For freeholders and building owners
Best Airspace Development Companies London: How to Choose
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read
The short answer
The right airspace development company checks your title, leases and planning route before it draws anything. Then it proves the structure can carry new floors while residents stay in.
- Ask who reviews the title and the leaseholders' rights first.
- Ask which planning route your roof can use, and why.
- Ask how the structure and fire strategy will be tested.
- Compare the deal: sell, lease or develop with a partner.
Most freeholders hear about airspace from a letter. A company offers to buy the space above the roof, often for a round number. It sounds like free money. But the value depends on the title, the planning route and the structure. A good buyer has checked all three before it names a price.
This guide compares the types of airspace development company in London and across the UK. It sets out seven checks and the deals on offer. For the background on ownership and planning, start with our guide to airspace above your building. Have a building in mind? Book a site visit and we'll look at the roof with you.
How to choose between airspace development companies
Four kinds of firm take on rooftop schemes. They differ in what they buy, who carries the risk and what you keep.
| Type of company | Usual deal | Best for | Watch for |
|---|---|---|---|
| Specialist airspace buyer | Buys or leases the airspace from you | Owners who want a clean sale | A lower price to cover planning and structural risk |
| Modular rooftop firm | Builds factory-made storeys for a developer or owner | Roofs that can only take a very light storey | Planning acceptance of the module design |
| Your own architect and builder | You develop and keep the value | Owners with money, time and appetite for risk | Gaps between the consultants and the builder |
| Development partner | Shares the value with you, or buys | Owners who want one team for planning, design and build | Check its record on your building type |
There is no single best company. There is a best fit for your building and for how much risk you want to keep.
We work in the last row. Our airspace development consultancy takes a roof from appraisal and planning through design and build, with one team.
Seven checks before you sign with an airspace developer
Each check comes with a question you can ask at the first meeting.
1. It starts with the title and the leases
Airspace usually belongs to the freeholder. Leases can change that. Some demise the roof to the top-floor flats. Others stop the landlord building above.
Where the building has flats, the leaseholders may have a right of first refusal on a sale. That comes from Part I of the Landlord and Tenant Act 1987. Ask who will review the title and leases, and when.
2. It knows which planning route your roof can use
Permitted development can allow up to two extra storeys of homes on some blocks of flats. The block must date from between 1 July 1948 and 5 March 2018. Listed buildings and conservation areas are excluded. Prior approval is still needed.
Much of central London fails one of those tests. Then the scheme needs full planning permission. That is judged on height, roofline and heritage, street by street.
3. It can prove the structure works
New storeys add load all the way down to the foundations. The answer comes from original drawings, a structural survey and some opening up. Ask how the company tests the structure before it fixes a scheme. Ask who pays if the survey changes the design.
4. It understands building safety
Extra floors change the fire strategy for the whole building. A residential building of 18 metres or 7 storeys, with at least two homes, is a higher-risk building. Work on it needs approval from the Building Safety Regulator before it starts.
That can decide whether a scheme works at all. Read our guide to Gateway 2 and the second staircase.
5. It can build over people's heads
Rooftop schemes are built above homes and offices that stay in use. Cranes, scaffold, noise, water and working hours all need a plan. This is where budgets go wrong.
At Portsoken House in Aldgate we fitted out 1,550 sq m over seven months. The rest of the building stayed let. Noisy work was done at nights and weekends. Building above occupied floors needs the same discipline.
6. It deals with the neighbours properly
Raising a party wall needs notices under the Party Wall etc. Act 1996. Neighbours may also hold rights of light that survive a planning consent. Both belong in the feasibility stage. See our guides to the Party Wall Act and rights of light.
7. The deal suits you and your leaseholders
A good deal can pay for what residents care about. A new roof, a lift or façade repairs can turn objectors into supporters. Ask how the company proposes to share value, and with whom.
Sell, lease or develop: what each deal means
The deal matters as much as the company. These are the three common routes.
| Route | What you get | What you carry |
|---|---|---|
| Sell or lease the airspace | A price or premium, often soon | Little risk, but most of the uplift goes to the buyer |
| Develop it yourself | All of the value | All of the cost, planning and construction risk |
| Partner with a developer | A share of the value | Shared risk, set out in the agreement |
Planning first usually raises what a buyer will pay, because it removes the planning risk. Depending on the stage, Craftex can co-invest, take 100% of the risk, or work on a percentage or fee basis.
The people who would look at your roof
A rooftop scheme needs a developer's eye and a builder's eye together. These are the people who would assess yours.
- Rob Barton, Development Director. He spent over 20 years in managing director and land director roles at plc housebuilders. There he delivered more than 4,000 homes and acquired over £225M of land. These were his previous roles, not Craftex projects.
- Martin Hickey, Preconstruction Director. He has more than 50 years in construction and leads the structural and buildability questions. One earlier project was Slingsby Place in Covent Garden: structural works behind retained façades, with a tower crane inside the footprint. It was led by Martin Hickey, now our Preconstruction Director, as Project Director.
- Joe Crawford, Operations Director. He has 37 years in construction, on projects of up to £135M in previous roles.
Read more about Slingsby Place.
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
What our feasibility work looks like
Allitsen Road in St John's Wood is a vacant four-storey corner building. It sits in a conservation area, with 458 m² of existing floor space. We explored the roof and the basement for extra homes.
We tested four options against policy, structure and viability. They ranged from a light touch to a full scheme of up to seven flats. This is a feasibility study. The scheme has not been built.
That is the work an owner should see first. Options, each with its planning risk, its build cost and its value.
Where Craftex fits, and where it doesn't
We work as a development partner. Planning, design and construction sit in one team, on development schemes from £3M GDV.
We are not the right fit for every roof:
- A scheme below £3M GDV. One extra flat on a small building suits a local architect and builder.
- A quick sale and nothing else. A specialist airspace buyer may move faster. Get the title checked first either way.
- A roof that only works with modular construction. A modular rooftop firm fits better. Our team builds on site.
- A loft or mansard on a house. That is a residential builder's job.
Our rooftop extensions in London explains how we take rooftop schemes from appraisal to completion. If you're weighing up an offer for your roof, book a site visit first.