Industrial and Factory Fit Out
Power, ventilation, offices and welfare for production units, built while you keep working.
Craftex team
561 major construction projects delivered(combined team experience)
Industrial units we have fitted out
- 2,500 sq mfitted out in 8 weeks in Banbury, site kept running
- 4 weeksfor a Hackney engineering unit, about a week early
- 500 sq mrailway arch fitted out for Drake's in 8 weeks
- £10Mpublic and employers' liability cover
One team for the power, the air and the rooms
Craftex carries out industrial fit out for factories, workshops and production units in London, the South East and across the UK: power, ventilation, offices, welfare and mezzanines under one contract. Our industrial fit out contractors fitted out a 2,500 sq m unit in Banbury in 8 weeks while the site kept running, and a Hackney engineering unit in 4 weeks.
Taking on a unit is a big bet. If the power, the air or the floor is wrong, the line stops and the rent keeps running. We design and build the power, the air, the floor and the rooms as one job, so nothing waits for a second firm.
What we build: power upgrades, extraction, production floors, offices and welfare inside the unit, mezzanines, lighting and fire alarms. For whom: manufacturers, engineering and R&D firms, food producers and trade businesses. Where: London and the South East first, and units across the UK. Not for us: a few sockets, or a mezzanine on its own.
Not sure the unit can carry your plant? Book a free unit check before you sign the lease or order machines.
What makes an industrial fit out different from an office one?
In an office, the people set the building. In a factory or workshop, the process does. Your machines decide how much power the unit needs, how much air must be pulled out and how strong the floor must be. They also decide the drainage, the fire plan and how people stay apart from forklifts and vans. Get one of these wrong and production stops. We check all of them before we fix the price, so you are not paying for surprises later.
Read more
Most industrial units sit in one of three use classes. E(g)(iii) covers light industrial work that can sit near homes. B2 is general industrial. B8 is storage or distribution. Moving from one class to another can need planning permission, so we check the use class first. Most leases also need the landlord's written consent, called a licence for alterations, before you change walls, power or the roof.
People search for this work in many ways: industrial fit out contractors, factory fit out, industrial unit fit out, manufacturing fit out or workshop fit out. It is the same job: a unit made ready for your process and your people.
Trusted by leading businesses
5 stars on every review on Trustpilot
- Excellent project delivery Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard… Hainro Eybers 9 May 2025
- Really happy with our beauty salon design and fit-out, stress-free and on time I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Rami Jusupova 24 May 2025
- My experience with Craftex was… My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better… Ion Bounegru 6 Oct 2025
- Great company to work with as always Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution. Akshay Khanna 18 Nov 2025
What does an industrial fit out include?
Six parts of an industrial unit, designed and built under one contract.
Power upgrades and three-phase supply
New boards and three-phase power to every machine, including high-voltage connections, as in Banbury and Hackney.
Ventilation, fume and dust extraction
Fresh air and extraction sized for your process. In Hackney, workstation extract discharges 12 m above the roof.
Production and workshop areas
Floors, drainage, safety showers, marked walkways and steel barriers that keep people safe.
Offices and welfare inside the unit
Offices, changing rooms with lockers and storage rooms inside the building, as in Banbury.
Mezzanine floors and storage
Extra floor space above the workshop, built as part of the fit-out. Read our guide to mezzanine floor regulations.
Lighting, heating, fire alarm and certificates
LED lighting, heating and fire alarms, all tested, with every certificate handed over.
Factory refurbishment while production runs
Keep producing while we build
We split the work into phases around your shifts. Noisy and dusty work goes to nights and weekends. Dust screens and safe routes keep your team and the works apart. In Banbury, the site kept running for all 8 weeks.
Bring an older unit back to life
An industrial refurbishment brings a tired unit up to date. We make good the floors, fit new roof lights, redecorate and put in new services. A factory refurbishment can also fix a unit before you sign a new lease.
Read more
Some work belongs to the landlord and some to the tenant. Landlord works usually cover the roof, the shell and the main supply. Tenant works cover the fit-out inside. If you own the unit and want to let it, read our guide to industrial unit refurbishment to let.
How it works
How does an industrial fit out run, survey to switch-on?
01
Free unit check
We visit and check the power supply, the floor, the use class and the lease.
02
Design and fixed price
We design the layout and the services, then give you a fixed price.
03
Consents and fire plan
We get the landlord's consent, Building Regulations approval and the fire strategy.
04
Build in phases and test
We build in phases around your work and test every service.
05
Handover with certificates
You get the keys, the drawings and every certificate on the last day.
The Craftex Guide to Warehouse and Industrial Fit Out
What to check in a unit before you sign, how power, floors and air shape the budget, and the checklist that keeps a fit-out on track from survey to handover. Free to download.
Our promises
Six promises, written into your contract
These are the terms we build every industrial unit to.
-
One team, survey to keys
One contract and one point of contact, led by the same directors from the first visit to handover.
-
The agreed price stands
A fixed lump sum for a written scope, with the programme in the contract. Any change is priced and agreed in writing first.
-
Your production never stops
Work in phases, noisy work out of hours and safe routes kept clear, so your lines keep running.
Banbury, built inside a working unit
-
Built faster
Around 60% of the labour on site is our own, so no week is lost waiting for trades.
Drake's, a 500 sq m railway arch in 8 weeks
-
£10M cover on every job
Public, employers' and professional indemnity cover. ISO 9001, 14001 and 45001, CHAS and SafeContractor.
-
Zero snags at handover
We do not leave until it is right. Test certificates and the health and safety file are yours on the last day.
Already have a quote? Send it to us. We'll beat it.
Got a quote for your factory, workshop or production unit? Send it to us. A director reads it line by line and comes back with our price for the same work, plus a programme that keeps your lines running.
Compare your quotes
Where do industrial fit outs go wrong?
Check any plan or quote against these six points. Each one can stop production or add weeks. Most of these problems start before anyone is on site: a unit signed before the power, the floor or the lease was checked. Our free unit check looks at all three first, so you know what the unit can carry.
| Area | The usual risk | With Craftex |
|---|---|---|
| Power | The supply is too small for the machines, and it is found after the lease is signed | We check the supply at the free unit check, before you sign or order plant |
| Services design | A services design that looks fine on paper but cannot be built | In Hackney we redesigned the electrical layout, heating and lighting from scratch, then built it |
| Air | Extraction and fresh air sized like an office, not for your process | Extraction and fresh air sized for your machines and fumes |
| Floor | A floor that cannot take the plant or the racking | We check the floor against your plant and racking before the layout is fixed |
| Landlord | The landlord's consent asked for too late, so work cannot start | We send the drawings for the licence for alterations at the design stage |
| Production | Production stopped because the works were not split into phases | Work phased around your shifts, with nights and weekends for noisy jobs |
What sets the budget of an industrial fit out?
Six things decide what your fit-out costs. We settle each one with you before you sign. The calculator below gives a first range for your floor area. Your fixed price follows the unit check and an agreed layout, and it does not move unless you change the scope.
| What moves the budget | What we fix before you sign |
|---|---|
| Power and the size of the supply | The power your machines need, and whether the supply must grow |
| Ventilation and extraction | The air and fume extraction your process needs |
| Floors, drainage and structure | The floor strength, drainage runs and any steel needed |
| Offices and welfare inside the unit | The number of offices, changing rooms and toilets |
| Mezzanines and storage | The size and loading of any mezzanine floor |
| Working while production runs | The phases, night work and safe routes for your shifts |
Free cost calculator
What will your industrial fit out cost?
Enter your floor area and pick a scope. You get a first range straight away, ex VAT and fees. It does not cover your machines or racking. Your fixed price follows the free unit check.
Industrial units we have fitted out
Three units fitted out by our own team: an engineering unit, a whole working site and a railway arch, each handed over on the agreed date.
-
Fuse Energy, Hackney, London An engineering and research unit of 120 m² with 6 m ceilings. Phase 1 took 4 weeks, about a week early, and the client came back for phase 2. About £115K across both phases. View case study
-
Banbury, Oxfordshire The whole 2,500 sq m unit, designed and built for £350K over 8 weeks with the site running: offices, changing rooms, power, ventilation, floors and barriers. View case study
-
Drake's railway arch, Bethnal Green A 500 sq m arch with design, services and building control by one team in 8 weeks, with stock and racking moved. View case study
Our team
- in
Sviatoslav is a self-made entrepreneur with a degree in mechanical engineering and over 10 years of hands-on experience in the UK construction industry. Starting as a demolition labourer and carpenter on London job sites, he personally worked through every stage of the building process — from groundwork and fit-out to project planning, estimating, procurement, and full-scale management.
This unique, bottom-up experience allows him to run projects with maximum efficiency, clear communication, and minimal friction — both on site and with clients.
Under his leadership, Craftex has delivered high-end residential and commercial projects across London, known for their snag-free finishes, smooth execution, and strong pre-construction planning.
Today, Sviatoslav oversees the company's operations and delivery teams while spearheading its expansion into design & build and high-value commercial sectors, including office fit-outs, data centres, and property development ventures.
Clients value his deep technical insight, clear leadership, and relentless focus on delivering clean results — on time, on budget, and to the highest standard.
-
Rob leads Craftex's development partnerships with landowners, investors and family offices.
Over 20 years he has held Managing Director and Land Director roles at plc housebuilders, including Berkeley Homes, Countryside and St Modwen, and has been directly responsible for delivering more than 3,000 private homes, 1,000 affordable homes and 750 build-to-rent homes. His schemes include Acton Gardens (2,340 homes), St Andrew's Park, Uxbridge (1,340 homes) and the Old Vinyl Factory, Hayes.
Rob has served as a non-executive director of three housing associations and two private housebuilders. He holds a first-class engineering degree, a postgraduate diploma in financial strategy from Oxford, an MBA from London Business School and a Master of Studies from Cambridge, where his research focused on AI in construction.
-
Joe has 37 years of experience working on both the commercial and operational side of construction. His previous works cover multiple sectors, including high-end residential refurbishments, new build construction, and commercial property renovations. Examples include the fit-out of Dior’s flagship store on Bond Street and residential developments in Belgravia. Budgets have also varied, with projects ranging from £100K to £135M. This experience and the transferrable skills gained enable Joe to successfully manage any project, regardless of type, style, or value.
At Craftex, Joe is responsible for ensuring the smooth operation of all designs and builds. With a collaborative approach and strategic thinking, he ensures our high standards and happy customers are maintained. He is heavily involved in developing and implementing innovative procurement solutions, as well as envisaging any potential problems along the way for proactive and preventative project management. Joe also takes on the role of influencing the design process and supporting development in others, passing on his wealth of skills and knowledge to the team.
-
Martin has over 50 years of experience in construction having started in the industry as a labourer at the age of 16. Since then, he progressed to site manager before running his own company from 1987 to 1996. Turning to contracts management shortly after, Martin now has 18 years of experience in the role. During this time, he has led multiple high-quality building projects, with a particular passion for sustainable methods and technological advancements in construction.
At Craftex, Martin is responsible for preconstruction and project management, offering innovative solutions and ensuring all aspects of the projects run smoothly. He is also pivotal in the implementation of digital solutions and SaaS tools, enabling more efficient project management and process analysis, besides pushing us closer to our 100% paper-free pledge.
-
With a unique set of skills honed over the past 16 years in the retail and commercial sector both in the UK and overseas, Konstantin Jegorovs brings a wealth of experience, insights and knowledge to his role as Craftex’s Projects Director.
A graduate of construction management from Oxford Brookes university, Konstantin has led flagship projects of up to £5 million in value for commercial banks, complex fit outs of occupied commercial office premises, innovative and challenging aparthotels and high-end residential projects for the UAE Royal Family.
Overseeing every single element of each project from the initial consultation to delivery phase, Konstantin is intrinsic to Craftex’s customer service and collaboration offering, thanks to a proactive and forward-thinking approach. He deploys his experience in the development and improvement of policies, processes and strict adherence to ISO business management systems to ensure the flawless delivery of Craftex projects, with an unwavering commitment to quality that ensures each client gets the maximum return for their investment.
Fluent in both Russian and English and with a plethora of industry-relevant qualifications, Konstantin is a valuable asset to the Craftex team and committed to helping our clients see their visions become reality.
Refer a project
Earn 5–10% lifetime commission
from the revenue we generate from your introduction.
Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.
Rates and conditions apply. See the referral terms.
Industrial fit out: your questions
Can you fit out a unit while we keep producing?
Yes. The works run in phases that fit your shifts, with noisy work at nights and weekends. In Banbury, the 2,500 sq m site kept running for all 8 weeks.
How do we know the power supply is enough?
We check it at the free unit check. If the supply is too small, we plan the upgrade, including high-voltage connections, as we did in Banbury and Hackney.
Do you design the services as well as install them?
Yes. We design the power, heating, lighting and extraction, then build them. For the Hackney unit, our team drew a new electrical, heating and lighting design before building it.
Do we need the landlord's consent?
Usually, yes. Most leases need the landlord's written licence for alterations first. We prepare the drawings the landlord asks for. Read our guide to the licence for alterations.
Do we need planning permission for a factory fit out?
Not usually for work inside the unit. You may need it to change the use class, for example from B8 to B2, or for new plant, flues or extraction outside. Read more in how to fit out an industrial unit.
How long does an industrial fit out take?
It depends on the size and the services. A 120 m² unit in Hackney took 4 weeks; 2,500 sq m in Banbury took 8 weeks. We set your programme at the unit check.
What does an industrial fit out cost?
It depends on the power, the air, the floor, the rooms and how much you keep running. Use the calculator above for a first range. We fix your price after the free unit check.
Do you build offices and welfare inside the unit?
Yes. In Banbury we built offices, storage rooms and changing rooms with lockers inside the unit. Meeting rooms, toilets and a kitchen are planned with you at the design stage.
Do you install mezzanine floors?
Yes, as part of a fit-out, with the stairs, handrails, lighting and fire protection they need. Read our guide to mezzanine floor regulations first.
Do you work outside London?
Yes. Most of our work is in London and the South East, and we take on units across the UK, like the 2,500 sq m unit in Banbury.
How fast do you reply?
Fast: from Monday to Saturday, 8am to 6pm, you hear back within the hour. Urgent? Message us on WhatsApp: we reply straight away, any day.
Read before you take on an industrial unit
Written from industrial units we have fitted out: power, consents, mezzanines and the lease.
What our clients say
See all reviews on Google-
Fuse Energy hired Craftex on the fit-out and installation of our engineering and research centre, which included electrical, heating, lighting, plumbing, and ventilation upgrades. They delivered everything to a high standard and were proactive throughout — even working weekends to help speed up the programme, despite not being contracted to. They managed last-minute changes very well, communication was clear and consistent, and the team was professional from start to finish. We’d happily recommend Craftex to anyone needing a reliable construction partner.
Hainro Eybers
-
We recently worked with Sviat and the Craftex team on a complete warehouse refurbishment, and the results have been outstanding. From the very beginning, their team was professional, organized, and attentive to every detail. The project was completed on time and within budget, without disrupting our day-to-day operations.
Simone Racaku
-
Craftex carried out a warehouse fit-out for us, and I couldn’t be happier with the outcome. The space has been completely transformed into a highly organized and efficient environment that makes our daily operations much smoother.
The team was professional but also very approachable — I always felt comfortable asking questions or giving feedback. They came up with smart, practical solutions that worked perfectly for our setup, and everything was explained clearly along the way.
The best part was how they stuck to the agreed timeline, finishing on schedule without cutting corners. It’s rare to get both quality and reliability, but Craftex delivered both.Roma Shchukin
-
Craftex has completed a range of both small and large-scale projects on our commercial property with exceptional precision and quality. Dmitriy consistently delivers courteous, prompt service and has shown great flexibility in accommodating last-minute changes to plans and timelines. I highly recommend Craftex for their professionalism and outstanding workmanship.
Pascal Hunt
-
Hired Craftex for our conversion project. We had to convert a 600m2 office into 8 apartments. Guys did an excellent job in terms of program efficiency and quality of the finishes which gave us a big upside to exit the project 2 months faster than other competitors’ timelines.
Misha Levit
-
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Rhea Langford
-
I’d like to thank the team at Сraftex for the work they did on our office.
It was really important for us to get the work done quickly, but without compromising on quality, as we regularly have clients and guests visiting and needed to move into the new office within a month.
We spent around two weeks discussing and agreeing all the details before the work started. What I really appreciated was that everything we agreed beforehand was actually followed through during the job. The work was also completed on time.
Thanks to the whole Сraftex team for a great job. I’d definitely use them again if we need any work done in the future.IURII PYLYPETS
-
We recently worked with Craftex and honestly couldn’t be happier with the results. From start to finish, the team was professional, reliable, and highly skilled. The quality of workmanship exceeded our expectations, and everything was completed on time and to a very high standard.
Communication throughout the project was excellent, and they always went above and beyond to make sure we were satisfied. It’s rare to find a construction company that combines professionalism, attention to detail, and great customer service so well.
Without a doubt, Craftex is one of the best construction companies we have ever worked with. Highly recommended to anyone looking for quality and trustworthy builders.Adam Miah
-
Great company to work with as always. Super flexible at dealing with evolving requirements and fast deployment and execution.
Akshay Khanna
-
Hired Craftex to do the full design and fit out of my gym in Chelsea. Super efficient and fast team. They gave the best price and a proper fast track program. We managed to open in less than 6 weeks with no headaches or surprises during construction. Quality was great, we had zero snags on completion. I’ve worked with a few companies before but these guys really impressed me from project management to how they treat the client. Top GGs.
Александр Хоменко
-
I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.
John Smith
-
Happy with the end result. Tight timeline but they pulled it off. The team worked late shifts and even weekends to help us open the doors on schedule. Site was always left tidy at the end of the day and no surprise charges either. Good communication throughout. Would definitely use Craftex again.
Pawel Kamionka
-
Highly recommended!
Craftex are the kind of fit-out contractors in London you can truly trust. From the very first meeting, they understood our vision and gave practical ideas to make the most of our space. They turned our old storage area into a clean, efficient, and well-organized warehouse. The team was professional, easy to work with, and clearly took pride in their work.Monika Kamionka
-
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
A Google User
-
Sviat and his team at Craftex were brilliant to work with on our office redesign. From the first meeting, they took the time to understand how we actually use the space rather than just pitching generic solutions. They came back with clever, practical ideas to maximise use of the space and get more employees and desks inside . Every step was handled professionally, and the process felt surprisingly smooth for a project of this size. They finished one week ahead of schedule, and the transformation is clear — our office feels brighter, more functional, and much more welcoming. I’d happily recommend Craftex to anyone who wants a reliable design team that also makes the journey enjoyable.
Cucu Iulian
-
My experience with Craftex was excellent from beginning to end. They took the time to really listen to what I wanted and then offered practical suggestions that made the design even better. I always felt like they cared about creating a space that worked for me, not just one that looked nice on paper. The end result is an office that feels stylish, welcoming, and very functional for day-to-day work. The process itself was straightforward, well-managed, and never stressful. I’d definitely recommend Craftex if you’re looking for office design and build services in London — they made the whole journey a positive one.
Ion Bounegru
-
I’m really pleased with my experience working with Craftex. As a commercial construction firm, they handled everything from start to finish without any unnecessary stress on my side. What impressed me was how they suggested practical ideas that improved the design while also keeping things realistic. The communication was always clear, so I never felt out of the loop. The project ran smoothly, deadlines were met, and the end result is exactly what I was hoping for — a space that feels both functional and modern. It’s not easy finding contractors who are this reliable, but Craftex definitely proved they can be trusted.
Taron Papoyan
-
I had an amazing experience working with Sviat and the Craftex team on our office fit-out in London. They were always professional, responsive, and quick to offer the best advice whenever decisions needed to be made. I really appreciated how they balanced style with practicality — the office doesn’t just look fantastic, it works perfectly for our team. Everything was done with care and attention to detail, and the project never felt overwhelming because they managed it so well. Communication was clear from start to finish, and I always felt involved in the process. I would happily recommend Craftex to anyone looking for a trustworthy contractor.
Artur Dvorak
-
We’re extremely happy with Sviat and the Craftex team’s work. They suggested clever ideas, managed the project efficiently, and delivered a functional, modern space. The team was easy to communicate with and very professional throughout the process!
Polina Lysenko
-
I can honestly say our office has been completely transformed thanks to Craftex. From the very first meeting, the team was approachable, professional, and full of creative ideas that really made sense for our business. They didn’t just focus on how the space would look but also how it would work for the team day-to-day. The new layout is efficient, modern, and welcoming, and you can tell they really thought about the details. The whole process was smooth and surprisingly stress-free. They kept me updated at every stage, which gave me confidence. I’m really happy with the results and wouldn’t hesitate to recommend them to anyone.
Mykyta Khadzhynov
-
The results from Craftex’s commercial refurbishment in London are fantastic. The team was friendly, clear in communication, and made sure the project stayed on track. The workspace now feels efficient, welcoming, and modern. Definitely a team you can trust!
Alaa Betar
-
We hired Craftex for a commercial ground floor fit-out with 2 flats above. There were some minor co-ordination hiccups with third-party suppliers but the team kept it moving. Finish quality was strong. Kitchens and doors look great. I have already asked them for a quote on the next project.
Ben Edell
-
These guys actually deliver. They handled our first industrial to residential conversion near Tower Bridge, turned an old warehouse into 4 modern flats. They stuck to the plan, kept the site clean and the timing was on point. No hidden extras, no drama, just a professional construction company in London that gets the job done.
Богдан Главацкий
-
We recently hired Craftex for a commercial office fit-out project in Central London, and overall, we’re really happy with the result. There was a delay on our side with a custom glass partition supplier, but the Craftex team managed the construction schedule very professionally and kept everything on track. Their guys worked clean, respected our workspace and IT setup, and kept the site tidy throughout. If you're looking for a reliable office refurbishment company in London, I’d definitely recommend Craftex. Would use them again without hesitation.
Ardian Beleshi
-
This was a full high-end renovation of my Victorian rental apartment in Westminster, just off Sloane Square and Belgravia. The scope included full fit-out: electrics, plumbing, a new bespoke kitchen, and a luxury bathroom refurbishment. Craftex took care of everything and made the process easy. They weren’t the cheapest, but you can tell they really know what they’re doing when it comes to prime London property renovations.
The team was professional, organised, and genuinely seemed to care about getting everything right. I was especially impressed with the quality of the finish – the attention to detail really shows in every corner.
I’m very happy with the results and would definitely recommend Craftex to anyone looking for reliable, high-quality renovation work in Central London.Наталия Цимбалюк
-
I was stressed about timing since we had bookings lined up, but they smashed it. Even worked Saturday to finish the floor. My clients love the look — the beauty salon fit-out turned out exactly how I wanted. Couldn’t have pulled it off without their help. Genuinely appreciate the way they communicated throughout the refurbishment. If you need reliable help with beauty salon design or fit-out, especially in a place like Chelsea — these are the guys.
Rami Jusupova
-
We used Craftex for a shop-to-flat conversion in Chelsea — turning an old retail space into two rental units. Access wasn’t the easiest, but the guys handled it well, no drama. Quote was clear, no hidden extras, and they actually stuck to it, which is rare. Finish came out solid, exactly what we needed for rentals. Joe (PM) kept things ticking and communication was always on point. All in all, smooth job — would use them again for sure.👍
Apartify Estates
-
Holistic therapy space fit-out
Super impressed. I had a very specific vision for the studio. calm tones, soft lighting, hidden storage etc. the craftex team just got it. build was done quicker than I expected and the guys were polite, tidy and actually listened. we had 2 snags on day one but they fixed it before the week was out. worth it for the peace of mind.Dariia Shvyryda
-
Made a full refurbishment and redesign of our Central London office. Fantastic work, quality service and reliable people. Can recommend it to everybody
Nikita Nigai
-
Amazing experience with these guys. I trusted them my apartment in London and Business. They are always accurate, very professional, responsive and neat. They would always advice me right things for my best interest. I had luxury experience with them and I would definitely recommend Craftex to everyone.
Motush Motushev
-
Could not be HAPPIER with Sviat and the Craftex team, they certainly showed me that they’re the number one office design company in London that we’ve had the pleasure of working with. They gave us a unique design just like we wanted, and we loved the first initial draft of the concept. Also have to give them props for Construction, I gave them a tight timeline as we needed to move our team in ASAP, so they pulled double shifts and I didn’t see a drop in quality. Will be to talking to the team when we move up to our next bigger office. Highly recommended A+++
Mikhail Burdoev
-
Very professional company. Craftex did brilliant minimalistic design and completely refurbished my apartment to the highest quality.
Vlad
-
I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away.
We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP.
We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care.
We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.Lia Lavryk
- Public & Employers' Liability £10M
- Professional Indemnity £10M
- ISO 9001, 14001 and 45001 certified
Taking on a unit, or refitting the one you are in?
Send us the address, the size of the unit and what you make there. A director looks at it and books your free unit check.



























