What Can I Build on My Land in London?

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read

Aerial view of housing, gardens and open land at the edge of a city

The short answer

In London you can build on your land whatever the council will grant planning permission for, or what a permitted development right allows. What the council will grant depends on five things you can check before paying an architect.

  1. Planning policy and the site's planning history.
  2. Designations: conservation area, listing, flood zone, trees, Article 4.
  3. Access for people, cars and fire engines, and who owns it.
  4. The neighbours' light and privacy, and whether the numbers work.

Most landowners start the wrong way round. They commission a design first. Then they find the site is in a conservation area. Or the access is too narrow for a fire engine. Or the scheme costs more to build than it is worth.

That is months and thousands spent on the wrong question. The right question comes first: what can I build on my land? In London the answer turns on five checks you can make before paying an architect. Have land or a building in mind? Book a site visit and we will run the five checks with you.

What you can build on your land: five checks

You can build what the council will grant planning permission for. You can also build what a permitted development right allows. Everything else is off the table.

What the council will grant depends on five things. Check them in this order and you will know what your land can take before design starts.

  1. Planning policy for your address and the planning history of the site.
  2. Designations on the land, such as a conservation area or listing.
  3. Access for people, cars and fire engines.
  4. The neighbours: light, privacy, outlook and legal rights.
  5. The numbers: whether the scheme is worth more than it costs.

Check 1: planning policy for your address

Every London site sits under three layers of policy. National policy, the London Plan and your borough's local plan decide what kind of development the council wants there.

For housing, the London Plan is broadly on your side. Its small sites policy covers sites of 0.25 hectares or less, especially near stations and town centres. Your local plan adds the detail: uses, density, heights, housing mix and design.

Look up two things first:

  1. Site allocations. If the local plan allocates your land for a use, that is the strongest start you can have.
  2. Planning history. Past decisions on your site and nearby show what officers accept. A refusal two doors down tells you more than any policy paragraph.

Check 2: designations on the land

Designations narrow what is possible. Some remove permitted development rights altogether.

Designations and what they mean for you
DesignationWhat it means
Conservation areaNew work must preserve or enhance the area; upward extension rights for new homes do not apply
Listed building on or next to the siteListed building consent for works to it; setting shapes height and design
Green Belt or Metropolitan Open LandNew building is strongly restricted
Flood zoneA flood risk assessment, and possibly no homes at ground level
Tree Preservation OrdersProtected trees and their roots can take a big bite out of a plot
Article 4 directionA permitted development right is removed, so full planning is needed
Protected viewsStrategic views cap heights in parts of London

All of these are on the council's planning map. Read them as constraints, not as a verdict. Plenty of good schemes are built in conservation areas, designed for it from day one.

Check 3: access for people, cars and fire engines

Access kills more small London sites than planning policy does. A plot behind houses can look generous on a map. It can still fail because the only way in is a narrow passage.

Building Regulations expect a fire engine to get close enough to reach every part of a new house. Bin collection has its own distance rules. If those cannot be met, the design needs sprinklers or other measures, or fewer homes.

Check who owns the access too. A strip between your plot and the road owned by someone else is a "ransom strip". It can put a price on your scheme you did not plan for.

I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away. We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP. We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care. We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

Lia Lavryk, Google reviewSee all reviews on Google

Check 4: the neighbours

New buildings must not unduly harm the people around them. In practice that means five tests.

  1. Daylight and sunlight to neighbouring windows and gardens, usually tested against BRE guidance.
  2. Overlooking and privacy, often judged on distances between facing windows.
  3. Outlook and enclosure, especially for rear gardens.
  4. Party walls, if you build on or near the boundary.
  5. Rights of light, a legal right a neighbour can enforce even after you have permission.

This is usually where the number of storeys and the footprint get decided.

Check 5: whether the numbers work

A scheme that gets permission but loses money is not a scheme. Before design goes far, ask three questions.

If you are buying a site rather than building on your own, use our development site due diligence checklist.

  1. What would the finished homes or space sell or let for? That is the gross development value.
  2. What does it cost to build, including fees, finance and the council's levies?
  3. What is left for the land once a developer's profit is allowed for?

That last figure is the residual land value. It is how developers price sites. Our plain-English guide to development appraisal, GDV and residual land value walks through it.

The planning routes, side by side

Once you know what is realistic, pick the route that gets it consented with the least risk.

Planning routes for land and buildings in London
RouteWhat it suitsGood to know
Full planning permissionMost new buildings, and anything in a conservation areaCouncils aim to decide minor schemes in 8 weeks and major ones in 13
Outline permissionTesting the principle and scale firstLayout, scale, appearance, access and landscaping follow later
Permission in principleHousing-led schemes below the major thresholdSettles the principle, then technical details consent
Permitted developmentSome buildings built 1948 to 2018, outside conservation areasPrior approval of set matters, not a full judgement
Change of useAn existing commercial building rather than empty landClass MA prior approval or full planning

For change of use, see Class MA and permitted development and converting a building's use. For anything beyond the routine, a pre-application enquiry gets the council's view first.

A real example: Allitsen Road, St John's Wood

Allitsen Road shows what this looks like on a real site. The building is a vacant four-storey corner building in the St John's Wood Conservation Area. It sits opposite two Grade II listed properties. It began as a pub, became a private members' club and fell into disrepair.

458 m²Existing floor area
4Design options tested
4 to 7Flats possible

The owner asked the question in this article's title. Our team developed four options rather than one answer. Each was tested against Westminster's City Plan, the London Plan, structure and space standards. The answer ranged from four flats to seven, decided by the basement and the roof. Read the Allitsen Road feasibility and design study.

When your land is bigger than you are

Sometimes your plot alone cannot take much, but your plot plus a neighbour's can. Combining sites changes access, frontage and density. That is site assembly, and it is worth asking about before you sell a plot someone else needs.

If your land is a back garden, a yard or a garage court, read our guide to backland, garden and garage sites in London. They have their own tests.

How our team helps landowners

We look at a site the way a developer and a builder would at the same time. A development feasibility study and site appraisal answers what can be built, what it would cost and what it would be worth. Our development schemes run from £3M to £150M GDV.

Once you know the answer, you can sell, take an option or promotion agreement, or partner with the facts in hand. Our land value uplift page explains how consent changes the number.

Want to know what your land could take before you pay for drawings? Book a site visit and we will walk the site with you.

Frequently asked questions

Do I need planning permission to build on my own land?

For a new home or building, almost always yes. Some existing buildings can add storeys or change use under permitted development rights, but those come with conditions and do not apply in conservation areas or to listed buildings. Owning the land gives you the right to apply, not the right to build.

Can I build a house in my garden in London?

Sometimes. It depends on access, the size of the plot, the effect on neighbours and the character of the street. Local plans often resist garden development that harms the character of an area, so the design has to be right.

How do I find out what my land is worth with planning?

Work out what could be built, what it would sell for and what it would cost to build, then allow for a developer's profit. What is left is roughly what a developer would pay. This is the residual land value.

How long does it take to find out what I can build?

A first view from the planning map, the history and a site visit comes quickly. A feasibility study with design options and costs takes longer. Councils aim to decide minor applications in 8 weeks and major ones in 13, once validated.

Is pre-application advice worth it?

For anything beyond a simple scheme, usually yes. It is not binding, but it tells you early what officers will and will not support.

What size of site do you work on?

Development schemes from £3M to £150M GDV. If your land alone falls below that, it may still be part of a larger assembled site, so it is worth asking.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Own land or a building in London with potential?

Send us the address. We visit, check the five things that decide what gets built and show you whether to sell, build or partner. Book a site visit.

WhatsApp us