Fire Rated Glass Partitions: Ratings, Rules and Glass

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Glass office wall with a framed glass door, a door closer and a push bar

The short answer

Most glass walls inside an office do not need to be fire-rated. A glass wall must be fire-rated when it encloses a protected escape route, such as a protected corridor, lobby or stair.

  1. E 30 means the glass holds back flames and smoke for 30 minutes in a test.
  2. EI 30 adds insulation, so the far side stays cooler; it can be used with fewer limits.
  3. The glass, frame, door and seals must be tested and fitted as one system.
  4. All office glass in walls and doors must also be safety glass and marked so people see it.

Most glass walls inside an office do not need to be fire-rated. Fire rated glass partitions are needed where a wall forms part of a protected escape route, such as a protected corridor or stair.

Fire-rated glass is tested to hold back fire for a set time, such as 30 minutes. The frame, door and seals must be tested with it.

This guide explains when you need fire rated glass partitions, what the ratings mean and the other glass rules every office must follow. Planning a new glass room on a deadline? Send us photos and your deadline and we will check the fire rules first.

When an office partition must be fire-rated

Fire rules for offices in England sit in Approved Document B, volume 2. It decides which walls must resist fire. Most walls inside an open office are not on that list.

A wall usually needs a fire rating when it encloses one of these:

  1. A protected corridor. Approved Document B lists every dead-end corridor and any corridor shared by two or more businesses.
  2. A protected lobby or stair. The routes people use to reach the stairs and leave the building.
  3. A fire compartment. Walls that split a building into fire-tight sections, often set by the landlord's fire strategy.

An ordinary escape corridor that is not "protected" is lighter. Its partitions need no fire rating, but they should reach the slab or the suspended ceiling, with doors into the rooms. That slows smoke.

When we plan glass partitions and meeting rooms, we check the fire strategy before anything is ordered.

What EI 30 and E 30 mean

Fire ratings in the UK now use the European system, BS EN 13501-2. Approved Document B explains the letters.

Fire rating letters for glass partitions
LetterStands forIn plain English
RLoadbearing capacityThe wall keeps holding up the structure (not used for glass partitions)
EIntegrityFlames and hot gases do not pass through
IInsulationThe far side stays cool enough not to set things alight
30, 60MinutesHow long the system held in a fire test

So E 30 glass stops flames and smoke for 30 minutes, but the far side can get very hot. EI 30 glass does both for 30 minutes. Older products may carry the British rating from BS 476-22 instead.

The difference matters on escape routes. Approved Document B limits where integrity-only glass may go, often only above a set height from the floor. Glass that meets both integrity and insulation has no such limit on its area.

Fire-rated glass vs ordinary toughened glass

Ordinary toughened glass is a safety glass. It breaks into small, blunt pieces, so it is right for most office walls. But it is not fire-rated. In a fire it can crack and fall out quickly.

Fire-rated glass is made to stay in its frame for the rated time. Some types also stop heat passing through. They cost more than toughened glass and are heavier.

Approved Document B asks for fire-resisting glass to be marked with the maker's name and the product name. If a glass wall on an escape route has no marking, ask for the test evidence.

I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

Taron Papoyan, Google reviewSee all reviews on Google

Doors, frames and seals

A fire rating belongs to the whole system, not the glass alone. The glass, frame, door, seals, hinges and fixings were tested together. Swap one part and the rating may no longer hold.

Frosted line pattern on a frameless glass wall in front of an office room
Manifestation makes a glass wall visible at eye level.

For doors, Approved Document B uses two ratings:

  1. FD 30, tested to the British Standard BS 476-22.
  2. E 30, tested and classified to the European standard.

An "S" or "Sa" at the end means the door also limits smoke leakage. Fire doors on escape routes usually need a self-closing device. Check the closer shuts the door fully into the frame.

Safety glass and manifestation (Approved Document K)

Every glass wall and door in an office must also meet Approved Document K, fire-rated or not.

Safety glass. Glass in "critical locations" must break safely or be strong enough not to break. That covers glass in and beside doors, and glass low down in walls. In practice that means toughened or laminated safety glass.

Manifestation. Large glass walls and doors must carry markings so people do not walk into them. Approved Document K asks for:

  1. Markings at two heights: 850 to 1000 mm and 1400 to 1600 mm from the floor.
  2. A colour that stands out against the background, in all light.
  3. Bands at least 50 mm high, or logos at least 150 mm high.
  4. A high-contrast strip on glass doors set in a glass screen.

Manifestation can be your brand pattern or a simple frosted band. It is easy to add during the build.

Building control and the landlord

Two approvals usually sit around a glass partition on a fire route.

  1. Building control. Work that makes the escape route or fire separation worse is a "material alteration" under the Building Regulations. It needs approval and a completion certificate. Changing a protected corridor or a fire compartment falls under this.
  2. The landlord. Most leases need written consent for alterations, and the landlord's fire strategy may set the ratings. Agree the details before you order glass.

After the work, the responsible person updates the fire risk assessment. Keep the glass test evidence, door certificates and drawings in the fire safety file. New walls can also move escape routes, so check our guide to emergency lighting regulations.

Fire-rated glass costs more than standard glass. Our guide to glass partition wall cost shows what else moves the price.

We work in occupied buildings at times that suit the business. At Portsoken House in Aldgate we rebuilt a 70 sq m reception in 12 weeks of nights and weekends, with every tenant at work.

We take on urgent works for businesses from £10,000. For smaller repairs a local trade will serve you better. Urgent? Message us on WhatsApp: we reply straight away, any day. We reply within one hour, Monday to Saturday, 8am to 6pm. Or send photos and your deadline through the form.

Frequently asked questions

Do glass office partitions need to be fire-rated?

Not usually. A glass wall inside an open office needs no fire rating. It does when it encloses a protected escape route, such as a protected corridor, lobby or stair, or forms a fire compartment wall.

What does EI 30 mean?

It is a fire rating under BS EN 13501-2. E is integrity: flames and hot gases stay on one side. I is insulation: the far side stays cool enough. 30 is the minutes the system held in the test.

What is manifestation on glass?

Markings that make a glass wall or door visible. Approved Document K asks for them at two heights, 850 to 1000 mm and 1400 to 1600 mm, in a colour that stands out from the background.

Does building control need to sign off a glass partition?

Only when the work affects fire safety, for example new walls on an escape route or a fire compartment. Then the work needs building regulations approval and a completion certificate.

Can existing glass be upgraded to fire-rated?

Rarely by itself. Fire rating comes from the whole tested system: glass, frame, seals and fixings. Usually the panel or the whole screen is replaced with a tested system.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Glass rooms that pass building control