Skip to content
Request a callbackCallback
Empty office floor with windows along two walls and sunlight falling across the carpet

Dilapidations Surveyor for Tenants and Landlords

One team, one contact: schedules prepared, claims priced and negotiated, works done.

Since 2016

10+ years building and handing back
London commercial space

Schedules, claims and works

  • 1 teamsurveyor, negotiation and works under one contract
  • 3 weeksto refurbish 750 sq m at Beaumont House against a lease deadline
  • 60%of the labour on site is our own team
  • £10Mpublic and employers' liability cover on every job

A surveyor who can also price and build the works

Craftex gives tenants and landlords a dilapidations surveyor and a builder in one team: our in-house RICS-qualified quantity surveyor prepares or answers the schedule of dilapidations, prices every line and negotiates the claim. Because we also carry out the works, the figure we agree is one we can deliver, in London and the South East.

One team, one point of contact. You are not juggling a surveyor, a solicitor and three contractors: the person who reads your lease and inspects the building works with the crews who would do the works, so every price is a real one.

A dilapidation survey starts with the lease, every licence for alterations and any schedule of condition. We inspect each area, record each breach with photographs and set out the clause, the defect, the remedy and the cost, in the form the Dilapidations Protocol expects. Interim schedules during the lease, terminal schedules at the end, schedules of condition at the start and tenant responses as Scott schedules all follow the same discipline.

We price the works and negotiate; we do not value the landlord's interest. Where the section 18 cap on repair damages matters, a valuer prepares the diminution valuation and we give them the real cost of the works to compare it with.

Printed lease papers and a pen on a timber desk

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What our dilapidations surveyor does

Six jobs, one team: the survey, the schedule, the price and the negotiation.

Pen resting on printed schedule pages

Schedules prepared for landlords

Interim or terminal schedules, each breach tied to its lease clause and priced from builders' rates.

Marked-up drawings, a sketchbook and material samples on a desk

Schedules answered for tenants

Every line tested against the lease, the licences and the condition you took the premises in.

Ductwork and lighting panels in an open ceiling

Interim and terminal schedules

During the lease to get repairs done, or at the end as the basis of the claim.

Empty room with a timber floor, a curved dark wall and steel windows

Schedule of condition surveys

A dated photographic record before you sign, so you never hand back better than you took.

Tablet with a blank screen on a round table

Claims priced line by line

Each item priced as we would build it, so the figure stands up in negotiation.

Two people at a table going through printed papers with pens

Negotiation to a signed settlement

We meet the other side's surveyor and agree cash, works or both, in writing.

For tenants: answer the schedule before you pay

Empty room with a glazed door, tall windows and seating

Before you pay anything. Our in-house RICS-qualified quantity surveyor reads the lease and licences, strikes out what the lease never asked for and prices each remaining line at real cost. The section 18 cap is put on the table for repair items, and superseded items are flagged. More on our tenant dilapidations claim service.

Pencil and printed photo sheets on a worn timber workbench

Before you sign the next lease. A schedule of condition survey records the state of your new premises with dated photographs, attached to the lease, so the next handback starts from the right baseline.

Read more

The tenant's response goes on the landlord's own schedule, usually within 56 days of the quantified demand, endorsed under the Protocol. We then meet the landlord's surveyor, generally within 28 days, to narrow the claim item by item.

For landlords: a schedule that stands up

Stone-fronted office building on Whitehall, London

A schedule that survives negotiation. An end-of-lease inspection, then an interim or terminal schedule with each breach separated into repair, reinstatement and redecoration, costed from builders' rates and endorsed with your intentions for the building, so it holds up against the section 18 cap and the Protocol.

Office floor with glazed rooms, new timber-effect flooring and ceiling lights

Then the works, and the re-let. If the tenant pays rather than builds, we can do the dilapidation works for landlords and put the floor back in lettable condition between tenants.

Read more

A terminal schedule generally goes out within 56 days of the lease end, with the quantified demand. Served before the end, it gives the tenant time to do the works; the Protocol then asks you to confirm it or send a further one. Items your own plans will supersede should be left out from the start.

How it works

From inspection to settlement in five steps

  1. Inspection

    • We read the lease and licences and inspect every area, with photographs.
  2. Schedule or response

    • A landlord's schedule, or a tenant's line-by-line response.
  3. Line-by-line pricing

    • Each line costed from current builders' rates.
  4. Negotiation

    • Line by line with the other side's surveyor until the gap closes.
  5. Settlement or works

    • A signed settlement in cash, or the works done by our crews.
Cover of the free Craftex guide to fit-out and M&E works

Free guide: fit-out and MEP works at lease end

How fit-out and M&E packages are scoped, sequenced and signed off, written from the floors we survey, strip, reinstate and fit out. A short, free read before a schedule lands.

One team, one point of contact

Six promises, written into your contract

  1. One team, one point of contact

    Survey, pricing, negotiation and works under one contract, with one person accountable.

    Drake's: dilapidation works and the full move to the next warehouse, one team.

  2. Our in-house RICS-qualified QS

    Every schedule is prepared or answered by our own RICS-qualified quantity surveyor, not an outside firm.

    No second firm to brief: the person who prices the claim works with the crews who do the works.

  3. Costs upfront, and the figure stands

    We price the claim and the works at the start, and the price we sign is the price you pay.

    we won Drake's warehouse by coming in about £15k below the other quotes.

  4. Our own crews, on the date

    Around 60% of the work on site is done by our own crews, planned around your operations.

    Beaumont House, 750 sq m in 3 weeks with five weeks left on the lease.

  5. £10M cover on every job

    Public and employers' liability of £10 million each.

  6. Every certificate at handback

    Snagged before you inspect, with certificates and photos for the handback.

Example quotation with the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Holding the landlord's schedule, another surveyor's figure or a contractor's quote for the reinstatement works? Send it to us. A director reviews it and replies the same working day, showing line by line how we beat it for the same scope.

Compare your options

Surveyor only, or surveyor and builder?

AreaSurveyor onlySurveyor and builder
The schedulea fee for the schedule, then a second firm prices the worksone team surveys and prices it
The ratescosts guessed from a price bookevery line priced from real builders' rates
The timingworks start after the lease end, on extra rentthe works are planned to finish inside the lease
The caprepair items fall over on section 18repair, reinstatement and decoration split from the start
The agendastwo firms, two agendasone firm accountable for the figure and the works
The handbackno one owns the keys, the certificates or the snag listwe hand back, with certificates and photos

What sets the cost of a dilapidations survey?

We do not publish survey fees: each one depends on the lease and the building. These six things decide it, and here is what we do about each.

What moves the feeWhat we do
Floor area and number of buildingsWe scope the inspection to the areas the lease covers
Number of schedules (condition, interim, terminal)We quote each schedule as its own job
Lease and licence complexityWe read every licence before we inspect
Access and occupationWe inspect around your operations, out of hours if needed
Negotiation roundsWe price the schedule first, so fewer rounds are needed
Dispute stageWe work to the Protocol so the claim settles before court

Our team

  • in

Dilapidations surveyor: questions we are asked

What does a dilapidations surveyor do?

Reads the lease and licences, inspects the premises, records each breach and prepares or answers the schedule of dilapidations, then negotiates the claim. Ours also prices every line as a builder, because we can do the works.

Do you act for tenants or landlords?

Both, but never for both sides of the same claim. Tenants use us to answer and cut a claim; landlords use us to prepare a schedule that holds up.

What is a dilapidation survey for?

To record where a property falls short of the lease covenants and what it would take to put right. Landlords use it to claim; tenants use it to test the claim or plan the works.

Who pays for a dilapidation survey?

Each side usually pays its own surveyor. Many leases also let the landlord recover the cost of preparing and serving a schedule from the tenant, so check the costs clause.

What sets the cost of a dilapidation survey?

The floor area, the number of schedules, the lease and licences, access and how many negotiation rounds follow. We quote after reading the lease, before any inspection.

When should a landlord serve a terminal schedule?

The Dilapidations Protocol says generally within 56 days after the lease ends, with the quantified demand. Serving it earlier leaves room for the works to be done before the end.

Do we need a schedule of condition before signing a lease?

If the lease has a repairing covenant, yes. A schedule of condition attached to the lease stops you being asked to hand back premises in better repair than you took them.

Can you also do the works?

Yes. Our own crews carry out most of the work, so the figure we negotiate is one we can deliver before the lease end.

Do you work outside London?

Yes. We inspect across London and the South East and prepare and answer schedules for UK premises, with the works planned to suit.

How fast do you reply?

Fast: every enquiry gets an answer on the same working day it arrives.

What our clients say

See all reviews on Google
  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Holding a schedule, or about to serve one?

One team, one point of contact from schedule to keys. Send the lease, the schedule or just the address for your free schedule review. We will come back to you the same working day.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us