Best Restaurant Fit-Out Companies London: How to Choose

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Commercial kitchen with stainless steel cooking line under a full-length extraction canopy

The short answer

The best restaurant fit-out company for a London site is one that has already solved the hard parts: the extract, the kitchen services, the landlord and the opening date. The dining room photos matter less.

  1. Ask how each firm handled extraction and kitchen services on its last two jobs.
  2. Agree in writing who coordinates the kitchen supplier with the builder.
  3. Check who prepares the landlord's pack and allows for licences in the programme.
  4. Visit a finished site and call the owner before you sign.

A beautiful dining room is the easy part of a restaurant fit-out. What delays London openings sits behind the kitchen wall or on the roof. So when you compare restaurant fit-out companies, look past the photos. Ask how each firm handled four hard things on its last two jobs.

This guide is written from that side of the table. We are London restaurant fit out contractors who design and build restaurants and pubs. We also say clearly when another kind of firm will do the job better. Got a unit in mind? Book a site visit before you sign the lease.

Four things decide which restaurant fit-out company you need

Every restaurant fit-out company shows finished rooms. Fewer can show how they solved these four. Use them as your interview.

1. Extraction, ventilation and odour

The kitchen extract is the most common cause of delay. The duct route, the discharge point, odour control and fan noise may all need the landlord's agreement. External ductwork or roof plant usually needs planning permission too.

A good firm looks at the extract route on the first site visit. Ideally that happens before you sign the lease.

2. Kitchen services

Gas, power, water, drainage and grease management must reach the right place at the right size. The kitchen supplier designs the cooking line. Somebody has to build the services that feed it.

The gas must also shut off if the ventilation fails. Ask who coordinates the supplier and the builder. Our restaurant kitchen fit-out guide goes into the detail.

3. The landlord, planning and licences

In a leased unit the landlord will want drawings, method statements and a licence for alterations before work starts. Restaurants and cafés sit in Class E. Pubs, bars and hot food takeaways sit outside it. So a change of use to those usually needs planning permission. Our guide to Class E explains the rules.

Selling alcohol, or serving hot food after 11pm, means a premises licence. Food businesses must register with the council at least 28 days before trading. None of this is the contractor's job alone. But the contractor's programme must allow for all of it.

4. The opening date

Rent is running, staff are hired and the launch is booked. Ask each firm for a programme that shows the long-lead items: extract fans, kitchen equipment and bespoke joinery. Ask what happens if one arrives late.

Our restaurant fit-out company builds that programme from the site survey, before you sign the lease.

How the main types of restaurant fit-out firm compare

Typical patterns, not judgements on any one firm. Every type has strong and weak firms in it.

Restaurant fit-out firm types compared
Type of firmUsually strongest atWatch for
National hospitality fit-out specialistChain roll-outs and standard detailsA team that travels in
Kitchen equipment supplier offering turnkeyThe cooking lineBuilding works and approvals left to others
Interior design studioConcept, brand and atmosphereDesign not priced until tender
Local general builderSmall, simple unitsExtraction and licensing experience
Design and build contractor (Craftex)One-off London sites, concept to openingNot set up for 30-site roll-outs

The cheapest firm on paper is often the one that leaves the extract, the landlord or the licences to you. Ask every firm the same question: what is not in your price?

Where Craftex is not the right fit

  1. Units well under £100,000. A small takeaway or café refresh is better value with a trusted local builder.
  2. National roll-outs. Opening the same format in 20 towns suits a specialist with regional teams.
  3. Equipment-only upgrades. If you only replace the cooking line, go straight to the kitchen supplier.

We take on construction projects from £100,000 to £10M and more. We don't take on small fast-food chains or low-budget refurbishments. Opening in Scotland? We also deliver restaurant fit-outs in Glasgow.

Projects that show how we protect an opening

Different venues, same lesson. The opening date, or the trading days, were protected before anyone picked up a tool.

Round room in the Drake's Savile Row shop with timber shelving, rails of jackets, plants and a central display table
Drake's, Savile Row: refitted in 12 weeks, open on every trading day.
12 weeksDrake's, Savile Row refit
100%Trading days kept open
17 weeksMedusa, four floors
83.35 m²Aunties scheme, designed

Drake's, Savile Row: a refit while the shop kept trading

The Drake's Savile Row flagship is a 120 sq m shop. We refitted it in 12 weeks, with a new shopfront and bespoke joinery. It stayed open on every trading day. A restaurant that cannot close needs the same planning: noisy work, deliveries and service changes fixed around trade.

Medusa, Knightsbridge: four floors designed and built in 17 weeks

Medusa reached us with a design concept at RIBA Stage 2. We completed the design, priced it and built it: a spa and beauty salon over four floors, 180 sq m, in 17 weeks. The people who drew it also priced it, so every finish was costed before it reached the wall.

Aunties, Seven Sisters: a deli-restaurant scheme we designed

Aunties is a deli-restaurant scheme we designed for an 83.35 m² unit. The layout splits service, work and guest areas, with the refrigeration built into the interior.

Sloane Place, Chelsea: next to a live members' club

Craftex took part in Sloane Place, a £1.29M remodel of a 27-key boutique hotel. It ran over 28 weeks next to a members' club that kept trading.

Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

Pawel Kamionka, Google reviewSee all reviews on Google

The team behind a restaurant fit-out

Earlier projects named here are from each person's career before Craftex.

  1. Joe Crawford, Operations Director. 37 years in construction, on projects from £100K to £135M, including the fit-out of Dior's flagship on Bond Street.
  2. Konstantin Jegorovs, Projects Director. 16 years in retail and commercial work, including aparthotels.
  3. Martin Hickey, Preconstruction Director. More than 50 years in construction. He settles the extract route, services and programme before the build.
  4. Rob Barton, Development Director. For owners weighing a refurbishment against a change of use. He delivered more than 4,000 homes in his housebuilding career.

Around 60% of our labour is in-house. That keeps the bar, the joinery and the pace under our own control.

Ten questions for every restaurant fit-out company

Take these to each meeting. A firm that answers them clearly, in writing, deserves a place on your shortlist.

For the whole process, from survey to opening night, read our restaurant and hospitality fit-out guide. Pub owners should also read our pub refurbishment guide. Our restaurant and bar fit out page shows how we run a job. If you are comparing firms now, book a site visit and put these questions to us.

Ten questions to ask

  • Where will the extract go, and who agrees it with the landlord?
  • Does external ductwork need planning permission on this site?
  • Who coordinates the kitchen supplier's drawings with gas, power and drainage?
  • What does your programme assume for the landlord's approval?
  • Which items have the longest lead times, and when will you order them?
  • Who makes your joinery, and how do you check its quality?
  • What share of the site labour is your own?
  • What is excluded from your price?
  • Which two finished restaurants can we visit, and can we call the owners?
  • Who do we call if something fails in the first month of trading?

Frequently asked questions

How do I choose a restaurant fit-out company in London?

Shortlist firms that have finished restaurants of your size and type in London. Ask each how it handled extraction, kitchen services, the landlord's approvals and the opening date on its last two jobs. Visit a finished site and call the owner.

Who should lead, the kitchen supplier or the fit-out contractor?

The supplier designs the cooking line. The contractor builds the room and the services that feed it. One of them must coordinate the two, and that should be agreed in writing before work starts.

How long does a restaurant fit-out take?

It depends on the size of the unit, the extract and kitchen work and the approvals. On site, typically 4 to 6 weeks up to about 140 m², 6 to 8 weeks up to 280 m² and 8 to 12 weeks above. Design, approvals and ordering usually take another 4 to 10 weeks first.

Do I need planning permission for a restaurant fit-out?

Moving into a unit already in Class E often needs no planning permission for the use. External ductwork, roof plant and shopfront changes often do. Pubs, bars and hot food takeaways sit outside Class E, so a change of use to them usually needs permission.

Can a restaurant be fitted out while the building is in use?

Yes. Noisy work, deliveries and service connections are planned around neighbours and the building's rules. The Sloane Place refurbishment Craftex took part in ran next to a members' club that kept trading.

What size of restaurant project does Craftex take on?

We take on construction projects from £100,000 to £10M and more. We don't take on small fast-food chains or low-budget refurbishments.

Got a restaurant unit and a launch date?

Our design and build team surveys the unit, checks the extract, services and consents, and gives you a programme and a price before you commit. Book a site visit.

WhatsApp us