Skip to content
Request a callbackCallback

For businesses planning a new office

Best Office Interior Designers in London (2026)

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Open-plan office floor in a converted building with timber columns, tall windows, curved desks and planters

The short answer

The best office interior designers for a London business are the ones whose drawings get built on budget: a layout tested against your headcount, priced while it is drawn. Compare them on finished offices of your size and on who answers for the build.

  1. Ask for a test fit of your floor against your headcount before you sign.
  2. Ask who prices the design, and when the price is fixed.
  3. Check who handles the landlord, the services and the fire strategy.
  4. Visit a finished office and call the client before you sign.

A good office drawing is the easy part. What lets London businesses down is a design that costs more than the budget, or does not fit the team. When you compare office interior designers in London, ask who prices and builds what they draw.

This guide is written by a London team that designs and builds offices. Our office design and space planning service covers the layout, the look and the build. Below we also say when another kind of designer will suit you better. Have a floor in mind? Book a site visit before you sign the lease.

What decides which office designers you need

Every studio shows beautiful finished offices. Fewer can explain how they handled the five things below. Use them as your interview.

1. A layout that fits your team

Your floor has to hold your people now and in three years. Ask for a test fit: a quick plan of your floor against your headcount. Our guide to office layout types shows the main options.

2. A price while the design is drawn

A design that is priced only at tender can come back far over budget. Ask who prices the design, and at which stage the price is fixed.

3. The landlord and the Cat A

Most London offices are let at Cat A, with ceilings, lighting and air already in. Your design sits on top of it, and the landlord must approve the drawings. Ask who prepares them.

4. Services and the fire strategy

New rooms change the air, the lighting and the fire escape routes. Ask who designs the mechanical and electrical work, and who checks the fire strategy.

5. The budget and what is left out

Ask every designer the same question: what is not in your price? Furniture, AV and IT are often left out. Construction on a Cat A floor in good order with us is £63 to £108 per sq ft, ex VAT. Our guide to office design and fit-out cost explains what moves it.

The main types of office designers compared

Office design companies in London come in five main types. These are typical patterns, not judgements on any one firm. Every type has strong and weak names in it.

Types of office interior designers compared
Type of firmBest forWatch out forWho holds the build contract and the price risk
Design-only studios (interior architects)A distinct look and a detailed briefThe design is priced only when it goes to tenderYou, with the builder chosen at tender
Design and build fit-out firms (Craftex)One team for the layout, the price and the buildFewer outside studios to choose from for the lookThe design and build firm, for the whole job
Furniture dealers with a design serviceDesks, chairs and storageWalls, services and consents left to othersYou, with a separate builder
Workplace strategy consultantsHow your team will use the officeThey advise; someone else designs and buildsYou, with the firms you appoint later
Architects for whole buildingsNew buildings and major changes to the shellA fit-out may not be their focusYou, with a main contractor

When you compare office designers in London, ask who holds the build contract and the price risk. If the answer is you, plan time and money for the tender. Our space planning vs office design guide explains which stage comes first.

Eight checks before you sign

Use these eight checks on every shortlist. They take an afternoon and can save months.

  1. Finished offices of your size. Ask for two London offices like yours and visit one.
  2. A test fit and your headcount. Ask for a plan of your floor with your desk count on it.
  3. Who prices the design, and when. Get the price stage in writing.
  4. Cat A, Cat B and the landlord's licence. Ask who prepares the landlord's pack.
  5. Mechanical, electrical and fire. Ask who designs them and who signs them off.
  6. Furniture and AV, in or out. Agree what is in the price.
  7. A programme around your lease date. It should show approvals and long-lead items.
  8. Aftercare. Ask who you call if something fails in the first months.

Want a second view on the firms you are already talking to? See our office fit-out firms compared, or book a site visit and we will walk the floor with you.

Where Craftex fits and where it does not

We are a London design and build team for offices. We test the layout against your headcount, design the look, price it as we draw it and build it, under one contract.

We are a good fit for whole floors and buildings, refreshes of a lived-in office and moves against a lease date. We take on office projects from £100,000 to £10M and more. Every job carries £10M of insurance cover.

One client wrote that "with their architect they came up with a very smart design for our office to fit more desks".

Another wrote: "They came back with clever, practical ideas to maximise use of the space".

Where Craftex is not the right fit

  1. One-room makeovers. New paint and furniture in one room suit a local decorator.
  2. Furniture-only orders. A furniture dealer will be better value.
  3. Styling. Plants, art and accessories alone suit an interior stylist.

Planning a boardroom or meeting rooms? See our guide to meeting room design.

Offices we have designed and built

Three office projects show what a designer who also builds protects: the budget, the dates and the people still working.

Open-plan office at Beaumont House with a living wall, glass meeting rooms and a timber meeting table
Beaumont House, Kensington: a 750 sq m office floor rebuilt by Craftex in 3 weeks.
1,550 sq mPortsoken House: two floors fitted out from scratch
7 monthsPortsoken House, with the building fully leased
3 weeksBeaumont House: 750 sq m rebuilt, others quoted 12
12 weeksPortsoken reception: nights and weekends only

Portsoken House, Aldgate: two floors from scratch

At Portsoken House we fitted out 1,550 sq m on two floors in 7 months, for £2.2M. The rest of the building was fully leased, so the work had to fit around the tenants. We also redesigned and rebuilt the 70 sq m reception in 12 weeks of nights and weekends.

Beaumont House, Kensington: 750 sq m in 3 weeks

At Beaumont House the client had 5 weeks left on the old lease. Other contractors quoted 12 weeks. We rebuilt the 750 sq m floor in 3 weeks, for £350K. More than 150 staff moved in before the old lease ended.

I worked perfectly with Sviat and Joe, with their architect they came up with a very smart design for our office to fit more desks and optimise the space to its maximum capacity. They also did excellent value engineering on the MEP design proposed by others, allowing us to save around £50K. The quality and speed were outstanding we finished two weeks ahead of schedule. Highly recommend these guys.

John Smith, Google reviewSee all reviews on Google

Questions to ask every office designer

Take these to each meeting. A designer who answers them clearly, in writing, deserves a place on your shortlist.

Our office design and space planning team is happy to answer every one of these. If you are comparing office interior designers now, book a site visit and put the questions to us.

Ten questions to ask every office designer

  • Which two London offices like ours can we visit, and can we call the clients?
  • Can you do a test fit of our floor against our headcount?
  • Who prices the design, and when is the price fixed?
  • Who prepares the drawings for our landlord?
  • Who designs the mechanical, electrical and fire work?
  • Are furniture, AV and IT in your price?
  • How does your programme fit our lease date?
  • Who builds the design, and who holds that contract?
  • What insurance do you hold, and can we see the certificates?
  • Who do we call if something fails after we move in?

Frequently asked questions

How do I choose office interior designers in London?

Shortlist designers with finished London offices of your size. Ask for a test fit, ask who prices the design and who builds it. Visit a finished office and call the client.

Should the same firm design and build our office?

Often, yes. One firm for both means the design is priced as it is drawn, and one contract covers the whole job. A design-only studio suits you if you want to tender the build.

What does an office interior designer cost?

It depends on the size of the floor and the scope. Some designers charge a fee; design and build firms often include design in the build price. Our cost guide sets out what drives the total.

How long does office design take before works start?

It depends on the floor, the landlord and your decisions. The programme is set after a survey. Our Beaumont House floor of 750 sq m was rebuilt in 3 weeks.

Can you design around our landlord's Cat A?

Yes. Most London offices are let at Cat A. We design the Cat B layout on top of it and prepare the drawings your landlord needs to approve.

What size of office does Craftex take on?

We take on office projects from £100,000 to £10M and more, from one floor to whole buildings. We don't take on one-room makeovers or furniture-only orders.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Planning a new office, or a refresh of the one you have?

One team designs, prices and builds your office, so the drawings you approve are the office you get. Book a site visit.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us