention. Plan cooling, drainage, safe access and enough power for the plant and glass washers. A new operator must register the food business at least 28 days before trading.

Close or keep trading during the refurbishment

Closing for the works or trading through them
Close for the worksKeep trading
ProgrammeShortest, one continuous buildLonger, phased
Build costLowerHigher: out-of-hours work, protection
Lost tradeAll trade while closedReduced trade during phases
RiskConcentrated in one pushSpread out, more contact with customers
Best forFull refurbishments, structure or servicesRedecoration, toilets, garden, single rooms

Most full refurbishments close. Where trading must continue, work is phased room by room, with noisy work out of hours.

We refitted Drake's flagship store on Savile Row over 8 weeks on site while it stayed fully open. Every delivery and work slot was planned around trading.

What decides the cost of a pub refurbishment

Two pubs of the same size can differ several times over in cost. So we don't publish a rate per square metre. These are the things that move the number.

  • the condition of the structure and services once opened up
  • listed status and the level of heritage detail
  • the bar and back-bar joinery specification
  • the kitchen and extraction, if food is part of the plan
  • toilet reconfiguration
  • whether you close or phase
  • long-lead items: bespoke joinery, ironmongery, lighting, specialist tiles

The only reliable number comes after a survey. We take on construction projects from £100,000 through our restaurant and hospitality fit-out team.

A realistic sequence for a London pub

  1. Survey. Structure, services, asbestos and heritage features.
  2. Design and licensing plan. Layout, bar, kitchen and toilets, plus the licence variation route.
  3. Consents. Listed building consent, planning, landlord and building control as needed.
  4. Procurement. Order long-lead joinery and equipment before you close.
  5. Build. Strip-out, fabric repair, services, bar and joinery, floors, decoration.
  6. Commissioning and sign-off. Gas, electrics, fire alarm, emergency lighting, building control, fire risk assessment.
  7. Reopen. Then an aftercare period to settle the building.

For restaurants, cafés and hotels, see our hospitality fit-out guide and our guide to hotel refurbishment in London. Weighing up a pub now? Book a site visit before you set the closing date.

Frequently asked questions

Do I need planning permission to refurbish a pub?

Not for internal works that don't affect a listed building. You usually do for external changes, extract ducts or plant on the outside, extensions and changes of use. Since 1 September 2020 pubs have been outside the main use classes, so changing a pub to another use needs permission.

Does refurbishing a pub affect the premises licence?

It can. If the layout changes from the plan attached to your premises licence, you will usually need a variation. A minor variation is decided within 15 working days; bigger changes need a full variation with a longer consultation.

Do I need listed building consent for internal works to a pub?

If the pub is listed and the works affect its character, yes, including interior works such as bar fittings, screens, tiling and joinery. Check with the council's conservation team before you design.

How long does a pub refurbishment take?

It depends on the scope and the building. As a guide, we refitted Drake's 120 sq m flagship on Savile Row in 8 weeks on site while it stayed open, and stripped and rebuilt Medusa's four floors in Knightsbridge in 17 weeks. Surveys, design and consents come before that.

Can a pub stay open during refurbishment?

Sometimes. Phased works with noisy work out of hours can keep a pub trading for redecoration, toilets or single rooms. Full refurbishments involving structure, the bar or services are usually faster and cheaper with the pub closed.

How much does it cost to refurbish a pub in London?

It depends on the building's condition, listed status, the bar and joinery specification, the kitchen and toilets, and whether you close. A survey is the only reliable basis for a figure. We take on projects from £100,000.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Refurbishing a pub or bar in London?

We survey the building, design the bar and back-of-house with you, and deliver the joinery, services and finishes under one contract. Book a site visit.

WhatsApp us