Value-Add Commercial Refurbishment: A Strategy Guide for London Owners
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
A value-add commercial refurbishment buys or holds an underperforming building, fixes what holds it back, and re-lets or sells it as a better asset. It only works if the gap is real and the works are priced and delivered to plan.
- The levers: better floors, a better EPC, a better arrival, a better use or mix.
- The plan rests on five numbers: price, capital spend, time, holding costs and end value.
- Survey and open up the building before the price is fixed.
- Programme is part of the return: every empty month costs money.
In London the classic value-add building is a tired 1980s or 1990s office. Dated services, a poor energy rating, a reception nobody remembers. It sits next door to buildings that let well. The question for an owner is not whether to spend money. It is which money, in what order, and how much of the building to keep.
This guide covers the levers of a value-add commercial refurbishment, the business plan and the construction decisions that make or break it. It is general information, not investment advice, and it promises no returns.
Where a tenant is leaving, the plan often starts with lease-end works. Looking at a building now? Book a site visit and we'll survey it with you before you commit.
Where value-add commercial refurbishment sits among strategies
Investors describe property strategies on a scale of risk and work.
| Strategy | What the asset is like | Typical work needed |
|---|---|---|
| Core | Well let, good condition, good location | Little beyond maintenance |
| Core-plus | Good asset with a small fixable issue | Light refurbishment, lease work |
| Value-add | Under-let, dated or partly empty | Significant refurbishment, re-letting, sometimes a new use |
| Opportunistic | Vacant, obsolete or a development site | Redevelopment or new build |
Value-add is the middle of the scale. Most of its risk sits in the works and the re-letting. That is why the construction side deserves more attention than it usually gets in the business plan.
The five levers that create value
1. Bring the floors up to what occupiers expect
Occupiers look for open, bright floors with modern services, daylight and fresh air. A Category A refurbishment is the usual start: ceilings, lighting, raised floors where needed, air conditioning and finishes. Our guide to Cat A, Cat A+ and Cat B fit-out explains the levels.
2. Fix the energy rating
Under the Minimum Energy Efficiency Standards, a landlord can't continue to let a commercial building rated F or G unless an exemption applies. In June 2026 the government proposed EPC B from 2031 for rented buildings over 1,000 m², where cost-effective. Smaller buildings stay at the current minimum for now.
It is a proposal, not law yet: it still needs legislation.
A poor rating makes a building hard to let, finance and sell. Upgrades usually mean new heating and cooling, LED lighting with controls, better glazing or insulation. See our sustainable and low-carbon fit-out work, and how the brown discount hits inefficient buildings.
3. Rework the arrival
The entrance and common parts are what a prospective tenant sees first. At Portsoken House in Aldgate we rebuilt a 70 sq m reception in 12 weeks. We worked overnight so tenants were not disrupted. Read the Portsoken House reception case study.
4. Change the use or the mix
Since 1 September 2020, offices, shops, restaurants, gyms, clinics and similar uses sit together in Use Class E. Many changes between them no longer need planning permission. Bigger shifts, such as offices to homes, need prior approval or full planning. Confirm the change of use planning route before the plan relies on it.
5. Reposition the asset
Repositioning changes who the building is for. A secondary office becomes flexible studio space, or a single-let building is split for smaller occupiers. Portsoken House was a full office fit-out from scratch. Our in-house team designed and delivered 1,550 sq m of premium offices in seven months. See the Portsoken House case study.
When the answer is more than refurbishment, look at property development.
The business plan in five numbers
Every value-add plan rests on five figures. If any is a guess, the plan is a guess.
- The price or current value of the building as it stands.
- The capital spend: works, fees, statutory costs, contingency and finance during the works. Part of it may come back as capital allowances on commercial property.
- The time: design, consents, the works and the letting period.
- The holding costs while empty: rates, insurance, security and service charge shortfall. See business rates on empty commercial property.
- The value after the works, from comparable evidence, not hope.
A contractor can give you the second and third numbers with confidence only after a survey. So bring one in before the purchase is final, not after.
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Construction decisions that decide the outcome
Survey and open up early
Older commercial buildings hide things: asbestos, tired risers, undersized power, structure that doesn't match the drawings. A refurbishment and demolition asbestos survey is needed before refurbishment work starts. A short period of opening up, ideally before the price is fixed, turns unknowns into scope.
Strip out first, decide second
An early soft strip shows what is really there and cuts risk in the main contract. It also gives agents a clean floor to show.
Plan around tenants who stay
Many value-add buildings are partly let. Noisy work out of hours, phased floors, protected routes and clear notice keep existing income in place. At Portsoken House we worked nights and weekends around the tenants.
Pick the right contract
For a clear brief and a tight programme, design and build gives one party responsibility for design and construction. Where the owner wants close control of design, a traditional route may suit. See design and build and turnkey contracting.
Keep a real contingency
Refurbishment has more unknowns than new build. A plan with no contingency for what's behind the walls is not a plan.
Speed matters more than most plans assume
Every empty month costs rates, insurance and lost rent. Programme is part of the return, not a construction detail.
At Beaumont House in High Street Kensington, a client had five weeks left on its lease. We turned 750 sq m of rundown office into an open-plan workplace in three weeks. More than 150 staff moved in, with zero snags. Read the Beaumont House case study.
Signs a building suits value-add, and signs it doesn't
Warning signs are the opposite. Look out for structure or façade problems, or a location where even good space doesn't let. Planning that blocks the plan's use is another. So is a works budget written before anyone surveyed the building.
When the warning signs win, a new use, redevelopment or a sale may be better. Our guide on how commercial refurbishment works covers the process stage by stage. We take on commercial fit-outs and refurbishments across London. Want real numbers before you buy? Book a site visit.
Good candidates
- Sound structure and location, let down by tired interiors or services.
- Floor plates that can be reconfigured without major structural work.
- Local evidence that refurbished space lets well.
- A clear route to a better EPC rating.