Skip to content
Request a callbackCallback

For developers and investors buying sites

Development Site for Sale? Why the Agent's Numbers Rarely Match the Real Ones

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 9 min read

Aerial view of a busy city development site with tower cranes beside a road

The short answer

A development site for sale is marketed to get the highest price for the seller. The sales pack is built to look good, so the real numbers are usually worse.

  1. The selling agent works for the seller and is usually paid on the price achieved.
  2. Packs often use top-end sales values, the most units and a generic build rate.
  3. Abnormal costs, planning obligations and a realistic programme are often missing.
  4. Cost the scheme yourself, with builders, before you agree a price.

Every development site for sale comes with a story. A glossy pack, a set of drawings, a unit count and a profit figure that makes the price look fair. Many buyers take that story as the starting point. Some never test it.

We develop and build in London, and we often see a site after the buyer has agreed a price. Too often the real numbers do not work. This guide explains why the pack and the real numbers differ. It also shows where development land for sale in London and the UK really comes from.

Looking at a site right now? Book a site visit and we will cost it before you commit. Want sites found and tested for you? We find and test development sites for sale for the buyer, not the seller.

Who the sales pack is written for

Start with the incentives. They explain almost everything that follows.

  1. The selling agent works for the seller. Their job is the best price and terms for their client. That is not dishonest. It is the job.
  2. The agent's fee is usually linked to the sale. A higher price, sooner, is better for them too.
  3. The pack is marketing. It is written to attract bids. It is not a valuation for you, and usually says so in the small print.
  4. The buyer is often in a hurry. Bids, best-and-final rounds and short exclusivity periods leave little time to check. In a best-and-final round, each shortlisted buyer makes one last bid. An exclusivity period is a short window when the seller deals with you alone.

None of this makes the agent a villain. It means nobody on the selling side is paid to find the problems for you. That is your job, or the job of people you appoint. For someone on your side from the search onwards, our development land sourcing service finds and tests sites for the buyer.

Development site for sale: six ways the numbers flatter the deal

These are the gaps we see most often when we rebuild a seller's appraisal. Each one has an honest reason to exist. Each one moves risk to the buyer.

  1. "Up to" sales values. The pack takes the best recent sale nearby and applies it to every unit. Real values vary by floor, aspect, size and timing.
  2. The most units, not the likely units. The unit count assumes the council accepts the densest scheme. Pre-app comments, space standards or a second staircase can reduce it.
  3. A generic build rate. A cost per square metre from a different type of building, or from a year ago. It rarely includes the site's own problems.
  4. No abnormal costs. Demolition, poor ground, party walls, utilities and access are left out or shown as small round numbers.
  5. Planning obligations underplayed. Section 106 contributions, affordable housing and CIL are missing, estimated low, or "subject to negotiation".
  6. A short programme. A short build looks cheap to finance. Real programmes include design, approvals, procurement and any building safety gateways.

The pack vs the real numbers: an illustration

Illustration only: a sales pack appraisal vs the same site re-costed
Sales packRe-costed
Number of flats1412
Sales value (GDV)£8,000,000£7,200,000
Build cost£3,200,000£3,700,000
Abnormal costs£0£400,000
Fees, obligations, finance and sales£1,400,000£1,600,000
Developer profit at 15% of GDV£1,200,000£1,080,000
Land value that leaves that profit£2,200,000£420,000

The seller asks £2,200,000, which looks fair on the pack. On the re-costed numbers, the land is worth about £420,000 to a buyer who wants a 15% profit. Pay the asking price, and on these numbers you lose about £700,000.

National planning guidance says 15% to 20% of gross development value may be considered a suitable developer return for plan making. It also says the price paid for land does not excuse failing to meet planning policy. Overpay, and the loss is yours.

For the method behind this table, read our guide to development appraisal and residual land value. To run your own first figures, use our land value calculator.

Why build costs are where most packs go wrong

The sales value is easy to check. You can look at recent sales. The build cost is harder, and that is where most packs are weakest.

Office buildings and tower cranes on the River Thames in London

Agents and many valuers are not builders. They use a cost per square metre from published data or from another scheme. A builder prices this building, on this site, today. Our Allitsen Road feasibility study shows that done on a derelict St John's Wood club.

  1. Materials still move. The government's material price index was up 6.4% in August 2026 on a year earlier. Fabricated structural steel was up 21.2%.
  2. London sites cost more to run. Access, deliveries, neighbours, cranes and welfare all cost money.
  3. Building safety adds design and time. Taller residential buildings need Building Safety Regulator approval before work starts.
  4. The design is not finished. Planning drawings leave out the structure, services and details that a builder must price.

Our guide to abnormal costs in construction goes through the items that most often break a deal. For the wider picture, see why construction is so expensive in the UK.

Red flags in a development site sales pack

None of these mean "walk away". Each one means "check before you bid".

  • The appraisal has no build cost breakdown, just one total.
  • There is no line for abnormal costs, or no contingency.
  • Sales values are quoted as "up to" or from one sale only.
  • The unit count is based on a scheme that has not been to pre-application advice.
  • The planning permission is close to its time limit, with no proof of a lawful start.
  • Section 106 and CIL are "to be confirmed".
  • You are given days, not weeks, to bid.

How to check a development site before you bid

  1. Get everything the seller has. Title, planning documents, surveys, the appraisal and any pre-app response.
  2. Visit with a builder, not just a surveyor. Access, neighbours, ground and the existing structure all change the price.
  3. Rebuild the appraisal yourself. Use realistic sales values for each unit type, not the best one.
  4. Price the build properly. Element by element, with abnormal costs and a contingency, usually 5% to 10% of construction cost.
  5. Add the real programme. Design, approvals, procurement, building and sales, then finance on the whole period.
  6. Set your maximum price, then bid below it. Do not let a deadline move your ceiling.

Our development site due diligence checklist covers the legal and technical checks. If you are choosing between a site with planning and one without, read buying land with or without planning permission.

Where development land for sale actually comes from in London and the UK

Most buyers start on the portals. So does every other buyer, so the price is set by the most optimistic bidder in the room. Development land for sale in London and the UK reaches buyers by five routes. The best sites rarely take the first one.

  1. Agents' listings. Marketed sites with a pack, a guide price and a bid deadline. The widest choice, the most competition and the least time to check.
  2. Auctions. Fast and certain, but you exchange on the day. Every check happens before the room, on the legal pack, at your own cost.
  3. Receivers and administrators. Sites sold to repay a lender, often with a stalled scheme. Sold as seen, on a short timetable, with little history offered.
  4. Public bodies. Councils, health bodies and government departments sell surplus land. The process is formal and usually carries conditions on what gets built.
  5. Off-market. Owners who would sell at the right price but never list. The neighbour of a live project, a landlord with a tired building, a family with a plot.

Off-market sites move through people who are already building nearby. We are active on projects across London and the UK, so these deals come to us, and we usually have some on the table. Our development land and site sourcing service puts that deal flow on the buyer's side.

For the whole buying process, read our guide to land acquisition for development. Looking at an existing building rather than land? See how to add value to investment property in London.

Development land for sale with planning permission vs without

With planning permission, the pack has a consented scheme behind it. The unit count and the sales value are easier to test, and the price usually reflects that. Check the conditions, the Section 106 agreement, the CIL liability and the time limit before you rely on it.

Without planning, the price is lower and the planning risk is yours. The value sits in the scheme the council will accept, not the one in the pack. We advise on the chance of getting planning before you bid, and we price the scheme that chance supports.

I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away. We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP. We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care. We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

Lia Lavryk, Google reviewSee all reviews on Google

Property development sites for sale: the six-point check before you bid

Whether the site came from a portal, a receiver or a neighbour, the same six checks apply. Each one closes one of the gaps above.

  1. Sales values per unit type. Evidence for each flat size and floor, not the best sale nearby.
  2. The likely unit count. The scheme the council will accept, after space standards, daylight and any second staircase.
  3. A builder's cost for this building. Priced element by element, on this site, at today's prices.
  4. Abnormal costs in their own line. Demolition, ground, party walls, utilities and access, each with a figure.
  5. Planning obligations as numbers. Section 106, affordable housing and CIL, estimated before you bid, not after.
  6. The full programme and the finance on it. Design, approvals, procurement, build and sales, then interest on the whole period.

Pass all six and the site may still be a poor buy at the asking price. Fail one and you know what to negotiate on.

How we source and test a site for buyers

We act for the buyer, never the seller. Tell us what you are looking for: the area, the size, with or without planning, and your budget as GDV. We work on schemes from £3M to £150M GDV. We find the site, including off-market, and then test it before you bid.

The test is a development appraisal and feasibility study run as your representative. It covers the real sales values, a builder's cost, the planning chance where there is no consent, and every risk. Then we negotiate the terms on your behalf, agreed deal by deal. Come with proof of funds, so we can move the day a site appears.

Where we fit

We sit on the buyer's side of the table. Our team covers planning, design, development management and construction, and around 60% of our labour is in-house. So when we cost a site, we price it the way we would build it.

  1. Before you buy: we visit, test design options, cost the scheme and run the appraisal through our feasibility and viability assessment service.
  2. After you buy: we can run the development and the build as one team, on an open book, where you see every cost we pay. See our cost plus contract guide.
  3. Our terms. On a full-cycle project we build at cost plus 5% and charge from 20% of the development profit, depending on the agreement.

Because part of our reward is a share of the profit, a site that does not work is bad for us too. We would rather tell you not to buy it.

A development site for sale is only a good buy at the right price. The right price comes from real costs, not from the pack. Before you bid, book a site visit and we will show you the real numbers.

Frequently asked questions

How do I value a development site?

Work back from the finished scheme. Take the realistic sales value, then deduct build cost, fees, finance, planning obligations, sales costs and a fair profit. What is left is what the land is worth to you. This is the residual method.

Can I trust the appraisal in an agent's sales pack?

Treat it as marketing, not advice. It is prepared for the seller, often with optimistic sales values and a generic build cost. Use it to understand the opportunity, then rebuild the numbers yourself with independent costs.

Who does the selling agent work for?

The seller. The agent's job is to achieve the best price and terms for the seller, and their fee is usually linked to the sale. They are not acting for you, however helpful they are.

Is property development still profitable in the UK?

It can be, but margins are sensitive. National planning guidance says 15% to 20% of gross development value may be considered a suitable developer return for plan making. A small rise in build cost can remove most of that.

What costs are usually missing from a development appraisal?

Abnormal costs such as demolition, poor ground, party wall work and utility upgrades. Also planning obligations, building safety requirements, a realistic programme, finance on the full period and a proper contingency.

Where can I find development land for sale in London?

Agents' listings and the portals show the marketed sites. Auctions and receivers' sales add the distressed ones. Councils and other public bodies sell surplus land through formal processes. The best London sites often never reach a portal: they move off-market through people already building nearby. Fix your brief and your maximum price first, then look at every route at once.

Do you have development land for sale?

We do not sell land. We act for the buyer. Because we are active on projects across London and the UK, off-market sites come to us through the people we work with, and we usually have deals on the table. Tell us your brief and your budget as GDV, with proof of funds, and we will say what we have right now.

Thinking of buying a site? Get it costed first.

Book a site visit. We test the agent's appraisal against real build costs and tell you the most you should pay.

WhatsApp us