For owners of prime London homes
Best Indoor Swimming Pool Builders in London (2026)
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 6 min read
The short answer
The best indoor swimming pool builders for a London house are the ones who build the room around the pool: structure, waterproofing, air handling and the plant room, not only the tank. Compare them on finished indoor pools of your size and on who answers for the whole room.
- Ask who designs the dehumidification, and who answers if the room runs wet.
- Check who builds the structure under the tank, and who signs it off.
- Agree where the plant room goes, and how the plant gets in and out.
- Visit a finished pool hall and call the owner before you sign.
An indoor pool is a room full of warm, wet air inside your house. The tank is the easy part. When you compare indoor swimming pool builders in London, ask who answers for the whole room.
This guide is written by a London team that designs and builds pool rooms and the houses around them. Our indoor swimming pool construction service covers the whole job. Below we also say when another kind of builder will suit you better. Thinking of a pool? Book a site visit before the drawings are fixed.
What decides which pool builders you need
Every pool builder shows beautiful photos of blue water. Fewer can explain how they handled the six things below. Use them as your interview.
1. Air, heat and condensation
A heated pool puts water into the air all day. Without the right dehumidification, it runs down the windows and into the walls of the house. Ask who designs the air handling and who answers if the room runs wet.
2. The structure under the tank
A full pool is very heavy. The floor, the walls and the ground below must carry it. Ask who designs the structure, who builds it and who signs it off.
3. Waterproofing and tanking
The tank must hold water in, and the room must keep water out of the house. Ask how the tank and the room are waterproofed, and who guarantees each layer.
4. The plant room
Pumps, filters, heating and air handling need their own room. Ask how big it is, where it goes and how the plant gets in and out when it is replaced.
5. The neighbours and the borough
A pool in a new basement means digging near the neighbours. You may need party wall notices, and many London boroughs limit basements. Our guide to a basement swimming pool sets out the rules.
6. The cost and what is left out
Ask every builder the same question: what is not in your price? For the figures, read our guide to indoor swimming pool cost.
The main types of pool builders compared
Swimming pool builders in London come in five main types. These are typical patterns, not judgements on any one builder. Every type has strong and weak names in it.
| Type of builder | Best for | Watch out for | Who holds the contract and the warranty |
|---|---|---|---|
| Specialist pool companies | The tank, the lining, filtration and water treatment | The room, the structure and the air may be left to others | The pool company, for the pool only |
| Pool designers | The look, the layout and the spa suite | The build is handed to others later | You, with each builder chosen later |
| Main contractors who build the whole room (Craftex) | One team for the room, the pool, the plant and the house | Not set up for kit pools or servicing | The main contractor, for the whole room |
| Basement contractors with a pool sub-contractor | A new basement dig with a pool in it | Two teams share the risk at the tank | The basement contractor, if it is in writing |
| Kit and above-ground pool suppliers | Simple pools and quick installs | Not built for a prime London house | The supplier, for the kit |
When you compare swimming pool construction companies, ask who holds the contract for the whole room. If nobody does, a damp wall becomes your problem.
Eight checks before you sign
Use these eight checks on every shortlist. They take an afternoon and can save months.
- Finished indoor pools. Ask for two indoor pools like yours and visit one.
- A call with a past client. Ask what went wrong, and how it was put right.
- Air handling. Ask who designs it, and for the design in writing.
- Structure. Ask who the structural engineer is and who checks the work.
- Plant room. Ask for its size, where it goes and how plant is replaced.
- Programme. It should show the survey, consents, the dig and long-lead items.
- Exclusions. Every item not in the price should be listed.
- Insurance and memberships. Ask for certificates. For pool companies, you can check membership of SPATA, the Swimming Pool and Allied Trades Association.
Want a second view on builders you are already talking to? Book a site visit and we will walk the house with you.
Where Craftex fits and where it does not
We are a London design and build team. We design the room, build the structure, the pool and the plant, and finish the house around it, under one contract. When a pool sits in a new basement, our basement conversion team digs it.
We are a good fit for indoor pools in prime London houses, basement pools and whole-house projects with a pool. Prime homes start from £100,000 with us. Every job carries £10M of insurance cover.
We have no private indoor pool case study of our own published yet. What we can show is below: a spa we designed and built, and pool and home work from our senior team's earlier careers.
Where Craftex is not the right fit
- Pool kits and above-ground pools. A kit supplier will be better value.
- Hot tubs. A hot tub dealer can supply and install one.
- Liner swaps and pool servicing. A local pool service company suits this.
- Outdoor pools on their own. A specialist outdoor pool company will suit you better.
For the look of the room before you choose a builder, read our guide to indoor pool design. Adding a spa suite too? See our guide to a home steam room.
Indoor pool and spa projects we have worked on
One spa we built, and two jobs from our senior team's earlier careers, show the work that matters around a pool.
Medusa, Knightsbridge: a spa over four levels in 17 weeks
Medusa is a salon and spa on Beauchamp Place: 180 sq m over four levels, for £460K. We took it from concept to handover in 17 weeks. We also handled the planning applications for the outside ventilation units, with the noise assessment they need. Plant, air and the neighbours matter just as much around a pool.
Francis Holland School: a pool hall refurbishment
The Francis Holland School pool hall is our senior team's earlier work, from 2007, before Craftex was founded. A pool hall is a hard place for materials: water, chemicals, damp air and bare feet every day.
Herbert Crescent, Knightsbridge: a prime home
Herbert Crescent is a 450 m² house in Knightsbridge, refurbished in 32 weeks with neighbours all round. It is our senior team's earlier experience, from before Craftex. It shows the care a prime house needs when a big job happens inside it.
Great experience from start to finish. Communication was clear, the workmanship was excellent, and the whole project was managed professionally.
Questions to ask every pool builder
Take these to each meeting. A builder who answers them clearly, in writing, deserves a place on your shortlist.
Our indoor swimming pool construction team is happy to answer every one of these. If you are comparing pool builders now, book a site visit and put the questions to us.
Ten questions to ask every pool builder
- Which two indoor pools like ours can we visit, and can we call the owners?
- Who designs the dehumidification, and who answers if the room runs wet?
- Who is the structural engineer, and who checks the structure under the tank?
- How are the tank and the room waterproofed, and who guarantees each layer?
- Where does the plant room go, and how is the plant replaced?
- Does our borough limit basements, and do we need party wall notices?
- What does your programme assume for each approval?
- What is excluded from your price?
- What insurance do you hold, and can we see the certificates?
- Who do we call if something fails in the first year?