Kitchen Extension Cost in London (2026 Prices)

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Open-plan kitchen extension with a white island, roof lights between exposed steel beams and a pale timber floor

The short answer

A kitchen extension in London costs about £2,140 to £2,520 per m² with Craftex for the extension and the kitchen remodel (our 2026 rates, ex VAT and fees). A 30 m² kitchen extension comes to roughly £64,000 to £76,000.

  1. The kitchen units, worktops and appliances are a separate budget you choose.
  2. Add VAT at 20%, design and engineering fees and party wall surveyors.
  3. Steel, glazing and drainage move the price more than the floor area.
  4. Keep a contingency of 5% to 10% of the construction cost.

A kitchen extension in London costs about £2,140 to £2,520 per m² with us. That is our 2026 rate for the extension and the kitchen remodel, ex VAT and fees.

So a 30 m² kitchen extension comes to roughly £64,000 to £76,000. The kitchen units and appliances, VAT, fees and party wall costs come on top. This guide sets out each one.

We price a house extension designed and built by one team, so the drawings and the price come from the same people. See our house extension service, or book a site visit and we will price your kitchen with you.

How much a kitchen extension costs in London

The rates below are our 2026 London rates per m² of new floor. They cover the construction of the extension and the remodel of the room it opens into.

Our indicative 2026 rates per m² of new floor, construction only, ex VAT and fees: your fixed price comes after a survey and drawings.
Extension£ per m²30 m² extension40 m² extension
Glazed rear or garden extension£1,835 to £2,160£55,000 to £65,000£73,000 to £86,000
Kitchen extension and remodel£2,140 to £2,520£64,000 to £76,000£86,000 to £101,000
Orangery or double storey£2,450 to £2,880£73,000 to £86,000£98,000 to £115,000

Most kitchen extensions sit on the middle row. A simple glazed garden room sits on the first row, and an orangery or a second storey on the last row. Our build cost calculator gives a first figure for your size.

These are London rates, so they are higher than national averages. For the whole house picture, see our guide to house extension cost in London.

What is included in the price

A kitchen extension has two budgets: the room and the kitchen inside it. Our rate covers the room.

  1. The room. Foundations, walls, steels, the roof, glazing and the floor.
  2. The remodel. Opening the house into the new room, plastering and decorating.
  3. The services. Drainage for the sink, extract, heating and new electrical circuits.

The kitchen itself is a separate line. Units, worktops and appliances are supplied by you or by us, priced separately. Choose the kitchen before the extension is priced, so the drainage and power are designed for it.

Also outside our rate: VAT at 20%, design and engineering fees, the planning fee, party wall surveyors and a contingency of 5% to 10%.

Side return and wraparound extension costs

A side return extension builds in the narrow passage beside a period house. A wraparound joins a side return and a rear extension in an L shape.

Rear extension under construction: new steel beams on props, a brick boundary wall and the opened-up back of the house
Steel beams going in at the back of a house: the structure is a large part of the cost.

The same per m² rates apply to the new floor area. What changes the figure is the work around it:

  1. Steel. Taking out the side and back walls needs beams, and often a steel frame.
  2. The party wall. A side return usually builds on or next to the boundary wall.
  3. Roof glazing. A glazed roof over the side return costs more than a solid one.
  4. Drainage. Drains often run under the side passage and must be moved or protected.

That is why a side return or wraparound usually sits towards the top of the range.

What moves the budget

Once the size is set, these decide where in the range your kitchen extension lands.

  1. Steel and the knock-through. The wider the opening into the house, the bigger the steel.
  2. Glazing. Roof lights, a glass roof and wide sliding doors cost more than walls.
  3. Underfloor heating. It is usual in a new kitchen, and it adds to the floor cost.
  4. Drainage. If you build over or near a public sewer, the water company may need to agree it first.
  5. Party wall awards. Surveyors' fees rise when neighbours appoint their own.
  6. Ground and foundations. Clay, trees and drains can call for deeper foundations.
  7. Access. A garden reached only through the house adds time to every delivery.

Remortgaging to pay for it? Our guide to a remortgage for home improvements explains the options.

Planning, party wall and building control

Many single-storey rear kitchen extensions can be built under permitted development. The main limits for a house are:

  1. Single storey at the rear. Up to 3 metres on an attached house, or 4 metres on a detached house, and no more than 4 metres high.
  2. Larger rear extensions. Up to 6 or 8 metres through prior approval, outside protected areas.
  3. Side extensions. Single storey only, no more than 4 metres high and half the width of the house.
  4. Flats and conservation areas. Flats have no householder permitted development, and conservation areas tighten the rules.

Beyond those limits, a householder planning application costs £548 in England. Our guide to the permitted development rules for extensions has the detail.

Most London kitchen extensions touch a party wall. Notice is needed two months before work to a shared wall, and one month before nearby digging. Building control signs off the structure, the drains, fire safety and insulation. If you still need drawings, read our guide to choosing a house extension architect.

I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away. We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP. We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care. We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

Lia Lavryk, Google reviewSee all reviews on Google

Worked example and budget checklist

Here is an illustrative budget for a 30 m² kitchen extension on our kitchen and remodel rate. It is an example, not a project of ours.

Illustrative budget for a 30 m² kitchen extension in London, 2026
ItemHow it is priced
Extension and remodel, 30 m²£64,000 to £76,000 at our 2026 rates
Kitchen units, worktops and appliancesSupplied by you or by us, priced separately
Design and structural engineeringFees agreed before drawings start
Planning or prior approval£548 householder fee if an application is needed
Party wall surveyorsDepends on how many neighbours and surveyors
VAT20% on the works
Contingency5% to 10% of the construction cost

The firm price comes after a survey and the drawings, and any later change is priced and agreed in writing first.

We design, get the consents for and build kitchen extensions as one team. Our house extension team will price yours with you: book a site visit.

What to price before you ask for quotes

  • The new floor area in m², measured from the drawings
  • How wide the opening into the house will be
  • Roof lights, a glass roof or sliding doors, and their sizes
  • The kitchen: units, worktops and appliances, and who supplies them
  • Underfloor heating and the floor finish
  • Drains under the extension and any sewer nearby
  • Party wall notices for each neighbour
  • Planning or permitted development, and the fee
  • Design and engineering fees
  • VAT and a contingency of 5% to 10%

Frequently asked questions

How much does a kitchen extension cost in London?

About £2,140 to £2,520 per m² with us in 2026, ex VAT and fees. The kitchen units and appliances are priced separately.

How much does a side return extension cost?

The same per m² rates apply to its new floor area. Steel, the party wall and roof glazing usually take it towards the top of the range.

Is a kitchen extension cheaper than moving house?

It can be, but check it for your home. Compare the extension budget with the costs of moving, including stamp duty, agents' and legal fees.

Do I need planning permission for a kitchen extension?

Not always. Many single-storey rear extensions fall under permitted development. Larger ones, flats and homes in conservation areas often need planning permission.

How long does a kitchen extension take?

It depends on the size, the structure and the consents. The programme is set after a survey and the drawings, before you sign.

Does the price include the kitchen?

Our per m² rate covers the extension and the remodel. The kitchen units, worktops and appliances are supplied by you or by us, priced separately.

How much value does a kitchen extension add?

It depends on your street. Check sold prices of similar homes with an extended kitchen, or ask a local estate agent before you commit.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Planning a kitchen extension in London?

One team designs, gets the consents for and builds your extension and kitchen. Book a site visit and we will price it with you.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us