Showroom Fit-Out in London: From Consents to Opening Day

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Timber display plinths, wall-hung rails and shelving in Drake's refitted Savile Row store

The short answer

A showroom fit-out turns a unit into a space built to display and sell products. In London, check the planning use, the shopfront and signage consents and the landlord's licence before the design is fixed.

  1. Most showrooms fall within Class E(a); car showrooms are outside Class E.
  2. A new shopfront or illuminated sign may need planning or advertisement consent.
  3. Confirm the floor loading before you place heavy products.
  4. Consents and long-lead joinery set the programme, not the building work.

A showroom has one job: make the product look its best and make buying it easy. The fit-out decides both. Shopfront, lighting, display joinery, floors, power and back-of-house all have to work together.

In London the consents usually take longer than the build. Opening or refitting a showroom? Book a site visit and we will check the unit with you.

Then design around the product. A sofa, a car, a kitchen and a suit each need different light, floors and space. We plan showrooms the way we plan a flagship store fit out: product first, then the route, the light and the joinery.

What kind of showroom fit-out you need in London

Showroom types, planning use and design priorities
Showroom typeTypical planning useDesign priorities
Brand showroom open to the public: fashion, furniture, lighting, kitchensClass E(a), display or retail sale of goodsShopfront, display lighting, flexible fixtures, customer flow
Trade or appointment-only showroom, often with officesClass E, often E(a) with E(g)(i) officesSample libraries, meeting rooms, AV, storage
Working showroom with live products: kitchens, bathrooms, appliancesClass E(a)Water, drainage, extraction, power to every display
Car showroomSui generis, outside Class EFloor loads, vehicle access, large glazing, workshop separation

Changing between uses inside Class E doesn't need planning permission. The exception is a condition on the building's permission that restricts it. A car showroom is different: selling or displaying motor vehicles sits outside the use classes. Our guide to Class E explains how the classes work.

Consents for the outside: shopfront and signs

The shopfront and signs are where most London showroom programmes lose time.

Shopfront. A new shopfront, or changes that materially alter the outside, normally need planning permission. In a conservation area the design is judged against the street. On a listed building, listed building consent is needed too.

Signs. Advertisements are controlled separately. Some signs on business premises have deemed consent, including illuminated signs within strict limits. Those rights are cut back in Areas of Special Control and in conservation areas. Signs on a listed building may need listed building consent. Showing a sign that needed consent without it can be a criminal offence.

On Savile Row we refitted Drake's flagship store with a new shopfront, bespoke timber fixtures and new lighting. The 120 sq m unit took 8 weeks on site after a 4-week design stage while the store stayed open. On a street like that, the consents and the neighbours shape the job as much as the design.

Consents for the inside: landlord and building regulations

  1. Licence for alterations. Most showroom units are leased. Anything beyond decoration usually needs the landlord's written consent. See our guide to the licence for alterations.
  2. Building regulations. New partitions affecting escape, structural openings, drainage, mezzanines and major electrical or heating work generally need approval.
  3. Accessibility. Under the Equality Act 2010, a business open to the public makes reasonable adjustments for disabled customers. Think level access, clear routes between displays and an accessible counter.
  4. Fire safety. The responsible person keeps the fire risk assessment current. Display layouts change escape routes, so the two go together.

Designing the showroom around the product

Lighting

Lighting sells the product. A showroom usually needs three layers. General light for the space, accent light on the product, and true-colour light where colour matters, such as fabric, timber or stone.

Plan track and power for the displays you will have in two years, not just on opening day. At Drake's, better lighting was one of the three changes that refreshed the flagship.

Power and data

Live displays need power at the display, not at the wall. Lamps, appliances, screens and kitchens all count. Floor boxes, ceiling drops or skirting trunking all work. Each must be decided before the floor and ceiling go in.

Floors and loads

Heavy products, stone samples and vehicles put real loads on the floor. Ask for the floor's design loading before you commit to a layout. Check upper floors and basements with special care. A raised platform can spread the load and hide the services.

Joinery and fixtures

Display joinery is the showroom. Bespoke pieces give the brand its look. Modular systems let you change the range without a refit. Most showrooms use a mix. Allow time for samples and approvals, because joinery is usually on the critical path.

Back of house

Stock, deliveries, staff space, toilets, a meeting room and a packing area all take floor space from the display. Plan them on day one.

We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

Ben Edell, Google reviewSee all reviews on Google

How a showroom fit-out programme usually runs

Showroom programme stages and what holds them up
StageWhat happensWhat can hold it up
Survey and briefSurvey, services and structure checked, product range agreedMissing landlord drawings, unknown floor loading
DesignLayout, lighting, joinery, shopfront and signs designed togetherLate changes to the product range
ConsentsPlanning, advertisement and listed building consent; landlord's licenceCouncil and landlord review periods
ProcurementJoinery, lighting, glazing and flooring orderedLong-lead bespoke and imported items
WorksStrip-out, services, shopfront, floors, ceilings, joinery, lightingRestricted hours and deliveries
HandoverSnagging, testing, product set-up, staff walk-throughProducts arriving before the space is ready

Consents and long-lead joinery are usually the critical path, not the building work. Start both as early as the design allows.

Fitting out next to live trade

Most London showrooms sit in streets and buildings that keep trading while you build.

  • Agree working hours and noisy work windows with the landlord and neighbours.
  • Book deliveries around loading rules and the street's peak hours.
  • Keep the pavement and neighbouring entrances clear, with hoarding where needed.
  • Phase the works if your own showroom stays open.

The same discipline works inside multi-let buildings. At Portsoken House in Aldgate we rebuilt a 70 sq m reception with Italian stone, bespoke joinery and a new shop window. We worked nights and weekends, so the building's tenants were never interrupted.

Showrooms and shopfronts are part of our commercial fit-out and refurbishment work. Our high-end interior design team handles the interiors where the brand needs it. For shops more widely, see our guide to retail fit-out in London.

We take on construction projects from £100,000. Book a site visit and we will tell you what the unit needs before you commit.

Showroom fit-out checklist

  • Planning use confirmed for your type of showroom, including any conditions.
  • Shopfront and signage consents identified and applied for early.
  • Listed building and conservation area status checked.
  • Licence for alterations agreed with the landlord.
  • Floor loading confirmed for your heaviest products.
  • Lighting designed in layers, with true-colour light where colour matters.
  • Power and data positioned for live displays.
  • Joinery samples and approvals inside the programme.
  • Back-of-house space planned from the start.
  • Working hours and deliveries agreed with neighbours.

Frequently asked questions

What is a showroom fit-out?

The design and building work that turns a unit into a space for displaying and selling products: shopfront, lighting, display joinery, floors, power and data, heating and cooling, meeting areas and back-of-house.

Do I need planning permission for a showroom?

Not to change between uses within Class E, which covers most showrooms, unless a planning condition restricts the use. A new shopfront or external changes normally need permission, and a car showroom is outside Class E.

Do I need consent for showroom signage?

Often. Some signs on business premises have deemed consent within strict limits, including some illuminated signs. Larger or more prominent signs, and signs in Areas of Special Control or on listed buildings, may need advertisement or listed building consent.

What use class is a car showroom?

Selling or displaying motor vehicles is sui generis. It sits outside Class E, so changing to or from it needs planning permission.

What lighting does a showroom need?

Usually three layers: general lighting for the space, accent lighting on the products and high colour-rendering light where true colour matters, with track and power placed so displays can change.

Can a showroom be fitted out while neighbouring shops keep trading?

Yes, with agreed working hours, deliveries outside peak trade, hoarding and clear pavements. On Savile Row, Drake's flagship store was refitted over 8 weeks on site while it stayed fully open.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Opening or refitting a showroom in London?

We survey the unit, confirm what consents it needs and deliver the shopfront, services and display joinery under one contract. Book a site visit.

WhatsApp us