Skip to content
Request a callbackCallback
Birmingham city centre skyline with tower blocks above older brick buildings

Planning Consultants in Birmingham

Pre-application advice, applications and appeals, costed by the team that builds.

Our track record

100% of our projects handed over ahead
of programme, within budget

Rob Barton, Development Director: record from earlier roles

  • 10,000+homes through planning
  • 4 weeksfor Craftex to cost four schemes and a planning route at Allitsen Road
  • 4,000+homes delivered
  • £225M+of land acquired

Planning in Birmingham: what gets approved

Craftex are planning consultants in Birmingham for developers, investors and landowners whose sites sit under Birmingham City Council. Where a plot sits on the city edge, we work with its neighbours too. From a first look at the plot to a decision notice or an appeal, we run the whole planning case. Our construction team puts a build cost on each option before it is submitted.

White architectural scale model of a city waterfront with high-rise blocks, quays and cranes on a studio table
Two Craftex directors in hi-vis vests talking on a site walk-round in a bright, stripped-out building

Birmingham City Council decided 3,333 applications in the twelve months to June 2026. It approved 82.1% of them, a little under the England rate of 87%. Officers signed off 98.4% under delegated powers, so a Birmingham consent is won or lost in the case officer's report. What gets through is brownfield housing that fits the Birmingham Development Plan, respects the 29 conservation areas and still pays its CIL and Section 106 obligations. Our town planning team is based in London and comes up to Birmingham for site visits and officer meetings.

Rob Barton, who heads our planning work, has steered schemes for 10,000+ homes to consent in earlier roles. Send a Birmingham postcode and hear from a director the same working day about the route.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

How do our planning consultants help in Birmingham?

What we do on a Birmingham site, from first appraisal to discharged conditions.

Surveying instrument on a tripod in front of a construction site with tower cranes

Site appraisal and planning route

We test the plot against BDP 2031 policies and the 2026 Publication Plan allocations, then name the consent route with the best odds.

Rolled drawings and plans stacked on a table, seen from above

Pre-application with the council

We buy the right tier of Birmingham's pre-app service and, for larger schemes, propose a planning performance agreement.

Three grey markers resting on a detailed hand-drawn city plan

Full and outline applications

Plans, planning statement and technical reports go to Birmingham City Council as one validated package.

Calculator lying on a sheet of handwritten workings

HMO and change of use

Since June 2020 every family house to small HMO switch in the city needs consent; we build the case under the HMO guidance.

Floor plan drawing with pencil

Costed while it is drawn

Our builders price each layout as it develops, so the consent you receive matches the budget you hold.

Building drawing open on a monitor at a desk

Refusals, conditions and appeals

We read each reason for refusal, then choose between a revised design, a condition variation or a Planning Inspectorate appeal.

Birmingham City Council planning: what developers need to know

White massing model of a scheme in front of plans pinned to a wall

BDP 2031 now, a new plan to 2044 next

Applications are still decided against the Birmingham Development Plan 2031, adopted on 10 January 2017. Its replacement, the Birmingham Local Plan, reached Publication stage when Cabinet approved it on 28 July 2026; consultation closed on 24 September 2026.

Read more

The council says it will submit the plan by December 2026, with examination expected early in 2027. The new plan looks to 2044, aims for 87,700 homes and puts brownfield regeneration first. Where an allocation in the emerging plan helps your site, we argue its weight; where it hurts, we lean on the adopted plan.

Decisions are slower than the national average

Over the year to June 2026, 45.5% of Birmingham decisions carried an extension of time. Major schemes met the deadline or an agreed date 78.7% of the time, against 91.2% in England.

Read more

Only 11.2% came inside 13 weeks with no extension. Minor housing schemes fared worse: 56.9% on time or agreed against 85.2% nationally, and just 3.9% within eight weeks. We build that delay into the purchase and finance dates. More in how long planning permission takes.

Aerial view of open farmland meeting the edge of a town under a low sun

HMOs, heritage and the Green Belt

A city-wide Article 4 direction has applied since 8 June 2020. Turning a family house into a small HMO for three to six people now needs full planning permission anywhere in Birmingham.

Read more

There are 29 conservation areas, the Jewellery Quarter and Bournville Village among them. Green Belt covers 3,720 hectares, 13.9% of the city's land; that figure did not change in 2025-26. See our notes on Article 4 directions for HMOs and green belt land.

CIL depends on the value zone

Birmingham started charging CIL on 4 January 2016. For homes permitted in 2026, the charge is £101.85 per m² in the high-value zones 1, 2 and 3.

Read more

Zones 4 to 7 pay nothing. Student housing pays £101.85 and city-centre hotels £39.85. Offices and industrial space pay nothing. That difference can decide which of two sites is worth buying, so we work it out first. Read CIL and Section 106 explained.

How it works

How do we take a Birmingham scheme through planning?

01

Share the site with us

A director looks up the planning history, the CIL zone, the Article 4 position and any designations, and gives you a first view the same working day.

02

Birmingham pre-app

We book the tier that fits: written advice for up to five homes costs £332.40 including VAT, 10 to 24 homes with a meeting £1,690.80. Larger schemes can add a planning performance agreement.

03

Layouts costed, one chosen

Our construction team prices each option and the appraisal carries CIL, affordable housing and biodiversity net gain before a scheme is fixed.

04

Application and officer

The package goes to Birmingham City Council. We deal with consultee comments and put any extension of time on paper rather than letting the clock drift.

05

Conditions cleared, building next

We discharge conditions and finish the technical design; depending on the scheme, construction can follow.

Cover of the free Craftex Guide to Planning and Prior Approval

The Craftex Guide to Planning and Prior Approval

Not sure whether your Birmingham building needs a full application, prior approval or a change of use consent? The free guide sets out each route, the statutory time limits, what a council needs before it validates an application and why schemes are refused. It covers the English system, so it applies in Birmingham, although the HMO Article 4 direction there removes one permitted development right.

Our promises

Six promises, written into your contract

Want them in writing for a Birmingham scheme? They come attached to our fee letter.

  1. You hear the bad news early

    If the Article 4 direction, a conservation area or the CIL zone makes a Birmingham scheme unworkable, we say so. That happens at the first review, before fees mount.

    four schemes tested at Allitsen Road and costed alongside a planning route.

  2. Every option arrives with a build cost

    Our own construction department prices what we draw, so a Birmingham consent is one you can afford to build.

    the Allitsen Road cost plans went out with the planning strategy.

  3. A single firm carries the risk

    Planning, design, cost and construction sit inside Craftex, so there is nobody else to point at if something slips.

    we build with our own construction team rather than hand the work to another contractor.

  4. No surprise invoices

    If officers ask for an extra report or another round, you see the cost and agree it before anyone starts.

    each variation signed off by you in writing.

  5. Large-scale planning experience at the top

    Before he joined Craftex, our Development Director Rob Barton was a housebuilding managing director and took over 10,000 homes through planning.

    Kennet Island in Reading, where his team won permission for 850 homes.

  6. Insurance a funder will accept

    £10M public liability and £10M employers' liability, professional indemnity on request, CHAS and ISO accredited.

    the £10M cover is live now.

Example planning quotation from another firm, items listed, with the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Has a Birmingham planning firm already sent you a fee proposal? Send it to us. We'll beat it. First, a director compares it with your site, the council's pre-app tier and the reports officers usually ask for. You then hear, the same working day, what is missing and the better offer we can make.

Compare your quotes

Why are planning applications refused in Birmingham?

Six things that sink or stall a Birmingham application, and what we do about each. Already refused in Birmingham? Forward the decision notice; we answer with the route most likely to succeed.

AreaThe usual riskWith Craftex
Small HMOs under Article 4a house bought for HMO use on the assumption it is permitted development, then refused.the street's existing HMOs and the HMO guidance checked before you buy.
Jewellery Quarter and other conservation areasmassing fixed first, heritage argued afterwards.the area's character studied up front and a heritage statement filed with the plans.
Two plans at oncea case built only on BDP 2031 while the 2044 plan is heading for examination.the scheme tested against both, with the weight of each set out for the officer.
CIL zone and viabilitya high-value zone charge and the affordable housing ask discovered after consent, when the appraisal no longer works.both priced into each option before submission.
Slow decisionsan application left to drift past its deadline while the purchase or the loan expires.an extension of time agreed early and a programme that allows for it.
After a refusalthe same scheme resubmitted with cosmetic changes.every reason answered, then an amended scheme or a Planning Inspectorate appeal, whichever reaches consent sooner.

Planning application fees in Birmingham, 2026

Birmingham City Council charges the national application fees set out in the Planning Portal's England schedule from 1 April 2026. Its own pre-application tariff for 2026 to 2027 and the 2026 CIL rates follow; every figure was checked on 4 November 2026. Our own fees are not published; a director talks them through once we know the site.

ItemCovers£
Full application, new homesEach dwelling, fewer than 10610
Full application, new homesEach dwelling, 10 to 50 (cap £427,537)659
Outline applicationEach 0.1 hectare, site under 0.5 ha610
Prior approval, Class MAEach new dwelling, commercial building to homes260
Removal or variation of a conditionNon-major / major development608 / 2,076
Discharge of conditionsAny development other than a householder one309
Birmingham pre-app, up to 5 homesWritten advice, incl. VAT (meeting £499.20 extra)332.40
Birmingham pre-app, 10 to 24 homesOne meeting, incl. VAT1,690.80
Birmingham pre-app, 50 to 99 homesOne meeting, incl. VAT5,072.40
Birmingham CIL, homes, zones 1 to 3Per m², permissions granted in 2026101.85
Birmingham CIL, homes, zones 4 to 7Per m², permissions granted in 20260

Our team

  • in

Planning consultants in Birmingham: your questions

How long does Birmingham City Council take to decide an application?

The statutory period is eight weeks, or 13 for a major scheme, but most Birmingham applications now run longer by agreement. In the year to June 2026, 45.5% of decisions had an extension of time. Only 3.9% of minor housing schemes were decided within eight weeks. Plan your finance with that margin.

Does Birmingham offer pre-app advice, and what does it cost?

Yes, through a planning officer, and it is optional. The 2026 to 2027 tariff, VAT included, starts at £332.40 for written advice on up to five homes. It rises to £5,072.40 for 50 to 99 homes with a meeting. Ecology advice on biodiversity net gain is charged separately.

How much do planning consultants charge for a Birmingham scheme?

That depends on the scale, the reports the council will ask for and whether an appeal is likely. We quote once we have seen the site and its history and do not publish a price list. Get in touch and we will discuss your project.

How do I tell if my plot is Green Belt or in a conservation area?

Check the council's interactive policies map: Green Belt covers 13.9% of the city and there are 29 conservation areas. Plots on the edge of the city may fall under Solihull, Sandwell, Walsall or another neighbour instead. We confirm the position at the first review.

Which plan applies, and is my site allocated?

Decisions today rest on the Birmingham Development Plan 2031. The new Birmingham Local Plan to 2044 is at Publication stage and due for submission by December 2026. Its allocations therefore carry growing but limited weight. We check both and tell you where your site stands.

Can you take a Birmingham refusal to appeal?

Yes. The appeal goes to the Planning Inspectorate, not back to the council. You have six months from the decision date to appeal a refused full application. We first check whether a revised scheme would get you there faster, then price the appeal on its own.

Must my planning consultant have a Birmingham office?

No, and we have no Birmingham office. Our team works from London, reads Birmingham policy and decisions online, and travels for site visits and officer meetings. Every application is submitted through the online portal, wherever the consultant sits.

Do I need planning permission to turn a Birmingham house into an HMO?

Yes, almost always. The city-wide Article 4 direction means even a small HMO, housing three to six people, needs an application, and larger HMOs already needed one. The council judges it against its HMO guidance, including how many HMOs are already nearby.

Can Craftex build the scheme once it is approved?

Depending on where the site is and what it is, we build it ourselves or put you in touch with a contractor we rely on. In both cases the scheme was costed by our builders before submission, so the consent is deliverable for the money.

What size of Birmingham scheme do you take on?

Schemes with a completed value between £3M and £150M, from HMOs and conversions to blocks of flats, small estates and mixed-use buildings. A one-off house extension is usually better served by a local architect, and we will say so.

What our clients say

See all reviews on Google
  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

A site in Birmingham? Send us the address.

Tell us what you have in mind. A director checks the planning history and the CIL zone and calls you back the same working day.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Your details are used only to answer your enquiry (privacy).

WhatsApp us