Skip to content
Request a callbackCallback
Hotel cocktail bar before opening: dark stone counter, leather bar stools and lit back-bar cabinets against blue panelled walls

Bar Fit Out and Pub Refurbishment

Bars, pubs and clubs designed and built to your opening night.

Craftex team

561 major construction projects delivered
(combined team experience)

Venue work we have delivered

  • 28 weeksa Chelsea hotel and its cocktail bar, a project we took part in
  • 8 weekson site: a Mayfair shop refitted without closing a day
  • 17 weeksMedusa, Knightsbridge: four levels, concept to handover
  • £10Mpublic and employers' liability cover

One team from the bar counter to the cellar

Craftex carries out bar fit out and pub refurbishment in London and across the UK: the bar and back bar, cellar lines, kitchen, extract, toilets and joinery under one contract. Our bar fitters work to your opening night: one team designs the room, builds it and hands it over ready to trade.

Your opening night is booked and the staff are hired. If the bar, the cellar or the extract is late, every closed week is lost trade. We design the room, build it and make the joinery ourselves, so nothing waits for a second firm.

What we build: bar counters and back bars, cellars, kitchens and extract, toilets, floors, lighting and frontages. For whom: bars, pubs, cocktail bars, hotel bars and clubs. Where: London first, and venues across the UK. Not for us: home bars, or one new counter on its own.

Signing a lease soon? Book a free site visit first, and we will tell you what the unit means for your opening night.

Joiner measuring a timber frame on the bench, with power tools on the workshop wall

Why do bar and pub openings slip?

Craftex team at work on the Medusa fit-out in Knightsbridge: first-fix electrics, joinery and making good

Most bar openings slip for the same reasons. The finished room and the licence plan show two different bars. The extract and the music are too loud for the neighbours. The drains, power and cooling are not where the bar stations need them when the joinery arrives. We settle all of this before the build starts, because every closed week costs you trade.

Read more

A premises licence under the Licensing Act 2003 comes with a plan of the premises. If the bar, the seating or the exits move, the plan may need to change too. Most leases also need the landlord's written consent, called a licence for alterations. Listed pubs and pubs in conservation areas need consent for changes to the bar back, the tiles or the frontage.

People search for this work in many ways: bar fit out London, pub fit out, bar refurbishment, nightclub fit out or bar installation. It is the same job: a venue made ready to trade on the night you open.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does a bar fit out include?

Six parts of a bar or pub, designed and built under one contract.

Timber-lined bar with a long counter and a lit back bar full of bottles

Bar counters, back bars and serveries

The back bar, servery and joinery, made in-house by the team that builds the room.

Row of chrome beer taps on a bar, with the lines running behind

Cellar lines, drainage, power and cooling

Cellar lines, drains and power run to every bar station, with routes ready for your cooling supplier.

Pub dining room with timber tables and an open kitchen pass behind the counter

Kitchens and extract for food-led pubs

Kitchen, extract and ventilation built with your kitchen supplier. Read our guide to a restaurant kitchen fit-out.

Pub washroom with dark green tiles, white basins, brass taps and round mirrors

Toilets, floors, lighting and ceilings

Hard-wearing toilets and floors, lighting scenes and ceilings ready for your sound system.

Red-painted London pub frontage with brass lanterns, hanging flowers and small-paned windows

Frontage, signage and outside seating

A new or restored frontage, signs and outside seating, with the planning drawings.

Smoke detector on a slatted timber ceiling

Fire alarm, emergency lighting and certificates

Fire alarm and emergency lighting tested, with every certificate handed over.

Pub refurbishment contractors for trading pubs

Warm pub interior with timber tables, booths and the bar at the back

Keep the pub trading while we work

We refurbish in phases, so part of the pub stays open. Noisy work goes to nights and closed days, and the bar is clean every morning. We kept Drake's Savile Row shop open throughout its refit, and worked nights and weekends at Portsoken House.

Period London pub room with timber panelling, leather chairs and tall windows

Period and listed pubs

Old pubs have bar backs, tiles, timber and frontages worth keeping. We repair what is there and draw the changes for listed building consent. Read our guide to pub refurbishment in London.

Read more

Pub refurbishment companies, pub fit out companies and pub fitters often do only one part: the joinery, or the building work. We do both. In a tenanted pub the pub company usually signs off the works. In a managed house the operator decides. We prepare the drawings and the pack each side needs.

Need bar fitters for a cocktail bar, hotel bar or club?

Hotel cocktail bar with a marble island counter, brass lamps and velvet seating

A cocktail bar works only if the bar itself works. Stations, ice wells, glass wash, speed rails and a lit back-bar display are built from shop drawings by our joiners. Hotel and members' club bars are built next to guests and members. In Chelsea, Craftex took part in a 28-week remodel of a boutique hotel and its cocktail bar, beside a members' club that stayed open. For the look, read our guide to bar design.

How it works

How does a bar fit out run, lease to opening night?

01

Free site visit

We check the extract route, the bar position, the cellar and the landlord's rules.

02

Design and fixed price

We draw the room and the licence plan, then give you a fixed price.

03

Consents

We prepare the drawings for the landlord, planning and Building Regulations.

04

Build, joinery and tests

We build the room, fit the joinery and test every service.

05

Ready for opening night

We snag, clean and hand over before your opening night.

Cover of the free Craftex guide to hospitality design

The Craftex Guide to Hospitality Design

How to plan a venue that guests remember and staff can run, what drives the budget, and the checklist that keeps a fit-out on track to opening night. Free to download.

Our promises

Six promises, written into your contract

These are the terms we build every bar and pub to.

  1. One team, brief to opening night

    Design, bar, kitchen, extract and build under one contract, led by the same directors throughout.

  2. The agreed price stands

    A fixed lump sum for a written scope, with the programme in the contract. Any change is priced and agreed in writing first.

  3. Your opening date holds

    The programme is built back from the night you open, with long-lead items ordered early.

    Medusa, Knightsbridge, four levels in 17 weeks

  4. Built faster, with our own trades

    Around 60% of the labour on site is ours, including the joinery, so no week is lost waiting.

  5. £10M cover on every job

    Public, employers' and professional indemnity cover. ISO 9001, 14001 and 45001, CHAS and SafeContractor.

  6. Ready to trade on day one

    Zero snags, with the electrical, fire and extract certificates and the health and safety file handed over at the keys.

Example fit-out quotation from another contractor with the total circled, and the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Got a quote for your bar or pub from a shopfitter or a builder? Send it to us before you sign. A director reads it line by line and comes back with our price for the same work, plus a programme that keeps your opening night.

Compare your quotes

Where do bar fit outs go wrong?

Check any plan or quote against these six points. Each one can push back an opening night. Most of these problems start before anyone is on site: a unit signed before the extract route, the cellar or the lease was checked. Our free site visit looks at all three first.

AreaThe usual riskWith Craftex
Licence planThe room that is built does not match the licence planThe licence plan is drawn with the room, and changes are flagged at once
NoiseExtract or music noise brings complaints in the first weekExtract and sound are planned with the neighbours and the council in mind
Bar servicesNo drainage or power where the bar stations standDrains and power are run to every station before the joinery
JoineryBar joinery ordered before the site is measuredOur joiners make the bar from shop drawings after a site measure
LandlordThe landlord's consent is asked for too lateWe send the drawings for the licence for alterations at the design stage
Opening nightThe opening is booked before the certificates are in handTests and certificates are in the programme before the handover date

What sets the budget of a bar or pub fit out?

Six things decide what your bar or pub costs. We settle each one with you before you sign. The calculator below gives a first range for your floor area. We fix your price after the site visit and an agreed layout, and it does not move unless you change the scope.

What moves the budgetWhat we fix before you sign
The bar, back bar and joineryThe length of the bar, the stations and the finishes
Kitchen and extractThe kitchen layout and the extract route to the roof
Cellar, drainage and coolingWhere the cellar lines, drains and cooling run
Toilets and wet areasThe number of toilets and how they are finished
Listed building and frontageWhat must be kept and what consents are needed
Working while you tradeThe phases, night work and closed days you can allow

Free cost calculator

What will your bar fit out cost?

Enter your floor area and pick a scope. You get a first range for your bar fit out cost straight away, ex VAT and fees. Loose furniture and your drinks equipment are not included.

Add
Your estimateEnter your spaceex VAT and fees Book a free site visit

Indicative, ex VAT and fees, for a sound building with services available. Excludes loose furniture, drinks equipment, external ductwork and structural openings. We fix the price after the site visit.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Bar fit out: your questions

Can you refurbish a pub while it keeps trading?

Yes, in most pubs. We work in phases, with noisy jobs at night or on closed days, and leave the bar clean for each service.

Do you make the bar and back bar yourselves?

Yes. Our joiners make the bar, back bar and servery from shop drawings, after we measure the site.

Who handles the licence plan, planning and the landlord?

We prepare the drawings for the licence plan, planning and the landlord's pack. The premises licence itself is your application to the council.

How long does a bar fit out take?

It depends on the size, the kitchen and the consents. We set your programme at the site visit; our case studies show real programmes.

What does a bar fit out cost?

It depends on the bar, the kitchen, the cellar, the toilets and how long you can close. Use the calculator above for a first range.

Do you fit out cocktail bars in hotels and members' clubs?

Yes. Sloane Place in Chelsea, a hotel with a cocktail bar, is a project Craftex took part in; the members' club next door stayed open.

Can you work on a listed pub?

Yes. We keep what matters, such as the bar back, tiles and frontage, and draw the changes for consent. See our guide to pub refurbishment.

Do you fit out nightclubs and late-night venues?

Yes. For late venues we design the sound and the fire plan first, because they shape the whole room.

Is there a minimum project size?

We take on whole venues and full refurbishments. For a single bar counter or a bar at home, a local joiner will serve you better.

Do you work outside London?

Yes. Most of our venues are in London, and we take on bars and pubs across the UK.

How fast do you reply?

Fast: from Monday to Saturday, 8am to 6pm, you hear back within the hour. Urgent? Message us on WhatsApp: we reply straight away, any day.

What our clients say

See all reviews on Google
  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Opening or refurbishing a bar or pub?

Send us the address, the size and the night you need to open. A director looks at it and books your free site visit.

Unit 5, 160 Buckingham Palace Road, London SW1W 9TR

info@craftex.co.uk

MESSAGE US ON WHATSAPP

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

Your details are used only to answer your enquiry (privacy).

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us