Best Basement Builders in London: How to Choose (2026)

Sviatoslav JerdetchiiCEO & Founder of Craftex. Updated , 5 min read

Finished basement lounge with navy walls, high-level windows, a brick fireplace, bookshelves and an oak-look floor

The short answer

The best basement builders in London are the ones who answer for the whole dig: the structural engineer, the party wall awards, the waterproofing guarantee and the finished rooms. Compare them on finished London basements and on who holds the risk if water gets in.

  1. Ask who the structural engineer is, and who checks the temporary works.
  2. Ask who serves the party wall notices and pays the surveyors.
  3. Check which waterproofing grade is designed, and who guarantees it.
  4. Visit a finished London basement and call the owner before you sign.

A new basement is the riskiest job most London houses ever see. The finished room is the easy part. When you compare basement builders in London, ask who answers for the dig, the neighbours and the water.

This guide is written by a London team that designs, digs and finishes basements and the houses above them. Our basement conversion service covers the whole job. Below we also say when another kind of builder will suit you better. Thinking of a basement? Book a site visit before the drawings are fixed.

What decides which basement builders you need

Every basement builder shows bright finished rooms. Fewer can explain how they handled the five things below. Use them as your interview.

1. The structure and the temporary works

A basement is dug under a standing house. The walls are underpinned and propped while the ground comes out. Ask who the structural engineer is, and who checks the props and the temporary works on site.

2. The neighbours and the party wall

Most London basements dig near a neighbour's foundations. Notice must be served before work starts, and surveyors agree an award with each neighbour who does not consent. Ask who serves the notices and who pays the surveyors.

3. Waterproofing and the guarantee

Water is the biggest long-term risk. BS 8102 sets three grades of protection, and living rooms need the highest one. Ask which grade is designed, who installs it and who holds the guarantee.

4. The borough

Many London boroughs limit basements. Ask each builder how they handle your borough's rules, the construction method statement and the traffic plan.

5. The cost and what is left out

A new basement, dug and finished, costs about £2,295 to £2,700 per m² with us, ex VAT and fees. Excavation depth, underpinning and groundwater are priced from the survey. Our guide to basement conversion cost in London explains the rest.

The main types of basement builders compared

Basement companies in London come in five main types. These are typical patterns, not judgements on any one firm. Every type has strong and weak names in it.

Types of basement builders compared
Type of builderBest forWatch out forWho holds the contract and the waterproofing guarantee
Basement specialistsThe dig, the structure and the waterproofingThe finished rooms and the house above may be left to othersThe specialist, for the shell
Design and build firms who build the house and the basement (Craftex)One team for the dig, the rooms and the houseNot set up for small cellar tankingThe design and build firm, for the whole job
General builders with a basement sub-contractorA basement inside a wider house refurbishmentTwo teams share the risk at the wallsThe builder, if it is in writing
Waterproofing companiesTanking and drainage systemsThey do not dig or build the structureThe waterproofing company, for its system only
Architects who tender the workDesign and planningThe build is tendered to others laterYou, with the contractor chosen at tender

When you compare basement contractors in London, ask who holds the waterproofing guarantee. If the answer is split between firms, a leak becomes an argument. Ask for the guarantee terms before you sign.

London rules every basement builder must handle

These rules shape every London basement. A good builder plans for them before the first drawing.

Deep trench dug beside the brick wall of a house, with broken slab and a wheelbarrow on site
Digging beside a house: the structure, the props and the neighbours come first.
  1. Planning permission. Digging a new basement is likely to need planning permission. Adding a lightwell often does too.
  2. Borough basement policies. Kensington and Chelsea allows one storey under a normal house and no more than half of each garden. Westminster and Camden have their own basement policies.
  3. Construction method statement. Kensington and Chelsea asks for one with the application, with a traffic plan for the skips and lorries.
  4. The Party Wall etc. Act 1996. Notice is due at least one month before digging within 3 metres of a neighbour's building and below its foundations. Work to a party wall needs two months.
  5. Building Regulations. Fire escape, ventilation, ceiling height and damp proofing are all checked.
  6. Waterproofing to BS 8102. Living rooms need grade 3 protection.

What goes into large London basements? A study of 4,650 basements granted in seven boroughs from 2008 to 2017 found gyms in 21.4% and pools in 8.0%. In large detached houses, 68.9% had a pool. Read our guides to a basement swimming pool and a home gym.

Where Craftex fits and where it does not

We are a London design and build team. We design the basement, appoint and manage the structural engineer and the party wall surveyors, dig, waterproof and finish the rooms, under one contract.

We are a good fit for new and extended basements under prime London houses. That includes basements with a pool, gym or cinema, and whole-house projects. Prime homes start from £100,000 with us. Every job carries £10M of insurance cover.

For a pool in the basement, see our guide to choosing indoor swimming pool builders.

Where Craftex is not the right fit

  1. Small cellar tanking. A waterproofing company will be better value.
  2. Damp repairs. A damp specialist suits this.
  3. Waterproofing-only jobs. If you only need a membrane or a sump pump, go to a waterproofing firm.

Prime home projects behind our basement work

We have no new-basement case study of our own published yet. The projects below show the structural and prime-home work a basement depends on.

450 m²Herbert Crescent: our senior team's earlier experience
12 weeksKensington Olympia: 400 sq m, every other flat occupied
£10MInsurance cover on every job

Herbert Crescent, Knightsbridge: a prime house beside its neighbours

Herbert Crescent is a 450 m² house refurbished in 32 weeks, with neighbours on every side. It is our senior team's earlier experience, from before Craftex.

Kensington Olympia: 400 sq m in an occupied building

At Kensington Olympia we designed and rebuilt a 400 sq m penthouse in 12 weeks. Every other flat in the building stayed occupied, which is the same discipline a dig next to neighbours needs.

Slingsby Place, Covent Garden: structure behind retained façades

Slingsby Place shows strip-out and structural works behind retained façades, on one of the tightest sites in central London. It was led by Martin Hickey, now our Preconstruction Director, in his earlier role.

I and my husband are very satisfied with Craftex's service and customer support. We bought a house in Hampstead and wanted to redesign and renovate it. On our initial free consultation with Sviat, we found out that we actually can do loft conversion and rear extension and add value to the property straight away. We worked with the Craftex design team to bring our vision to life and deliver planning approvals. At that time guys started stripping out to save time on the construction programme as we wanted to move in ASAP. We worked with very experienced project director Konstantin who was responsible for all aspects of project delivery from design to construction with a very good eye on details and customer care. We saved a lot of money by having professional advice from the start. Project management and quality at Craftex are at the highest level. Many thanks to Craftex Team.

Lia Lavryk, Google reviewSee all reviews on Google

Questions to ask every basement builder

Take these to each meeting. A builder who answers them clearly, in writing, deserves a place on your shortlist.

Our basement conversion team is happy to answer every one of these. If you are comparing basement builders now, book a site visit and put the questions to us.

Ten questions to ask every basement builder

  • Which two London basements like ours can we visit, and can we call the owners?
  • Who is the structural engineer, and who checks the temporary works?
  • Who serves the party wall notices, and who pays the surveyors?
  • Which waterproofing grade is designed, and who guarantees it?
  • How does our borough's basement policy shape the design?
  • Who writes the construction method statement and the traffic plan?
  • What does your programme assume for each approval?
  • What is excluded from your price?
  • What insurance do you hold, and can we see the certificates?
  • Who do we call if water comes in after handover?

Frequently asked questions

How do I choose basement builders in London?

Shortlist builders with finished London basements of your size. Ask who the structural engineer is, who handles the party wall and who guarantees the waterproofing. Visit a finished basement and call the owner.

Do I need planning permission for a basement in London?

Usually, for a new dig. Digging a new basement is likely to need planning permission, and many boroughs limit basements to one storey and part of the garden.

Who handles the party wall?

Your builder should plan it with you. Notice must be served before work starts, and surveyors agree an award with each neighbour who does not consent.

Who guarantees the waterproofing?

Agree it in writing before you sign. Ask which waterproofing grade is designed, who designs it, who installs it and who holds the guarantee.

How long does a London basement take?

It depends on the depth, the ground, the neighbours and the consents. The programme is set after a survey and the engineer's design.

What size of basement project does Craftex take on?

We take on whole basements and houses, from £100,000. We don't take on small cellar tanking, damp repairs or waterproofing-only jobs.

Refer a project

Earn 5–10% lifetime commission

from the revenue we generate from your introduction.

Architects, agents, developers, business owners: anyone can refer. Introduce a client and we pay you on their first project and every project after it, for as long as they work with us. The rate depends on the project and is agreed in writing before work starts.

Rates and conditions apply. See the referral terms.

Planning a basement under a London house?

One team designs, digs and finishes the basement and the house above it. Book a site visit and we will tell you what your house can take.

Reply within 1 hour, Mon–Sat 8am–6pm. Urgent? WhatsApp us for a reply straight away, any day.

WhatsApp us