For office managers with a deadline
Office Refurbishment Checklist for Office Managers
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 4 min read
The short answer
Start with the date the office must be ready and work back. Leave time for the site visit, the written price, landlord consent and ordering materials before work starts.
- Send photos, the address, what needs doing, the deadline and a budget range in the first message.
- Ask the landlord for consent early; most leases require it in writing.
- Book IT, furniture and staff moves around the works, not after them.
- Walk the finished space with the contractor and list every snag before you sign off.
Start your office refurbishment checklist with the date the space must be ready, then work back. The contractor needs a site visit, a written price and the glass or materials ordered before work can start. Send photos, the address, what needs doing and your budget range in the first message and the price comes back faster.
This checklist is for office managers with a hard date: clients visiting, new starters or a shutdown. It covers short jobs, from a new glass room to a refreshed floor. Need urgent office alterations? Send us photos and your deadline and we will tell you what is possible.
Set the deadline and work back from it
Most delays on small office jobs happen before anyone picks up a tool. Write the ready date at the top of the page, then plan backwards.
| Step | What happens | Who acts |
|---|---|---|
| 1 | First message with photos, scope, deadline and budget range | You |
| 2 | Site visit to measure and check services | Contractor |
| 3 | Written price and programme | Contractor |
| 4 | Landlord consent and any building control application | You and the contractor |
| 5 | Materials ordered, such as made-to-measure glass | Contractor |
| 6 | Works on site, by day or out of hours | Contractor |
| 7 | Snag walk, certificates and handover | You and the contractor |
Steps 4 and 5 often take the longest. Glass and some light fittings are made to order, and landlords take time to reply. Start both as soon as the scope is fixed.
Leave a buffer before the real deadline. A day or two for cleaning and moving in saves panic if something arrives late.
What to send the contractor for a fast price
The quickest prices come from the most complete first message. Send:
- the address, the floor and how to get in
- photos or a short video of every area, including the ceiling and floor
- a floor plan or a sketch with rough measurements
- what needs doing, in plain words
- the ready date and any dates the office cannot be disrupted
- a budget range
Mention anything unusual: a listed building, a shared lift, tight loading times. These change the plan and the price.
Landlord consent and building rules
In a rented office, the lease decides what you can change. Most leases need the landlord's written consent before alterations, often called a licence for alterations. Ask early, because landlords and their surveyors can take time.
Then check the building rules:
- Building control. New walls that change escape routes are a material alteration under the Building Regulations. They need approval and a completion certificate.
- Fire safety. The responsible person updates the fire risk assessment after the works. New rooms may need moved detectors and emergency lighting regulations followed.
- Asbestos. HSE advises assuming asbestos is present in buildings built or refurbished before 2000. A survey comes before any work that disturbs the fabric.
- CDM 2015. Your business is the client under the construction safety rules, with duties of its own.
Our guide to building regulations for office fit-outs covers the approvals in more detail.
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
IT, AV and furniture moves
These are the moves staff notice most, and they are easy to forget until the last week.
- IT and data. Book the IT team or provider early. New desks and rooms need data points, and the comms room may need work.
- Screens and AV. Meeting rooms need power and data behind the screen before the walls are finished.
- Furniture. Order early, because lead times can be long. Agree who moves it, and when.
- Lighting. A new layout changes where light is needed. Check desks against recommended lux levels for offices.
- Staff. Tell people what moves, when, and where they sit meanwhile.
At Beaumont House we moved the furniture and equipment in ourselves at the end of the programme. The business carried on without disruption.
Working nights, weekends or over the Christmas shutdown
Noisy and dusty work is best done when the office is empty. There are three common windows:
- Nights. Work in the evening, clean up and hand the space back by morning.
- Weekends. Longer shifts for noisy jobs, such as cutting or drilling.
- The Christmas shutdown. A week or more with nobody in, which suits bigger changes.
Each needs planning. The building may restrict hours, deliveries and goods lift use. Security, access and alarm codes must be arranged. Neighbours on other floors may need notice.
At Portsoken House in Aldgate we rebuilt a 70 sq m reception in 12 weeks of nights and weekends, with every tenant at work. For a bigger office that must keep running, read our guide to refurbishing an office while it is occupied.
Snag walk and handover at the end of the office refurbishment
Do not accept the space without walking it. Book a snag walk with the contractor a few days before the ready date, so there is time to fix things.
Walk every room and list anything not finished or damaged. Agree a date to fix each item. At Beaumont House we handed over with zero snags, so ask your contractor for the same standard.
Before you sign off, collect the paperwork for your files:
- electrical certificates for new circuits and lighting
- emergency lighting and fire alarm test records
- building control completion certificate, where needed
- product details and warranties, such as glass and door hardware
- as-built drawings of what changed
Use the checklist below as your one-page summary. Moving to a new office instead? Our office relocation checklist covers that route.
We take on urgent works for businesses from £10,000. For smaller repairs a local trade will serve you better. Urgent? Message us on WhatsApp: we reply straight away, any day. We reply within one hour, Monday to Saturday, 8am to 6pm. Or send photos and your deadline through the form.
Office refurbishment checklist
- Write down the ready date and any no-disruption dates.
- Send photos, the address, the scope, the deadline and a budget range.
- Book the site visit and get a written price and programme.
- Ask the landlord for written consent.
- Check building control, fire safety and asbestos.
- Order glass, lighting and furniture with long lead times.
- Book IT, AV and furniture moves.
- Agree working hours, deliveries and access with the building.
- Tell staff what happens and when.
- Walk the space, list the snags and agree fix dates.
- Collect certificates, records and drawings at handover.