Skip to content
Request a callbackCallback

For businesses with a noisy meeting room

Acoustic Glass Partitions: dB Ratings Explained

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 4 min read

Meeting room with a long wooden table, grey chairs and a conference phone beside a brick wall

The short answer

Acoustic glass partitions are rated by Rw, a lab figure in decibels (dB): the higher it is, the more sound the glass stops. A room is only as quiet as its weakest point.

  1. Rw is measured on the glass wall in a laboratory, not in your office.
  2. Double glazing usually stops more sound than single glazing.
  3. Most leaks come through the door, the ceiling void, bulkheads and trunking.
  4. Fix the leaks first; better glass alone rarely solves a noisy room.

An acoustic glass partition is rated by how many decibels (dB) of sound it stops, written as an Rw figure. The higher the number, the quieter the room. But a glass meeting room is only as quiet as its weakest point. That is usually the door or the ceiling void above it, not the glass.

This guide explains what the ratings mean and where sound really escapes from acoustic glass partitions. Planning glass meeting rooms or fixing a noisy one? Send us photos and your deadline and we will look at the whole room.

What Rw and dB ratings mean

Sound is measured in decibels, written dB. A sound rating tells you how many decibels a wall takes off the noise passing through it.

Rw is the rating you see on glass partition data sheets. Approved Document E describes it as a single figure for the sound insulation of a material or element, measured in a laboratory. The test method is set by the standard BS EN ISO 717-1.

Three points matter for an office:

  1. Higher is better. A higher Rw means less sound gets through.
  2. Lab, not site. Rw is measured on the partition alone, in ideal conditions. Your room adds a door, a ceiling and joints, so it usually performs worse than the lab figure.
  3. Site tests use other names. A test between two finished rooms gives a different figure, such as DnT,w. The two are not the same.

There is no legal sound rating for office meeting rooms. The sound rules in Part E of the Building Regulations cover homes, rooms for residential purposes and schools. For offices, designers use good-practice guidance such as BS 8233 and the British Council for Offices guides.

Single vs double glazed sound reduction

The glass build-up sets the starting point.

How glass build-up affects sound
Glass typeWhat it isSound performance
Single toughenedOne pane of safety glassThe basic level; fine for open, quiet areas
Single laminated acousticTwo layers bonded with a sound-damping interlayerMade to cut more noise than plain toughened glass
Double glazedTwo panes with an air gapUsed where privacy matters most, such as boardrooms

Each glass system comes with its own tested Rw figure. Ask for the test report for the whole system, not a figure for the glass alone.

Double glazing costs more per metre. Our guide to glass partition wall cost shows our 2026 rates for each type.

Where sound really escapes: doors, ceiling voids, bulkheads, trunking

Sound takes the easiest path. Approved Document E calls sound that goes round a wall "flanking transmission". In a glass meeting room these are the usual paths:

Open glass door into a small meeting room with a white table
The door is usually the weakest point of a glass room.
  1. The door. A gap under or around the door lets sound straight out. A glass door with no seals is often the weakest part of the room.
  2. The ceiling void. If the glass stops at a suspended ceiling, sound goes up through the tiles, across the void and down into the next space.
  3. The bulkhead. A hollow bulkhead above the glass with no insulation acts like a drum.
  4. Trunking and ducts. Cable trunking, air ducts and pipes that pass over or through the wall carry sound with them.
  5. The joints. Gaps where glass meets walls, floor, ceiling or other panes.

Even a small gap can undo the benefit of expensive glass. That is why the details matter more than the glass type.

We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

Simone Racaku, Google reviewSee all reviews on Google

Acoustic glass for boardrooms and phone rooms

Different rooms need different levels of privacy.

  1. Boardrooms and HR rooms. Private talks that must not be overheard. Use double glazing, a sealed acoustic door, and close the ceiling void above the walls.
  2. Meeting rooms. Normal discussions. Single laminated or double glazing, with door seals and a sealed head detail.
  3. Phone and focus rooms. Small rooms for one or two people. Seals matter most; the room is small, so every gap counts.
  4. Rooms next to loud areas. Kitchens, breakout areas and reception. Plan extra separation, or move the room.

Some walls also have fire duties. If the glass wall is on a protected escape route, it must be fire-rated as well. Our guide to fire rated glass partitions explains when.

Fixing a noisy existing glass room

Most noisy glass rooms can be fixed without replacing the glass. Work in this order, cheapest first:

  1. Seal the door. Fit a drop seal at the bottom and seals around the frame. Check the door closes fully.
  2. Close the ceiling void. Add an acoustic barrier in the void above the wall line, or build a bulkhead with insulation.
  3. Seal the joints. Fill gaps at the head, base and wall junctions with the right acoustic sealant.
  4. Treat the services. Box in or line ducts and trunking that cross the wall.
  5. Add soft finishes. Carpet, acoustic panels and soft furniture cut echo inside the room.

Then listen again. Only replace the glass if the room still leaks after the gaps are sealed. This work can often be done out of hours, so the room stays in use.

Speed comes from planning. At Beaumont House in Kensington we rebuilt a 750 sq m office in three weeks, where other contractors had quoted twelve.

We take on urgent works for businesses from £10,000. For smaller repairs a local trade will serve you better. Urgent? Message us on WhatsApp: we reply straight away, any day. We reply within one hour, Monday to Saturday, 8am to 6pm. Or send photos and your deadline through the form.

Frequently asked questions

What Rw rating do I need for a meeting room?

There is no legal figure for offices. Set it by how private the talks are and how loud the office is next door. Ask your designer or an acoustic consultant to set the target, then check it covers the door and ceiling too.

Is double glazing quieter than single?

Usually, yes. Two panes with a gap between them stop more sound than one. But the gain is lost if the door, ceiling void or joints leak.

Why can I hear through my glass meeting room?

Most often the sound goes round the glass, not through it: under or around the door, over the top through the ceiling void, or along trunking and ducts. The glass is rarely the weakest point.

Can you make an existing glass room quieter?

Usually, yes, without replacing the glass. Fit door seals, close the ceiling void with a barrier or bulkhead, and seal gaps at joints and services. Then test whether better glass is still needed.

Do acoustic partitions need fire-rated glass too?

Only if the wall is on a protected escape route or a fire compartment line. Some glass systems do both, but they are rated separately: Rw for sound, E or EI for fire.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

A quiet room, not just better glass

Send photos, the address and your deadline. We fix the door, ceiling and joints as well as the glass, out of hours if needed. We work across London.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us