Strip Out Contractors for Commercial Buildings
One team, one contact: stripped to what the lease or the fit-out needs, nothing more.
Since 2016
10+ years building and handing backLondon commercial space
Strip-out, reinstatement and fit-out
- 3 weeksto refurbish 750 sq m at Beaumont House against a lease deadline
- 1,550 sq mof offices at Portsoken House, built with tenants at work
- 60%of the labour on site is our own team
- £10Mpublic and employers' liability cover on every job
Strip out only what the lease or the fit-out needs
Craftex are strip out contractors for offices, shops, restaurants, warehouses and hotels in London and the South East: soft strip, full strip back to shell, and M&E strip-out, timed to your lease date or your fit-out start. We strip only what the lease or the next design needs, keep what can be reused, and rebuild under the same contract when you need it.
One team, one point of contact. Our in-house RICS-qualified quantity surveyor prices the strip-out against the lease or the fit-out drawings before anything comes down, and our own crews carry it out. We take on whole floors and whole buildings, usually as part of a dilapidations handback, a Cat A reinstatement or a new fit-out.
Every strip-out starts with a refurbishment and demolition asbestos survey, as HSE guidance HSG264 requires before refurbishment or demolition work, and with the services isolated and recorded. Any licensed asbestos work goes to a licensed contractor before our crews start. Waste is segregated on site and recorded, and what can be reused or recycled leaves the building first.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Strip-out works we carry out
Six kinds of strip-out, each priced against the lease or the drawings before anything comes down.
Soft strip
Finishes, ceilings, partitions, floor coverings and joinery removed back to the base build.
Full strip back to shell
Everything out to the slab, columns and core, ready for a new design or a re-let.
M&E strip-out and safe isolation
Power, water, gas and ventilation isolated, made safe and recorded before removal.
Raised floors and suspended ceilings
Lifted, sorted and reused or recycled, with the grid and slab left clean.
Racking, mezzanines and plant
Dismantled in order, moved or sold where possible, floors and fixings made good.
Kitchens, bars and shopfronts
Catering equipment, extraction, bars and shopfronts removed and services capped.
Soft strip or full strip out?
Soft strip takes out everything that is not the building: finishes, ceilings, partitions, floor coverings and loose services. Full strip goes back to the slab, columns and core. A lease that asks for the floor back as let usually needs a soft strip and a Cat A reinstatement, not a shell.
Read more
Soft strip demolition is the industry name for removing a building's non-structural contents before refurbishment or demolition. Which one your lease needs depends on the reinstatement clause, any licence for alterations and whether the landlord has served a notice to reinstate. We read those before we price, so the floor is not stripped further than it has to be.
How it works
How a strip-out runs, survey to clean shell
-
Survey and isolation
- Refurbishment and demolition asbestos survey, then services isolated and recorded.
-
Strip plan and reuse list
- What comes out, what stays, what is reused, sold or recycled.
-
Strip and segregate
- Our crews strip in sequence, with waste segregated and recorded.
-
Make good and clean
- Fixings removed, slab and walls made good, the floor cleaned.
-
Handback or fit-out start
- Keys back on the date, or the fit-out starts the next day.
Lease-end strip-out for tenants and landlords
For tenants: strip to the lease. We strip exactly what the lease and licences require, keep what the landlord agrees can stay and finish before the end date. More on tenant dilapidations.
For landlords: back to Cat A between tenants. We strip the last tenant's fit-out and reinstate the floor so it lets. More on our dilapidation works for landlords.
Strip-out by type of building
Every building type leaves different things behind. The same team strips each one to what the lease or the next design needs.
Offices
Partitions, raised floors, ceilings and comms rooms stripped to the lease or to Cat A. See office dilapidations.
Shops and banks
Shopfronts, signage, joinery, counters and vault fittings removed with the facade made good. See retail dilapidations.
Restaurants and hotels
Kitchens, extraction, bars and guest-room fit-out stripped with services capped. See restaurant dilapidations.
Warehouses and factories
Racking, mezzanines, offices and plant taken out and the slab repaired. See warehouse dilapidations.
Free guide: fit-out and MEP works at lease end
How fit-out and M&E packages are scoped, stripped, sequenced and signed off, drawn from real strip-out and fit-out programmes. A short, free read before the strip-out starts.
One team, one point of contact
Six promises, written into your contract
-
One team, one point of contact
Pricing, strip-out, reinstatement and fit-out under one contract, with one person accountable.
Drake's: old warehouse handed back and the move done by one team.
-
Priced before it comes down
Every line is costed by our in-house QS before anything comes down, and the figure stands.
we won Drake's warehouse by coming in about £15k below the other quotes.
-
Our own crews, on the date
Around 60% of the work on site is done by our own crews, planned around your operations.
Beaumont House, 750 sq m in 3 weeks with five weeks left on the lease.
-
Reuse and recycle first
What can be reused, moved or sold leaves before the skip arrives.
-
£10M cover on every job
Public and employers' liability of £10 million each.
-
Every record at handback
Isolation records, waste transfer notes and photos for the handback pack.
Already have a quote? Send it to us. We'll beat it.
Holding a strip-out quote, a landlord's schedule or a contractor's price for the reinstatement? Send it to us. A director reviews it and replies the same working day, showing line by line how we beat it for the same scope.
Compare your options
Where strip-outs go wrong, and what we do instead
| Area | The usual risk | With Craftex |
|---|---|---|
| Asbestos | strip-out starts without a refurbishment and demolition survey | the survey comes first, and licensed work goes to a licensed contractor |
| Services | live services cut during the strip | isolated, made safe and recorded first |
| Reuse | reusable fit-out goes in a skip | it is listed, moved, sold or recycled first |
| Scope | stripped further than the lease asks | stripped to the lease or the drawings, nothing more |
| Waste | mixed waste with no records | segregated, with a transfer note for every load |
| The gap | weeks between strip-out and fit-out | the fit-out starts the day the strip-out ends |
What sets the cost of a strip-out?
We do not publish strip-out prices: each one depends on the building and what the lease or the design needs. These six things decide it, and here is what we do about each.
| What moves the cost | What we do |
|---|---|
| Floor area and number of floors | We plan the sequence floor by floor |
| Soft strip or full strip to shell | We price only what the lease or design needs |
| M&E to isolate and remove | We isolate and record before anything is cut |
| Asbestos found in the survey | Licensed work is sequenced before our crews start |
| Access, lifts and working hours | We plan out-of-hours work in occupied buildings |
| Waste, reuse and recycling | We reuse, sell or recycle before anything is skipped |
Strip-out and handback projects
Whole-floor and whole-building projects planned around a lease end, a move or occupied floors.
-
Beaumont House, West Kensington 750 sq m of offices refurbished in three weeks, with five weeks left on the old lease. View case study
-
Drake's Warehouse, Bethnal Green Dilapidation works at the old warehouse and the full move into a 500 sq m railway arch. View case study
-
Portsoken House, Aldgate 1,550 sq m of offices built with every other floor leased and at work. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Strip-out questions
What is soft strip demolition?
Removing a building's non-structural contents, such as finishes, ceilings, partitions and loose services, before refurbishment or demolition. The structure, slab and core stay.
Do we need an asbestos survey before a strip-out?
Yes. HSE guidance HSG264 says a refurbishment and demolition survey is needed before any refurbishment or demolition work. It locates asbestos in the area to be worked on, using intrusive inspection.
Do you remove raised floors, ceilings and partitions?
Yes. Raised floors, suspended ceilings, partitions and their services are the core of most office strip-outs. We sort them for reuse or recycling as they come out.
What can be reused or recycled?
Raised floor tiles, ceiling tiles, glazed partitions, furniture, lighting, racking and catering equipment often have a second life. Metals, timber and plasterboard are segregated for recycling.
Can you strip out while the building is occupied?
Yes. Noisy work and deliveries are planned out of hours, with escape routes, lifts and services kept open for the occupiers who stay.
Do you strip M&E and isolate services?
Yes. Power, water, gas and ventilation are isolated and recorded before removal, and capped safely where the lease or the next design needs them.
Can you start the fit-out straight after?
Yes. When the same team strips and builds, the new fit-out follows straight on, with no handover gap.
Do you work outside London?
Yes. We strip out whole floors and buildings across London and the South East, including Surrey, Sussex and Kent.
How fast do you reply?
Fast: every enquiry gets an answer on the same working day it arrives.
Read before the strip-out starts
Guides written from the floors we strip, reinstate and hand back.
-
Guide Office Strip Out in London: Scope, Cost and the Checks Before You Start Read the guide
-
Guide Schedule of Dilapidations: What It Lists, the Timetable and What the Works Cost Read the guide
-
Guide Vacant Possession: What a Commercial Tenant Must Hand Back Read the guide
What our clients say
See all reviews on Google-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Stripping out a floor or a building?
One team, one point of contact from strip-out to keys. Send the floor plans, the lease or just the address. We will come back to you the same working day.



























