For businesses refurbishing an occupied office
Best Office Refurbishment Specialists in London (2026)
Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read
The short answer
The best office refurbishment specialists in London are the ones who can rebuild your floor while your team keeps working: phased areas, noisy work at night, every certificate at handover. Compare them on occupied offices they have finished, not on photos of empty floors.
- Ask for the phasing plan: which areas close, and when.
- Ask what work happens at night and at weekends.
- Check who gets the landlord's licence for alterations.
- Visit an office they refurbished with people in it, and call the client.
An office refurbishment is hardest when your team is still in the building. The new floor is the easy part. When you compare office refurbishment specialists in London, ask how they keep your business working.
This guide is written by a London team that refurbishes and fits out offices. Our office refurbishment and fit-out service covers the whole job, from survey to handover. Below we also say when another kind of firm will suit you better. Have a floor in mind? Book a site visit and we will walk it with you.
What decides which refurbishment specialist you need
Every refurbishment firm shows bright, empty offices. Fewer can explain how they handled the five things below. Use them as your interview.
1. Your team keeps working
Most businesses cannot close the office. The work has to be split into phases, with each area finished before the next opens. Ask each firm how its last two occupied jobs were phased.
2. Noise, dust and your IT
Drilling, cutting and dust do not mix with meetings and servers. Ask what work runs at night and at weekends, and how your IT and desks are protected.
3. The landlord
Most office leases need a licence for alterations before work starts. The landlord will want drawings and method statements. Ask who prepares them.
4. Services, fire and certificates
New walls change the air, the lighting and the escape routes. Ask who designs the mechanical and electrical work, who tests it and who hands over the certificates.
5. The budget and what is left out
Ask every firm the same question: what is not in your price? Furniture, AV, IT and moves are often left out. Construction on a Cat A floor in good order with us is £63 to £108 per sq ft, ex VAT. Our guide to office refurbishment cost explains what moves it.
The main types of office refurbishment specialists compared
Office refurbishment companies in London come in five main types. These are typical patterns, not judgements on any one firm. Every type has strong and weak names in it.
| Type of firm | Best for | Watch out for | Who holds the price and programme risk |
|---|---|---|---|
| Design and build fit-out firms (Craftex) | One team for the layout, the price and the works | Not set up for one-off repairs | The design and build firm, for the whole job |
| Main contractors with an interiors arm | Large refurbishments inside bigger building works | Smaller floors may not be their focus | The main contractor |
| Trade-led refurbishment firms | Decorating, flooring and ceilings | Design, services and the landlord left to you | You, trade by trade |
| Furniture dealers who manage builders | New desks and storage with light works | The building work is sub-let to others | Often you, with the builder they bring |
| Project managers who tender the work | Running a tender for you | They advise; someone else builds | You, with the contractor chosen at tender |
When you compare office refurbishment contractors, ask who holds the price and the programme. If nobody does, every delay becomes your problem. For an occupied office, also ask who plans the phases and who answers to your team on site.
Eight checks for an occupied office
Use these eight checks on every shortlist. They take an afternoon and can save weeks of disruption.
- A phasing plan. Which areas close, in what order, and for how long.
- Night and weekend work. Which jobs run out of hours.
- Dust, noise and IT protection. How desks, servers and meeting rooms are kept clean and quiet.
- Fire and escape routes during the works. How your team gets out safely at every phase.
- The landlord's licence. Who prepares the drawings and when they are sent.
- Testing and certificates. Who tests the electrics, fire alarms and air, and when you get the certificates.
- Furniture and moves. Who moves desks and kit between phases.
- Aftercare. Who you call if something fails after handover.
For a full list of what to plan, use our office refurbishment checklist. Our guide to refurbishing while occupied explains the phasing in more detail.
Where Craftex fits and where it does not
We are a London design and build team for offices. We survey the floor, plan the phases around your team, design, price and build it, under one contract.
We are a good fit for whole floors and buildings, offices that must stay open and moves against a lease date. We take on office projects from £100,000 to £10M and more. Every job carries £10M of insurance cover.
One client wrote: "We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected."
Another wrote: "Made a full refurbishment and redesign of our Central London office."
Where Craftex is not the right fit
- A single repair or a quick change. Our urgent office alterations team handles fast, small works.
- Redecoration only. New paint and carpet suit a decorating firm.
- Furniture-only orders. A furniture dealer will be better value.
Offices we refurbished around working teams
Three office projects show what a refurbishment specialist must protect: your dates, your team and the people around you.
Beaumont House, Kensington: 750 sq m before the lease ended
At Beaumont House the client had 5 weeks left on the old lease. Other contractors quoted 12 weeks. We refurbished the 750 sq m floor in 3 weeks, for £350K, and moved the staff in before the old lease ended.
Portsoken House, Aldgate: two floors in a fully leased building
At Portsoken House we fitted out 1,550 sq m on two floors in 7 months, for £2.2M. The rest of the building was fully leased and in use. We also rebuilt the 70 sq m reception in 12 weeks of nights and weekends, so tenants came and went as normal.
We brought in Craftex to refurb our London office and honestly, they made the whole thing way easier than we expected. They listened, suggested ideas we wouldn’t have thought of, and explained everything clearly. Not the cheapest quote we got, but the end result shows why, the place looks modern, clean, and our team actually enjoys being here now. Communication was spot-on too. No chasing and confusion, deadlines were hit. If you want people who genuinely care and don’t treat your project like “another job,” I’d recommend them.
Questions to ask every refurbishment specialist
Take these to each meeting. A firm that answers them clearly, in writing, deserves a place on your shortlist.
Our office refurbishment team is happy to answer every one of these. If you are comparing specialists now, book a site visit and put the questions to us. Urgent? Message us on WhatsApp: we reply straight away, any day.
Ten questions to ask every office refurbishment specialist
- Which two occupied London offices like ours can we visit, and can we call the clients?
- What is your phasing plan for our floor?
- Which work will run at night and at weekends?
- How will you protect our desks, IT and meeting rooms from dust and noise?
- How will our escape routes work during each phase?
- Who prepares the drawings for our landlord's licence?
- Who tests the electrics, fire alarms and air, and when do we get the certificates?
- Who moves our furniture and kit between phases?
- What is excluded from your price?
- Who do we call if something fails after handover?