Urgent Office Alterations and Glass Office Partitions
Fast-track works for London businesses: glass rooms, lighting, power and making good.
Urgent? Message us on WhatsApp: we reply straight away, any day. For urgent works we can visit the same day or the next day. We reply within one hour, Monday to Saturday, 8am to 6pm.
Craftex team
561 major construction projects delivered(combined team experience)
Fast office work we have delivered
- 3 weeksto rebuild a 750 sq m office (others quoted 12)
- 2 weeksfrom first call to on site
- 0snags at handover
- £10Mpublic and employers' liability cover
Urgent office works, done before your deadline
Craftex carries out urgent office alterations for London businesses: glass office partitions and meeting rooms, lighting, power and data, alterations, making good and decoration, finished before your deadline. We can come and see the space quickly, and one team does every trade, so nothing waits for a second contractor.
What we do: glass rooms, walls and doors, electrics, AV moves, floors and paint. Where: offices, shops, clinics and restaurants across London. How fast: we can be on site the day you get in touch, or the morning after, with a written price soon after.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
Is your job right for us?
We take on urgent works for businesses from £10,000. For smaller repairs a local trade will serve you better.
We also carry out insurer-funded reinstatement in commercial premises, from £50,000, for example after an escape of water or a fire.
Right for us: offices, shops, clinics and restaurants in London with a date that cannot move.
Not for us: homes, one socket or one light, handyman lists, and call-outs that need someone within the hour.
Urgent works we carry out
One team for every trade.
Glass partitions and meeting rooms
Glass boardrooms, meeting rooms and phone booths, framed or frameless, with doors.
Stud partitions, doors and bulkheads
New walls and doors, bulkheads over glass, ceilings boarded and finished.
Lighting, power and data
LED lights, spotlights, sockets, floor boxes and data points for the new layout.
AV, screens and moving equipment
Screens, cameras and meeting room kit taken down, moved and set up again.
Making good, decoration and floors
Old vinyl out, new carpet tiles or vinyl down, walls filled and painted.
Office toilets and tea points
Washrooms and kitchens refitted, with new basins, mirrors, lighting and tiles.
Glass office partitions and meeting rooms
A glass boardroom in an open-plan office
A typical job: a new glass boardroom in one corner of an open-plan floor. We measure the site first, then order the glass. The walls are 10 mm toughened glass, single or double glazed, with a glass or framed door. A bulkhead closes the gap above. Lights, sockets and the screen go in at the same time, so the room works on day one.
Framed or frameless, clear or frosted
Frameless glass gives a clean, open look. Black or timber frames suit older London buildings. Film or frosted bands give privacy and stop people walking into the glass. Acoustic glass and seals keep meetings private.
Read more
New glass walls must keep the fire escape routes and fire rules of the building. Glass next to an escape route may need to be fire-rated, and large panes need a marking band at eye level: see fire rated glass partitions. For sound, double glazing and good door seals matter more than thick glass, as our guide to acoustic glass partitions explains. The cost moves with the area of glass, the type of door, frames or no frames, and how hard the access is: see glass partition wall cost. We cover all of this at the visit.
Lighting, power and data for offices
New lighting for the new layout
When walls move, the lights must move too. We fit LED panels, spotlights and LED strip under desks, shelves and skirting. Emergency lighting moves with the new layout, so every route out stays lit.
Power and data where people sit
Small power, floor boxes, desk sockets and data points go where the new desks and rooms will be. We test everything and hand you the certificates. Our electrical work is covered by our NICEIC and NAPIT accreditations.
Read more
Office lighting has to be bright enough for screen work and calm enough for long days: see lux levels for offices. Emergency lights, exit signs and the fire alarm must be checked after any change to walls or doors, under the emergency lighting regulations. We plan these with the layout, not after it, so the building manager can sign the works off.
How it works
From your message to a finished space
01
Message us
WhatsApp or the form: the address, what needs doing, your deadline, photos and a budget range.
02
Site visit
We come and look on the day you message us, or the day after, and measure everything.
03
Price and plan in writing
A written price and a programme set against your date. If we cannot meet it, we say so.
04
The works
One team for every trade, at night or at weekends when the office needs to keep working.
05
Handover
Testing, a clean and a walk round together before your deadline, with the certificates.
Can it be done over a weekend or before Christmas?
Often, yes. We work nights and weekends so your team can keep using the office in the day. Holiday shutdowns are a good time for noisy work, so tell us early if you want the job done before the Christmas break.
We have done this in busy buildings. At Portsoken House in Aldgate we rebuilt the reception in 12 weeks of nights and weekends, with every tenant at work. At Beaumont House in Kensington we rebuilt a 750 sq m office in three weeks. Read more about office refurbishment while occupied.
Tell us the date. If we cannot meet it, we will say so at the visit.
Alterations, making good and small refurbishments
Walls, doors and ceilings
We move walls and doors, build bulkheads and fix ceilings. We keep what is still good, such as timber slats or a sound ceiling, so you pay only for what must change.
Floors, paint, toilets and kitchens
We strip old vinyl, lay new floors, fill and paint. We refit office toilets and tea points in the same visit. We do one area or one floor. Need a whole floor? See our full office fit out.
End-of-lease reinstatement on a deadline
Moving out soon? We put the space back the way the lease asks before you hand back the keys: walls out, ceilings and floors made good, lights and power made safe, then paint.
For the full process, see office dilapidations and our strip-out works.
Insurer-funded reinstatement, from £50,000
When water or fire has damaged a shop, office or other business premises, we rebuild what was lost. We strip out the wet or burnt finishes, work around the drying, then rebuild partitions, ceilings, electrics and decoration.
We work to the scope agreed with your loss adjuster. We are the builder, not the claims handler. This work starts at £50,000 and is for commercial premises only.
Free guide: fit-out and M&E works
How office works and the electrics behind them are planned, sequenced and signed off. A short, free read before you book the work.
Our promises
Six promises, written into your contract
-
Urgent site visit: same day or next day
We see the space before we price it, so the glass and the plan fit first time.
Beaumont House: on site two weeks after the first contact.
-
One team for every trade
Glass, walls, electrics, AV, floors and paint, run by one manager.
Portsoken House: designed and rebuilt by the same team.
-
Price in writing before we start
You see the full price before any work. Changes are agreed in writing first.
-
Nights and weekends when needed
Noisy work when the office is empty, so your people keep working.
Drake's on Savile Row stayed open for all 8 weeks on site.
-
A clean site every day
We tidy and protect the office at the end of each shift.
-
Certificates at handover
Electrical test certificates and the paperwork your building manager asks for.
£10M public and employers' liability cover.
Already have a quote? Send it to us. We'll beat it.
Got a price from another firm for glass, electrics or a small refit? Send it to us. A director checks it and comes back with how we beat it for the same work.
Compare your quotes
Where urgent office works go wrong, and what we do instead
| Area | The usual risk | With Craftex |
|---|---|---|
| The glass | Glass ordered from a drawing before anyone measures the room, then it does not fit. | We measure on site first, then order, so the panels fit the room you have. |
| The electrics | A second firm for the electrics, booked after the walls are up. | Our own team wires the room while it is being built. |
| Fire safety | Emergency lights and fire alarm left where the old walls were. | Both are moved and tested with the new layout. |
| The landlord | Work starts before the landlord agrees, and the building manager stops it. | We help you get the licence for alterations and the building rules sorted first. |
| Noise and dust | Drilling in the middle of the working day, dust on every desk. | Noisy work out of hours, dust sheets up, the site cleaned each night. |
| The deadline | Snags found on the morning the clients arrive. | We walk the space with you before the date and fix every item. |
What to send us for a fast price
The more we know, the faster we can price. Send us:
- the address and the floor
- what needs doing
- your deadline
- photos or a short video
- your budget range: £10–30k, £30–50k, £50–80k or £80k+
What sets the cost of urgent office works?
Every job is priced after we see it. These six things move the price most, and this is how we keep each one under control.
| What moves the cost | What we do about it |
|---|---|
| Size of the area and number of rooms | We measure on site and price each room |
| Type of glass, frames and doors | We show you options that meet your date |
| Lighting, power and data | We reuse good circuits and add only what is needed |
| Night and weekend working | We keep out-of-hours work to the noisy tasks |
| Access and building rules | We agree delivery times and lift use early |
| Floors, paint and finishes | We keep what is good and replace the rest |
Fast office and shop projects
Three jobs where the date could not move.
-
Beaumont House, Kensington A 750 sq m office rebuilt in three weeks where others quoted twelve, with zero snags. View case study
-
Portsoken House Reception, Aldgate A 70 sq m office reception rebuilt over nights and weekends while every tenant kept working. View case study
-
Drake's, Savile Row A flagship shop refitted in 8 weeks on site, open to customers throughout. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Urgent works questions
How fast can you start?
We visit in London on the same day you message us or the next day. The start date is agreed at that visit, once we have seen the space and checked the glass lead time.
Do you do the electrics yourselves?
Yes. Lighting, power and data are part of our own work, covered by our NICEIC and NAPIT accreditations, with test certificates at the end.
Can it be finished before the Christmas shutdown?
Often. It depends on the size of the job and how long the glass takes to make. We tell you yes or no at the visit, not after.
Do new glass walls need fire-rated glass?
Sometimes. It depends on where the wall sits and what the building's fire plan says. We check it before we order any glass, and add safety marking where it is needed.
Do you take insurance work?
Yes, in commercial premises, from £50,000, for water or fire damage. We work to your loss adjuster's agreed scope.
What should I send you?
The address, what needs doing, the date it must be ready, a few photos and the budget range. That is enough for us to plan the visit.
Is there a minimum job size?
Yes, £10,000. Below that, a local trade is usually the better and quicker choice for you.
Can you work nights and weekends?
Yes, when the building allows it. Noisy and dusty work goes out of hours so your staff can work in the day.
Do I need the landlord's permission?
Usually, yes. Most leases need a licence for alterations before walls, glass or electrics change. We give the landlord the drawings and details they ask for.
Can you keep the office working while you build?
Yes. We split the work into zones, keep exits clear and do the loud parts when the office is empty.
Do you work outside London?
Our quick visit is for London. Jobs outside London are possible by arrangement, so send us the details.
How fast do you reply?
Straight away on WhatsApp, any day. Forms and emails get an answer inside an hour, Monday to Saturday, 8am to 6pm.
Read before the work starts
Short guides for office managers with a deadline.
What our clients say
See all reviews on Google-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Send us the space and the date
Not urgent? Use the form with the address, what needs doing, your deadline and a budget range. A director replies and books the visit.