Skip to content
Request a callbackCallback
Penthouse entrance hall with a polished marble floor, a large abstract painting and a view through to the living room

Apartment and Flat Renovation

Prime flats and penthouses rebuilt inside occupied buildings.

Craftex team

561 major construction projects delivered
(combined team experience)

Flats and penthouses we have rebuilt

  • £550KKensington penthouse, designed and rebuilt
  • 12 weeksKensington Olympia, handed over with zero snags
  • 290 sq mCanary Wharf penthouse: 10 weeks, tower occupied
  • £10Mpublic and employers' liability cover

One team for your whole flat

Craftex carries out apartment renovation and flat refurbishment across London: design, strip-out, services, joinery and finishes under one contract. We rebuilt a 400 sq m Kensington penthouse in 12 weeks in a lived-in block, and a 290 sq m Canary Wharf penthouse in 10 weeks with the tower occupied.

What we do: whole-flat renovations, from the layout and the services to the kitchen, bathrooms and joinery.

For whom: owners of prime flats, apartments, penthouses and mansion-block flats, and their buying agents and interior designers.

Where: central and west London, including Kensington, Chelsea, Belgravia, Knightsbridge and Marylebone, and Canary Wharf.

Just bought a flat, or planning a move-in date? Book a free survey of your flat first. We walk it with you and tell you what the lease, the building and the structure allow.

Hammer and picture hooks on a tiled floor next to two framed prints waiting to be hung

Why do flat renovations in London run late?

Sunlit communal hallway of an apartment building with a timber floor, a white-framed window and framed pictures

Most flat renovations run late for the same reasons. The freeholder's licence for alterations comes late, so work cannot start. The building's rules slow every day: set working hours, one lift and booked deliveries. Noise rules mean floors need acoustic underlay. Pipes and risers are shared with the neighbours. We settle all of this before the build starts.

Read more

Most leases need the freeholder's written consent, called a licence for alterations, before you change walls, floors, kitchens or bathrooms. The managing agent sets the building rules: working hours, lift bookings, protection of the common parts and how waste leaves the building. Listed buildings and mansion blocks in conservation areas can need consent for changes to windows, doors and period features.

People search for this work in many ways: flat renovation London, flat refurbishment London or apartment refurbishment London. It is the same job: a whole flat rebuilt, ready for you to move in.

Trusted by leading businesses

  • Trainline
  • Auto Trader
  • YouTube
  • Medusa
  • Fuse
  • Drakes
  • PTOS
  • Close Connections
  • Marnie
  • Vortex Post
  • Minds Ahead
  • Missy
  • Fora
  • Gama Healthcare
  • Equinix
  • Hubble
  • B-Engineering

What does an apartment renovation include?

Six parts of a flat renovation, designed and built under one contract.

Design team leaning over a floor plan spread across a table, marking up the layout

Design, layout and drawings

A new layout and interior design, with the drawings your freeholder needs for the licence.

Room stripped back for renovation, with a stepladder, joinery and materials on the floor

Soft strip and walls

Old finishes stripped out and selected walls removed, after the structure is checked.

Corridor ceiling with lagged ductwork, a cable tray and linear lighting before it is closed in

Electrics, plumbing, heating and smart home

New or reworked services and smart home controls, tested before the walls close.

Finished apartment kitchen with gloss white units, an island and built-in ovens

Kitchens, bathrooms and joinery

Kitchens, bathrooms, wardrobes and joinery made to measure for your rooms.

Apartment hallway with a walnut floor, a walnut sliding panel and a frosted glass door

Floors, ceilings and lighting

Floors laid with acoustic underlay, new ceilings and lighting, from downlights to pendants.

Glazed door from a living room onto a renewed balcony high above Canary Wharf

Balconies and terraces

Balconies and terraces restored, with new decking where it is worn out.

How do you renovate a flat in an occupied building?

Georgian room with panelled walls, a cornice, a marble fireplace and wide oak floorboards

Working with the managing agent and the neighbours

We agree working hours, lift bookings and deliveries with the managing agent before we start. The common parts are protected every day, and noisy work runs only in the agreed hours. At Pan Peninsula we agreed the works and the deliveries with the management team, and the tower stayed occupied.

Dark timber dressing room joinery with lit shelves and hanging space

Mansion blocks and period flats

Older flats have cornices, floors and doors worth keeping. We repair what is there and refurbish the joinery. At Pan Peninsula we kept and refurbished the joinery, floors and doors, and fitted new ironmongery.

Read more

A licence for alterations from the freeholder usually comes first. Work on or near a wall you share with a neighbour can need party wall notices. The building's insurer may ask to see our cover: £10M public, employers' and professional indemnity.

Penthouse refurbishment in London

Penthouse living room and kitchen with a hand-applied blue wall finish, a white sofa and an oak floor

A penthouse adds work a normal flat does not: terraces, roof plant, large glazing and the only lift you can use. At Kensington Olympia we designed and rebuilt a 400 sq m penthouse for £550K. It took 12 weeks, with every other flat in the block lived in, and was handed over with zero snags. At Pan Peninsula in Canary Wharf we refurbished a 290 sq m penthouse in 10 weeks, for £274K, with the tower occupied.

How it works

How does a flat renovation run, survey to move-in?

01

Free survey

We walk the flat with you and check the lease, the building rules and the structure.

02

Design and fixed price

We draw the layout and the interior, then give you a fixed price.

03

Licence and building rules

We prepare the drawings for the freeholder and agree hours, lift and deliveries.

04

Build and test

We build the flat and test every service before the walls close.

05

Snag, clean and hand over

We snag, clean and hand over the keys with every certificate.

Cover of the free Craftex Guide to Residential Design and Build

The Craftex Guide to Residential Design and Build

What to decide before you appoint anyone for a prime home: the brief, the budget, the consents and the programme, plus the questions that separate a fixed figure from an estimate. Free, and a ten-minute read.

Our promises

Six promises, written into your contract

These go into the contract for every flat we renovate.

  1. One team, one contract

    Design, consents, construction and joinery under one contract, and one director accountable for the whole flat.

  2. The agreed figure stands

    Changes are priced and signed in writing before the work is done, never after.

  3. Ready on the date

    The programme is fixed in the contract, with long-lead joinery and stone ordered at design stage.

    Kensington Olympia penthouse, 12 weeks

  4. Private and discreet

    No boards, no names, the building and the neighbours protected, your name and flat number kept off our website.

  5. Covered for your insurer and freeholder

    Public and employers' liability on every job, ISO 9001, 14001 and 45001, CHAS, professional indemnity on request.

  6. Every certificate, nothing left open

    We leave when it is right: Building Regulations sign-off, test records and the aftercare dates in writing.

Example home renovation quotation from another firm, items listed, with the note: send it to us, we will beat it

Already have a quote? Send it to us. We'll beat it.

Have an estimate for your flat from another builder? Send it to us before you sign. A director reviews it line by line and comes back with our price for the same work.

Compare your quotes

Where do apartment renovations go wrong?

Check any plan or quote against these six points. Each one can push back your move-in date. Most of them start before anyone is on site, which is why our free survey looks at the lease, the building and the structure first.

AreaThe usual riskWith Craftex
LicenceWork starts before the licence for alterations is signedThe drawings go to the freeholder at the design stage, and work starts once consent is given
Building rulesThe building's hours are ignored and complaints stop the jobHours, lift and deliveries are agreed with the managing agent before we start
FloorsHard floors laid without acoustic underlayAcoustic underlay goes under every hard floor, to the building's rules
Shared servicesShared risers opened without telling the agentWork to shared pipes and risers is agreed with the agent first
KitchenThe kitchen is ordered before the walls are measuredKitchens and joinery are made after a site measure
HandoverNo certificates for the freeholder at the endEvery test certificate and sign-off is handed over with the keys

What sets the budget of a flat renovation?

Six things decide what your flat renovation costs. We settle each one with you before you sign. The calculator below gives a first range for your floor area. We fix your price after the survey and an agreed layout.

What moves the budgetWhat we fix before you sign
Size and layout changesWhich walls move, and what the structure allows
Services, new or reusedWhich electrics, plumbing and heating are replaced
Kitchen and bathroomsHow many, and how they are finished
Joinery and finishesWardrobes, doors, floors and wall finishes
Building rulesWorking hours, lift use and delivery slots
Terraces and glazingDecking, balustrades and any window work

Free cost calculator

What will your flat renovation cost?

Enter your floor area and pick a scope. You get a first range for your flat renovation cost straight away, ex VAT and fees.

Your estimateEnter your spaceex VAT and fees Book a free survey

Indicative, for flats and apartments, ex VAT and fees. Excludes loose furniture, the freeholder's fees and the licence costs. We fix the price after the survey.

Our team

  • in

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Apartment renovation: your questions

Can you renovate a flat while the neighbours live in the building?

Yes. Hours, the lift and deliveries are set with the managing agent before work starts, and the common parts are protected. At Pan Peninsula the tower stayed occupied throughout.

Do I need the freeholder's permission?

Usually, yes. Most leases need a licence for alterations before work starts. We prepare the drawings the freeholder asks for. Read our guide to a licence for alterations.

How long does a flat renovation take?

It depends on the size and the scope. Our Pan Peninsula penthouse took 10 weeks and Kensington Olympia 12 weeks. We set your programme at the survey.

What does it cost to renovate a flat in London?

It depends on the size, the layout changes, the services and the finishes. Use the calculator above for a first range; we fix the price after the survey.

Can you move walls, kitchens and bathrooms in a flat?

Often, yes. We check the structure, the drainage falls and the lease first, because some walls and wet rooms cannot move.

Do you renovate penthouses with terraces?

Yes. At Pan Peninsula we restored the balcony and renewed the decking as part of the penthouse refurbishment.

Can you work in a listed or mansion-block flat?

Yes. We keep what matters, such as cornices, doors and floors, and draw the changes for any consent the building needs.

Do you design as well as build?

Yes. One team designs the layout and the interior, prices it and builds it, under one contract.

Is there a minimum project size?

We take on whole flats, from about £100,000. For a single kitchen or bathroom, a local fitter will serve you better.

Do you work in Belgravia, Kensington and Chelsea?

Yes. We renovate flats across central and west London, including Belgravia, Kensington and Chelsea.

How fast do you reply?

Fast. From Monday to Saturday, 8am to 6pm, you hear back within the hour. On WhatsApp we answer straight away, any day.

What our clients say

See all reviews on Google
  • This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
    The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
    I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.

    Наталия Цимбалюк

  • Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.

    Vlad

  • Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.

    Motush Motushev

  • Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.

    Rhea Langford

  • Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.

    Misha Levit

  • I’d like to thank the team at Сraftex for the work they did on our office.
    It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
    We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
    Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.

    IURII PYLYPETS

  • We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
    Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
    Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.

    Adam Miah

  • Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.

    Pascal Hunt

  • Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.

    Akshay Khanna

  • Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.

    Александр Хоменко

  • I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

    John Smith

  • Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.

    Pawel Kamionka

  • Highly recommended!
    Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.

    Monika Kamionka

  • We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.

    A Google User

  • Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.

    Cucu Iulian

  • We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.

    Simone Racaku

  • My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.

    Ion Bounegru

  • I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.

    Taron Papoyan

  • I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.

    Artur Dvorak

  • Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
    The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
    The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.

    Roma Shchukin

  • We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!

    Polina Lysenko

  • I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.

    Mykyta Khadzhynov

  • The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!

    Alaa Betar

  • We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.

    Ben Edell

  • These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.

    Богдан Главацкий

  • We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.

    Ardian Beleshi

  • I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.

    Rami Jusupova

  • We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍

    Apartify Estates

  • Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.

    Hainro Eybers

  • Holistic therapy space fit-out
    Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.

    Dariia Shvyryda

  • Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody

    Nikita Nigai

  • Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++

    Mikhail Burdoev

  • I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
    We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
    We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
    We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

    Lia Lavryk

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • CHAS
  • Constructionline Gold
  • SafeContractor
  • TrustMark
  • FMB
  • NICEIC
  • NAPIT
  • MCS
  • CSCS
  • Considerate Constructors
  • RICS, Royal Institution of Chartered Surveyors
  • RIBA, Royal Institute of British Architects
  • ARB, Architects Registration Board
  • Public & Employers' Liability £10M
  • Professional Indemnity £10M
  • ISO 9001, 14001 and 45001 certified

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

Your details are used only to answer your enquiry (privacy).

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us