Best Commercial to Residential Contractors: How to Choose

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Mid-rise brick-clad office building with rooftop glazing on a London street corner

The short answer

The best commercial to residential conversion contractor shows you the planning route, the homes the building will really take and a build price before you commit. Then it delivers all three.

  1. Ask which planning route it would use for your building.
  2. Ask for a schedule of homes with sizes, not just a unit count.
  3. Ask who on the team runs the development appraisal.
  4. Ask to see a finished residential project by the same team.

Converting offices, shops or pubs into homes is not a fit-out. It changes the planning use. It brings in the Building Regulations for new homes. And it lives or dies on the value of the finished flats. So choosing a conversion contractor is closer to choosing a development partner than a builder.

This guide sets out how to choose commercial to residential conversion contractors. It covers seven checks, the main types of firm and where we fit. For the process itself, read our commercial to residential conversion guide. Own a building that could become homes? Book a site visit and we'll walk it with you.

Three ways to buy a conversion

First decide how much of the scheme you want to keep. That decides which kind of partner you need.

How to buy a commercial to residential conversion
You want toThe partner you needWhat you keep
Fund the scheme and just get it builtA conversion contractor, ideally design and buildThe building, all the profit and all the risk
Keep the building but hand over planning, design and deliveryA development manager on a fee, or a developer-contractorThe profit, less the fee
Share or pass on the riskA developer-partner that co-invests or buysA share, or a price

Craftex works in all three ways. Depending on the stage, we can co-invest, take 100% of the risk, or work on a percentage or fee basis.

Seven checks for commercial to residential conversion contractors

Each check is a question the contractor should answer before you sign anything.

Bare concrete floor stripped back to the shell, with props and scaffold by the windows

1. Which planning route would it use?

A conversion needs full planning permission or Class MA prior approval. Class MA needs the building to have been in a commercial use for at least two years. Natural light in every habitable room is assessed. Many London boroughs restrict it with Article 4 directions.

If a contractor can't explain its route, it is a builder, not a conversion specialist. See our permitted development team and our change of use team pages.

2. Will the homes meet the standards?

New homes from a conversion must meet the nationally described space standards. Light is a recurring issue in deep office floors. Ask for a schedule of homes with each flat's size and outlook. Our guide to space standards for flats explains the minimums.

3. Does it know the rules for new homes?

A change to homes is a material change of use. Fire separation, escape, sound, ventilation and energy must all reach the standard for new homes.

Taller buildings bring a separate regime. A building of 18 metres or 7 storeys with two or more homes is a higher-risk building. Read our guide to Gateway 2 and the second staircase.

4. Has it surveyed the structure?

Floor heights, column grids, risers and façades decide where flats, bathrooms and stairs can go. A contractor should survey and test this before it promises a layout.

5. Who runs the numbers?

A conversion only works if the finished value covers purchase, build, fees, finance and a profit. Ask who on the team runs the appraisal. Our guide to GDV and residual land value shows how the numbers work.

6. Has it thought about VAT?

Some conversion works can qualify for reduced VAT rates. The structure you buy and sell through matters too. Take advice early, and read VAT on commercial to residential conversions.

7. Can it finish homes, not just offices?

Offices are built to be durable. Homes are judged by buyers on detail. Ask to see a finished residential project by the same team.

How the main types of conversion contractor compare

These are typical patterns, not verdicts on any firm.

Types of conversion contractor compared
TypeStrong onUsually left to you
General builderBuilding what is drawnPlanning, unit mix and viability
Permitted development specialistPrior approval routesVaries; often unit count over quality
Architect or planning consultantPlanning and designThe build and its price
Large residential contractorBig schemesPlanning, appraisal and exit, via your consultants
Developer-contractorAppraisal, planning, design and build in one teamCheck its record on your building type

Why a housebuilder's view matters on a conversion

A conversion succeeds or fails on the homes at the end. Their size, layout, light and price decide it. That is a housebuilder's question, not a fit-out contractor's.

Rob Barton, our Development Director, spent over 20 years as a managing director and land director at plc housebuilders. In those roles he delivered more than 4,000 homes and took planning for over 10,000. These were his previous roles, not Craftex projects.

On a conversion, that shows up early: in the unit mix, the price of each flat and the exit plan.

Martin Hickey, our Preconstruction Director, brings more than 50 years in construction. Joe Crawford, our Operations Director, brings 37 years, including residential work in Belgravia in earlier roles.

Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

Misha Levit, Google reviewSee all reviews on Google

What we can show you

These projects show the planning, structural and finish skills a conversion needs.

  1. Allitsen Road, St John's Wood. A vacant four-storey corner building in a conservation area, once a pub. We tested four options against policy and space standards, up to seven flats. It is a feasibility study, not yet built.
  2. Portsoken House, Aldgate. A full office fit-out of 1,550 sq m on two floors, with the rest of the building let. It cost £2.2M and took seven months, around occupied floors.
  3. Drake's railway arch. Nothing could be fixed to the arch, so we built a self-supported interior. 500 sq m in eight weeks, for £200K.
  4. Kensington Olympia penthouse. For residential finish: a £550K, 400 sq m penthouse designed and refurbished in 12 weeks, while every other flat in the building was lived in.
  5. Leicester One. Outside London, Craftex took part in this £3.9M, 56-room student residence.

Where Craftex is not the right fit

  1. A single flat over a shop, or under £100,000 of build. A local builder with a good architect will usually serve you better.
  2. Planning only. If you need nothing more than an application, a planning consultant is the direct route.
  3. A large high-rise where your funder requires a national contractor. We'll tell you if a scheme is bigger than we should take on.

Our conversion cost guide explains what drives the price. For the whole service, see commercial to residential conversion. If you're comparing conversion contractors now, book a site visit and test us against these checks.

Frequently asked questions

How do I choose a commercial to residential conversion contractor?

Ask each firm which planning route it would use, how many homes the building will take and at what size, who runs the development appraisal, and to see finished projects. Compare the answers before you compare prices.

Do I need planning permission to convert offices to flats?

Either full planning permission or, where it applies, prior approval under Class MA permitted development. Class MA needs the building to have been in a commercial use for at least two years, and natural light in every habitable room is assessed. Many London boroughs restrict it with Article 4 directions.

Do converted flats have to meet space standards?

Yes. Homes created through a conversion need to meet the nationally described space standards, and adequate natural light is a common condition.

How much does a commercial to residential conversion cost?

It depends on the structure, the planning route, the number of homes and the specification. We don't publish a rate per square metre because it misleads on conversions. Our conversion cost guide explains what drives the number.

Can Craftex take on the whole conversion, not just the build?

Yes. We can appraise the building, design it, take it through planning, build it and help with the exit. Depending on the stage we can co-invest, take 100% of the risk, or work on a percentage or fee basis.

Does Craftex work on conversions outside London?

Yes. We work with owners and developers in London and across the UK, on development schemes from £3M to £150M GDV.

Thinking of converting offices, a shop or a pub into flats?

Our development and construction team checks the planning route, structure and value on site, then gives you options before you spend on drawings. Book a site visit.