Office Fit Out in Bristol
Your Bristol floor plan checked free for cost and timing, then designed and built in time for your move.
Our track record
100% of projects delivered aheadof programme and on budget
What our clients get
- 3 weeksto turn a run-down 750 sq m office into open-plan workspace, inside a five-week lease deadline
- 7 monthson site at Portsoken House with the tenants working in the building throughout
- 60%of the labour on our sites is our own, so the programme never waits on another firm
- £10Mpublic and employers' liability cover on every job we run
Fitting out a Bristol office when Grade A space is scarce
Savills puts Bristol's Grade A vacancy at just 1.0% in early 2026. Second-hand floors make up 61% of the office space on offer.
So most moves here start with a tired floor that has to feel new by a fixed date. That is the job we are built for.
Send us the plan and a director checks the cost and the timing free. Then one team designs it, builds it and hands it over complete.
A floor plan helps, but the address, the floor size and your move date are enough to begin.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Everything a Bristol office needs, under one contract
Six parts of one fit-out, priced and run together, whether you are moving in or staying put.
Office design and space planning
A layout drawn from how your teams actually work, with room to grow before the lease ends. Proof: Portsoken House was designed by our in-house team.
Cat A and Cat B fit-out
From a bare shell to finished desks: ceilings, floors, partitions and finishes, ready for the first morning. Proof: Beaumont House went from run-down to open plan.
Refurbishment while you stay
Your floor reworked zone by zone, with noisy trades booked for evenings and weekends. Proof: Portsoken House stayed let throughout seven months of works.
Electrics, lighting, cooling and data
Power, lighting, air conditioning, fire alarms and data cabling, tested and certified. Proof: at Beaumont House we ran data under the floor to every workstation.
Reception, meeting rooms and joinery
The first room a client sees, glass meeting rooms and bespoke joinery made to last. Proof: Portsoken House Reception, finished in Italian stone.
Move management and furniture
Desks, chairs and the move itself planned with the build, so the team arrives to a working office. Proof: we moved more than 150 Beaumont House staff in.
How it works
How your Bristol office fit-out runs
01
Free plan check
Send the floor plan and your move date. A director calls back with the cost drivers and a view on whether the date holds.
02
Survey and design
We walk the floor with you, then agree the layout, the specification and a programme worked back from your date.
03
Licence and approvals
We prepare the drawings and specifications your landlord's surveyor needs, plus the full plans application Bristol City Council requires for offices.
04
Build around your team
Our own trades do most of the work. Dusty and noisy tasks wait until evenings and weekends.
05
Handover and move-in
Every system tested, the snag list closed, the file complete, and your people at their desks.
The Craftex Guide to Office Fit-Out
For anyone planning a Bristol office move or refit: the stages, what moves the cost, and a checklist that protects your move-in date.
Our promises
Six promises for your Bristol office, written into the contract
The terms we build to on a Bristol floor are the terms we build to in London.
-
One team from plan to keys
Design and build sit in a single contract, so the layout you approve is the one we deliver.
Portsoken House, drawn in-house and built by us.
-
Your figure holds
Nothing outside the agreed scope is built until you have approved its cost in writing.
Every project to date finished on budget.
-
Work carries on
Finished zones come back to you one at a time, and quiet hours are agreed before we start.
Portsoken House Reception, rebuilt overnight while tenants worked.
-
Ready for your move
Most people on site are our own employees, so no week is lost waiting for another firm.
Beaumont House, where other contractors had quoted at least 12 weeks.
-
Insured to £10M
£10M of public liability and £10M of employers' liability, with professional indemnity available on request. Accredited by CHAS, SafeContractor and Constructionline.
-
Handed over finished
No snag list follows you into the new office; certificates, manuals and drawings arrive with the keys.
Zero-snag handovers on every project so far.
Already have a quote? Send it to us. We'll beat it.
Holding a fit-out quote for your Bristol office? Send it over. A director reads every line and replies with what he finds. Our own figure follows a survey.
Compare your quotes
Where Bristol office fit-outs usually go wrong, and what we do instead
Six places where a Bristol office fit-out loses time or money, each paired with how we avoid it.
| Area | The usual risk | With Craftex |
|---|---|---|
| Who answers | A designer and a separate builder, each blaming the other's drawings when something is missed. | We own the design and the build, so every problem is ours to fix. |
| The bill | Extras that only appear once the old ceilings and partitions are stripped out. | We open up and survey before pricing, and any change is costed and signed off first. |
| Your staff | People working through drilling and dust, or sent home for weeks. | The building is phased so desks stay usable and loud work happens out of hours. |
| The date | Days lost while the contractor waits for subcontractors to turn up. | Around 60% of the labour is ours, so the programme does not hang on other firms. |
| Approvals | A full plans application filed late, and a landlord licence still unsigned on start day. | Council application, landlord drawings, fire alarm and electrical sign-off all run by us from week one. |
| The keys | Moving in to a defects list, with warranties and test results promised for later. | O&M manuals, as-built drawings and test certificates handed over on the last day. |
Office fit out cost in Bristol, 2026
Guide rates for a typical 10,000 sq ft office floor, before VAT and fees, with no London uplift added. Your own figure follows a survey.
| Item | What it covers | Low to high spec |
|---|---|---|
| Construction (Cat B) | Partitions, ceilings, floors, kitchen, finishes and changes to services | £63–108/sq ft (£678–1,165/m²) |
| Furniture | Desks, seating, meeting and breakout furniture | £18–54/sq ft |
| AV and IT | Meeting-room screens, conferencing and data points | £4.50–13.50/sq ft |
| All in | Construction, furniture, AV and IT together | £85.50–176/sq ft (£920–1,890/m²) |
| Fit-outs we take on | One floor or a whole building | £100,000 to £10M+ |
Assumes a Cat A floor with base services in good order. A bare shell, a listed building or out-of-hours phasing all add to the figure.
Dated 29 Oct 2026.
Free cost calculator
What will your Bristol office fit-out cost?
Enter the floor size or your headcount, choose a finish, and see a range at once.
Office projects that show how we work
- Beaumont House, Kensington A £350K open-plan rebuild delivered in three weeks, where other contractors had asked for twelve. View case study
- Portsoken House, Aldgate A full office fit-out: 1,550 sq m of premium offices for £2.2M, with tenants in occupation. View case study
- Portsoken House Reception, Aldgate A £450K entrance in stone and bespoke joinery, rebuilt through the night in 12 weeks. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Office fit-out in Bristol: your questions
Do you fit out offices in Bristol if you are based in London?
Yes, on selected projects. Bristol jobs are led by the senior team behind our London work, with a dedicated site lead and one point of contact. We take on office fit out across the UK, always after surveying the floor in person.
How long does an office fit out take?
Your date is fixed in the contract once the survey is done. As a guide, a 750 sq m Kensington office took us three weeks, including moving more than 150 staff. Allow extra weeks beforehand for the landlord's licence.
Does an office fit out in Bristol need building regulations approval?
Usually, yes. Bristol City Council requires a full plans application for office works and aims to decide within five weeks. A listed building may also need listed building consent. See building regulations for an office fit-out.
What is the difference between Cat A and Cat B?
Cat A leaves a floor usable but empty: ceilings, raised floors, lighting, heating and cooling. Cat B makes it yours with rooms, kitchens, finishes and furniture. Here is Cat A and Cat B fit-out explained in full.
Do you fit out shops, restaurants and other premises in Bristol?
Offices are our focus here, but one contract can cover other commercial space too. See commercial fit-out and refurbishment, restaurant and bar fit-out, warehouse fit-out and home renovation.
How much does an office fit out cost in Bristol?
Expect roughly £63 to £108 per sq ft for the Cat B works, with furniture and AV on top, ex VAT. We take on fit-outs worth anything from £100,000 to well over £10M.
Can we keep working while our office is refurbished?
Yes. We split the floor into zones, keep desks usable and book the noisiest trades for evenings and weekends. Read our notes on refurbishing an office while you work in it.
Do we need our landlord's consent?
Almost always. Most leases require a licence for alterations before work begins, and the landlord's surveyor will want drawings and a method. We produce that pack as part of the design stage.
What happens in the free cost and programme check?
A director reviews your plan, floor size and move date, then calls to say what drives the cost and what could put the date at risk. It costs nothing and commits you to nothing. A written figure follows a site survey.
Which parts of Bristol and the South West do you cover?
The city centre, Temple Quarter, Harbourside, Redcliffe and the north fringe business parks, plus nearby towns. We also cover Bath, Cheltenham, Oxford and Reading.
Read before you start
What an office fit-out really costs, how a landlord's fit-out contribution works and common problems in office design and fit-out. Strip-out behind retained facades: Slingsby Place, Covent Garden, led by Martin Hickey as Project Director. Bespoke joinery on a prime home: Kensington Olympia. Related service: Office fit out in London and the UK.
What our clients say
See all reviews on Google-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Moving or refitting an office in Bristol?
Tell us the address, the floor size and the date you need to be in. A director looks at it and calls you back.



























