Skip to content
Request a callbackCallback

For office managers pricing a glass room

Glass Partition Wall Cost: What Moves the Price in 2026

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Frameless glass office walls with glass doors and long pull handles

The short answer

Our 2026 rates for a glass partition wall run from £315 to £1,080 per linear metre, supplied and installed, ex VAT. Doors, bulkheads, electrics and making good are extra.

  1. Single glazed: £315 to £630 per linear metre.
  2. Frameless single glazed: £405 to £810 per linear metre.
  3. Double glazed acoustic: £540 to £1,080 per linear metre.
  4. A 7 m frameless front for a meeting room: about £2,835 to £5,670 for the glass alone.

The cost of a glass partition wall depends on the glass, the doors and the work around it. That work is the bulkhead, the lighting and power, and the making good. Our 2026 rates run from £315 to £1,080 per linear metre, supplied and installed, ex VAT.

This guide explains what moves the price of glass office partitions, so you can compare quotes on the same basis. Want a firm figure? Send us photos and your deadline and we will price the whole job after a short visit.

What a glass partition job includes

A price "per metre" only covers the glass wall itself. A real glass room needs more than that. Most quotes split into five parts:

  1. The glass wall. Glass, frame or channels, fixings and fitting.
  2. The door. A glass or framed door, its handles, closer and lock.
  3. The ceiling. A bulkhead or ceiling repair where the glass meets the ceiling.
  4. Lighting, power and data. New lights, sockets, a screen point and moved emergency lights.
  5. Making good. Floor, wall and ceiling repairs, decoration and cleaning.

When two quotes look far apart, check which of these each one includes. A low figure often prices the glass alone. A good quote lists every part, so nothing appears as an extra later.

Single vs double glazed, framed vs frameless

The glass type sets most of the price per metre. Here are our 2026 rates.

Our 2026 rates per linear metre of glass partition, supplied and installed, ex VAT
Partition typeOur 2026 rate per linear metreBest for
Single glazed£315 to £630Open, bright rooms where privacy is not critical
Frameless single glazed£405 to £810Clean, modern look with slim joints
Double glazed acoustic£540 to £1,080Boardrooms, HR rooms and private calls

Rates are for a standard ceiling height. Taller walls, curved glass and special finishes cost more. Your fixed figure comes after a survey.

A worked example. A meeting room in the corner of an open floor needs two new glass sides, 4 m and 3 m long. That is 7 linear metres. In frameless glass the wall alone comes to about £2,835 to £5,670. The door and the work around the glass come on top.

Framed systems use slim aluminium posts between panes. Frameless systems join panes with clear joints, which looks cleaner but needs a flat floor and ceiling. Double glazing has two panes with a gap, which stops more sound.

Doors, film and acoustic upgrades

The door is one of the bigger items in a glass room. A frameless glass door with patch fittings looks clean. A framed door with seals stops more sound and can carry a closer and a lock more easily.

Breakout area with armchairs and low tables behind a full-height glass wall
Glass walls keep a space open to light but separate.

Other upgrades that move the price:

  1. Manifestation. Approved Document K asks for markings on large glass walls and doors so people see them. It is a legal step, not a decoration.
  2. Privacy film. Frosted or patterned film, full height or in a band, for rooms that need privacy.
  3. Blinds. Integral blinds inside double glazing usually cost more than film, but they open and close.
  4. Acoustic seals. Drop seals under the door and seals on the frame. Without them, even double glazing leaks sound. More in our guide to acoustic glass partitions.
  5. Fire-rated glass. Needed where the wall forms part of a protected escape route. It costs more than standard toughened glass. See fire rated glass partitions.

We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

Ben Edell, Google reviewSee all reviews on Google

The work around the glass: bulkheads, lighting, power, making good

This is the part most cost guides leave out, and the part that blows budgets.

Bulkheads. If the suspended ceiling stays, the glass usually stops at the grid. A bulkhead fills the gap and can carry acoustic insulation. If the ceiling is open, the glass runs to the slab.

Lighting and power. A new room changes the lighting plan. It may need its own lights and switch, sockets, a floor box, a data point for a screen and a moved emergency light. Our guide to emergency lighting regulations explains why that last one matters.

Air and fire. A closed room may need its own air supply or a moved fire detector.

Making good. Carpet joins, wall repairs, ceiling tiles and decoration. In an occupied office, add cleaning each morning and protection for routes.

On a small room they can be a large share of the total. That is why we price the whole job, not the glass alone.

Lead times and deadlines

Glass for partitions is made to measure. The installer measures on site, orders the glass and fits it when it arrives. The order time often sets your start date, so measure early.

Other things that set the date:

  • the landlord's consent, often a formal licence for alterations
  • building control, where new walls change an escape route
  • working hours allowed in your building, such as nights and weekends only
  • your own dates: client visits, new starters or a shutdown

Speed comes from planning, not from rushing on site. At Beaumont House in Kensington we were on site two weeks after the first contact. We rebuilt the 750 sq m office in three weeks, where other contractors had quoted twelve.

How to get an accurate price

You get a firm price fastest when the contractor has what it needs in the first message. Send:

  • the address and the floor
  • a floor plan or a sketch with measurements
  • photos of the area, the ceiling and the floor
  • what the room is for and how private it must be
  • your deadline and a budget range

Then expect a short site visit to measure and check the ceiling, floor and services. A good contractor gives you a written price that lists every part above.

We take on urgent works for businesses from £10,000. For smaller repairs a local trade will serve you better. Urgent? Message us on WhatsApp: we reply straight away, any day. We reply within one hour, Monday to Saturday, 8am to 6pm. Or send photos and your deadline through the form.

Frequently asked questions

How much does a glass partition wall cost?

Our 2026 rates run from £315 to £1,080 per linear metre, supplied and installed, ex VAT. Single glazed sits at the bottom, double glazed acoustic at the top. Doors, bulkheads, lighting, power and making good are priced on top.

Is double glazing worth it for a meeting room?

If people hold private or loud conversations in the room, usually yes. Double glazing stops more sound, but only if the door, the ceiling void and the joints are sealed as well.

How long does a glass partition take to install?

It depends on the size and the glass. The glass is made to measure after a site survey, so the order time often sets the date. We confirm the date at the site visit, before you commit.

Do I need planning permission or landlord consent?

Planning permission is not usually needed, because works that affect only the interior are not development (Town and Country Planning Act 1990, s.55). Most leases need the landlord's written consent, called a licence for alterations.

Can you reuse an old glass partition?

Sometimes. Demountable systems can often be taken down and rebuilt. Glass cut for one opening rarely fits another, and old glass must still meet today's safety rules in its new place.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

One price for the whole glass room

Send photos, the address and your deadline. We price the glass and all the work around it, then build it out of hours if needed. We work across London.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us