For owners of prime London homes
Best Interior Designers in London: 8 Checks
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read
The short answer
The best interior designers in London for a prime home show finished rooms, price the design as they draw it and control who builds it. Compare them on eight checks, not on renders.
- Choose the route first: a designer then a builder, a builder working to your design, or design and build.
- Ask when you will see a real build cost, and who fixes it.
- Ask who makes the joinery and who applies the specialist finishes.
- Ask how they handle your managing agent, the lease and the neighbours.
The best interior designers in London for a prime home do three things well. They show finished rooms, they price the design as they draw it, and they control who builds it. Beautiful drawings are common; drawings built to the millimetre, on budget, are not.
This guide gives you eight checks to compare studios fairly, and the three ways to buy a high-end interior. It also shows where we fit, and when you would be better served elsewhere.
We are high-end interior designers in London who also build what we draw. Planning a prime home interior? Book a free design consultation and we will walk the rooms with you.
Three ways to buy a prime London interior
Before you compare studios, choose the route. It decides who carries the risk when the drawings and the site disagree.
- Designer, then builder. An interior studio completes the design, then the work goes to tender with a fit-out contractor. You get design freedom and a competitive build price, but two firms and a gap between them.
- Builder working to your design. A luxury contractor builds to a scheme you already hold. It suits owners whose design is finished and fully detailed.
- Design and build. One company designs and builds. Design and cost are decided together, and one party owns the result.
None of these is right for everyone. Our guide to design and build vs traditional procurement explains the trade-offs in contract terms.
Eight checks to compare interior designers in London
These are the questions we would ask if we were choosing a designer for our own home. Put the same eight to every studio on your shortlist.
1. Finished homes, not renders
A render shows an intention. A finished room shows what the studio can deliver. Ask to see built homes of a similar size, in similar buildings, and ask what each one took to finish.
2. Design that is priced as it is drawn
The most common failure in high-end work is a scheme that comes back far over budget. Months of redesign follow. Ask how the studio keeps build cost in view during design, and when you will see the first real figure.
3. Joinery made, or tightly controlled
Bespoke joinery defines a prime interior, and it is often the longest lead item. A studio that makes or directly manages its joinery controls quality and timing. We started in 2016 as a carpentry and joinery company, and the same craft shaped the timber fixturing at Drake's on Savile Row.
4. Specialist finishes by trained hands
Decorative paint, plaster, stone, panelling and mirror work show every flaw. Ask who applies them, and how those people were trained for that exact finish.
5. Long-lead items ordered early
Stone, joinery, lighting and ironmongery can take months to arrive. Ask for a procurement schedule before work starts, with the order date for each long-lead piece.
6. Your building, the lease and the neighbours
Prime addresses come with managing agents, building rules and limits on working hours. In a leasehold flat the freeholder's consent is needed too; our guide to the licence for alterations explains it. Ask how the studio plans noise, lifts, deliveries and protection before day one.
7. One point of accountability
When the stone does not line up with the joinery, someone has to own it. Ask who answers for the design and the build, and whether that is one company or two.
8. A clear contract, then a real handover
Ask for the services, fee basis and extras in writing before any design starts. The British Institute of Interior Design publishes project stages and a domestic contract with RIBA for interior design. Ask too how snagging is handled and what aftercare follows.
How the main types of interior studio compare
Typical patterns, not judgements on any one studio.
| Type of studio | Best for | Watch for |
|---|---|---|
| Interior design studio | A particular designer's style | Tender coming back over budget |
| Architect-led practice | Major remodelling, listed houses | Fees and programme |
| Luxury fit-out contractor | Owners with a finished design | Design gaps left to the site |
| Project management company | A representative on a large house | An extra layer of fees |
| Design and build (Craftex) | Design, cost and build decided together | Whether our work matches your taste |
Most prime London homes sit between two of these. A studio may design and then manage a builder it trusts. A contractor may employ its own designers. Ask each one where its own staff stop and its subcontractors start, because that line decides who fixes a problem on site.
What our high-end homes show
Three prime London homes, each designed, priced and built by one team.
Kensington Olympia penthouse
The Kensington Olympia penthouse is 400 sq m. We designed and refurbished it in 12 weeks as main contractor, while the rest of the building stayed occupied. More than 1,000 m² of walls and ceilings were redecorated, including Italian decorative paint by decorators trained for the finish. We added bespoke wardrobes and a new dressing room.
Herbert Crescent, Knightsbridge
At Herbert Crescent, a 450 m² house with neighbours on every side, we managed every specialist trade directly, the bespoke joinery included. Each layout, finish and fixing was agreed from drawings and samples before it was built. The work took 32 weeks.
Pan Peninsula penthouse, Canary Wharf
The Pan Peninsula penthouse is 290 sq m in a tower full of residents. We redesigned and rebuilt it in 10 weeks, on time and within the allocated budget, working with the building's management team throughout.
The same finish standard beyond homes
Medusa in Knightsbridge is a spa, not a home, but it shows the same discipline. It reached us at RIBA Stage 2; we completed the design and built it as one team. We trained our own decorators in its blue and purple Valpaint.
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations. The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner. I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.
When another studio suits you better
We are not the best choice for every home. These are the cases where we would point you elsewhere.
- Furnishing and styling only. If you do not need building work, a styling studio is the right choice.
- You love one designer's signature style. Hire that designer, then a build-only contractor.
- Major structural change to a listed house. Where heritage consent drives everything, start with an architect-led team.
- A single room refresh. A decorator will serve you faster for paint, paper and soft furnishings alone.
How to choose in five steps
- Decide which of the three buying routes suits you.
- Look at finished homes, in person if you can, not only renders.
- Ask who makes the joinery and who applies the specialist finishes.
- Ask when you will get a real build cost, and how it is held during design.
- Meet the people who will run your site, and ask about your building, the lease and aftercare.
Read our guides to luxury home design costs and what an interior designer costs to set the budget. Then see our high-end interior design service and our high-end residential architecture work. When you are ready, book a free design consultation and we will walk the rooms with you.