For office managers
Lux Levels for Offices: How Much Light Each Area Needs
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
Most office desks need about 500 lux on the desk under BS EN 12464-1:2021. HSE guidance sets a much lower safety minimum for offices: 200 lux on average.
- Desks for reading, writing and screen work: about 500 lux under the 2021 standard.
- Corridors and walkways need much less light than desks.
- Too little light tires people; too much, or bare bright lamps, causes glare on screens.
- Measure at desk height with a lux meter before you buy new fittings.
Most office desks need about 500 lux of light on the desk, while corridors and stores need much less. Too little light tires people out; too much causes glare on screens.
This guide gives lux levels for offices by area, using UK guidance and the European standard. It also shows how to check your own office and plan office lighting and power upgrades without a full refit. Want the lighting fixed before a deadline? Send us photos and your deadline and we will plan it.
What a lux is
Lux measures how much light lands on a surface. One lux is one lumen spread over one square metre. HSE uses the same unit in its guide to lighting at work.
Two numbers matter. The average lux is the light across the whole working area. The minimum lux is the darkest point, for example a desk in a corner.
A lux figure is about the light that reaches the desk, not the power of the lamp. The same lamp gives fewer lux on a desk two metres further away. Dirty or ageing fittings also give less, and HSE says light levels fall as lamps age.
Recommended lux levels by area
There are two sets of figures in the UK. HSE's guide HSG38 gives the minimum for health and safety. The European standard BS EN 12464-1:2021 gives the level good office design aims for.
| Area | HSE minimum (average) | Good design target |
|---|---|---|
| Desks: reading, writing, screen work | 200 lux | 500 lux (BS EN 12464-1:2021) |
| Detailed drawing work | 500 lux | Higher, set by the designer |
| Meeting room table | 200 lux | Light it like a desk |
| Reception desk | 200 lux | Light it like a desk |
| Corridors and walkways | 20 lux | Well above the minimum, set by the designer |
The 500 lux desk figure comes from summaries of the 2021 standard by lighting designers. The standard also lets the designer go higher where the work is hard to see or errors are costly. Older guides often say 300 lux for screen work, because earlier editions allowed it.
The HSE figures are a floor, not a target. They keep people safe, but a whole office lit to 200 lux will feel dim to most staff.
UK rules: HSE HSG38 and the workplace regulations
The law is short. The Workplace (Health, Safety and Welfare) Regulations 1992, regulation 8, say every workplace must have "suitable and sufficient lighting". It should be natural light as far as reasonably practicable.
HSE's guide HSG38, Lighting at work, explains what "suitable and sufficient" means. It sets average and minimum lux for different kinds of work. For offices the guide gives 200 lux average and 100 lux minimum.
The same regulation asks for emergency lighting where people would be in danger if the lights failed. That has its own rules, set out in our guide to emergency lighting regulations.
There is no law that says "500 lux". That figure is good practice from the standard, used by designers and landlords.
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Glare, screens and colour temperature
More light is not always better. Glare is the problem most staff complain about.
- Direct glare. A bright lamp in the line of sight. Pick fittings that hide the bright part from normal viewing angles.
- Reflections on screens. HSE calls these veiling reflections. A window or bare lamp shows on the screen and hides the detail.
- Uneven light. Bright desks next to dark walls tire the eyes. Light the walls as well as the desks.
Colour temperature describes how warm or cool white light looks. It is measured in kelvin: lower numbers look warmer and more yellow, higher numbers cooler and bluer. Use one colour temperature across a room, so mixed fittings do not look patchy.
Upgrading lighting in an existing office
Most offices do not need a full refit to fix their lighting. In order of cost:
- Clean and replace. Dirty diffusers and old tubes lose light. Clean first, then replace failed lamps.
- Swap fittings like for like. LED panels drop into most suspended ceiling grids. The ceiling stays; the light improves.
- Add controls. Dimming, presence sensors and daylight sensors cut energy and let staff adjust light.
- Re-plan the layout. New desks, glass rooms or partitions change where the light needs to be. Plan the fittings with the new layout.
If the work changes walls or ceilings, plan the lighting and power together. The electrician then moves sockets, data and emergency lights in the same visit.
The work can often be done at night or over a weekend. At Beaumont House we replaced the lighting and wiring as part of a 750 sq m office rebuilt in three weeks.
Measuring your office
You can check your office in an hour with a handheld lux meter. They are easy to use.
- Switch on the normal lights and close the blinds for one set of readings.
- Hold the meter flat at desk height, in the middle of each desk.
- Take readings in corridors and at the reception desk too.
- Note the lowest reading in each area, not just the average.
- Repeat on a bright day with the blinds open.
Compare the readings with the table above, and add any lighting fixes to your office refurbishment checklist. If desks sit well below 500 lux, or the HSE minimum is missed anywhere, plan an upgrade. Note any desk where staff complain of glare, even if the lux reading is fine.
Planning the work around your staff
Lighting work means ladders, ceiling tiles and power cuts, so it is best done when the office is empty. We work nights and weekends and leave each area clean and working the next morning.
We take on urgent works for businesses from £10,000. For smaller repairs a local trade will serve you better. Urgent? Message us on WhatsApp: we reply straight away, any day. We reply within one hour, Monday to Saturday, 8am to 6pm. Or send photos and your deadline through the form.